You are on page 1of 1

(PREVIOUS SHEET No. XX) (NEXT SHEET No.

XX)
PLAN

ODRC HOUSING
KEY PLAN SURVEY LOCATION

N
E 635840.7616 N
N 2489779.0860

COMPLEX
STREET
E 635843.6430
N 2489778.2386
QL-B D=0.80m

RANJIT STORE
Power Line

SHA ERAL
GEN
PROJECT:
QL-B D=2.70m

TEMPLE
SUBSURFACE UTILITY ENGINEERING SURVEY
Telecom Line QL-B D=1.70m

NKA STO
Power Line OWNER : PWD

QL-B D=0.80m CONTRACTOR:

R
Shiv Shakti Plaza, Shop No. 104A, 1st Floor,
Power Line E 635848.5529 Mahavir Enclave, Delhi – 110 045
Off : +91-011-42470301
N 2489791.9062 GIS Surveys Private Limited

DATE DRAWING No. REV.

RE
04-08-2020 XXXXXXXXXXXXXXXXXXXXXXXXX 00
DRAWING TITLE:
UTILITY PLAN AND PROFILE
E E E E E E E
E E
E
E E E E E
E E E E E E E CHAINAGE:- 00.000KM - 00.866KM
E E E E NAME OF ROUTE : XX
T T T T T T T
E T
E
T T T T T
E E E E E E E SECTION LENGTH : xx.xxmtrs.
E E E E
PREPARED BY : XX
E E E E E E E E
E E E E E QA/QC BY : XX

W W W W W W W W APPROVED BY (CHIEF GEOPHYSICIST) : XX


W W
2.10 W W W

0.90
0.20

2.30
1.10
1.30

7.50
REV. DATE REVISION BY CHECK APP.
BY PEM ISSUED
BY

QL-A & D=1.60m SHEET No.

0
H = 1 : 200
L-SECTION

15
DH ROAD
V = 1 : 100 XX of XX
Water Line
QL-B D=0.80m SHEET SIZE
Power Line QL-B D=1.1m

MH
S S S S S S S S PLAN H/V = 1 : 200
S S S S S S S S A3
S S S S
LEGEND
Fresh Water Pipeline W
Sewer / Storm Water Pipeline S
Electric Cable E

47.665
40.000
30.000
Telephone Cable T

20.000
10.000
0.000

Gas Pipeline GAS


Oil Pipeline OIL
Unidentified Utility
Street Light Pole
Telephone/Electric Pole
Traffic Signal
DIAMOND HARBOUR ROAD DIAMOND HARBOUR ROAD
Fire Hydrant
Manhole / Chamber/Valve V
L-SECTION MH

Survey Corridor
EXPECTED SAFE PATH
ELECTRIC TELECOM ELECTRIC WATER ELECTRIC Gate / Tree
QL-B QL-B QL-B QL-B QL-B
8 D= 0.80m D= 0.2.7m D= 0.80m D= 1.1m D= 1.70m Temple / Church / Mosque

Dia= 50mm Dia= 40mm Dia= 50mm Dia= 200mm Dia= 50mm Petrol Pump
Transformer / Electric /
TF EJ TJ
7 Telephone Junction

Culvert / Bus Stand


E E E E E E E E E E E E E
6 W W W W W E W E W W W W W W W
Transverse Utility

E Ground Level
E E E E E NOTES:
5 D : Depth to top of utilities are in mtrs from Ground Level
All manholes depicted at QL 'A & C'.
All sewer lines depicted at QL 'B, A & D'.
DATUM 04m T T T T T T T T T T T T T All electrical cables/lines depicted at QL 'B, A & D'.
All water pipelines depicted at QL 'B, A & D'.
All gas pipelines depicted at QL 'B, A & D'.
All telecom cables depicted at QL 'B, A & D'.

Chainage

40.000

47.665
00.000

20.000

30.000
10.000

DISCLAIMER:
The findings presented in this report are based on the SUE
exercise conducted by RCE (I) according to standards set for

(m) such surveys by experienced personnel. However due to inherent


limitations of the indirect techniques, there
discrepancies for which company does not
might be
own the
responsibility for any damage to the utilities, equipments or
manpower arising out of such discrepancies.

Ground Levels
7.000

7.000

7.000

7.000

7.000

7.000
CAUTION NOTE:

(m) UTILITY CROSS OVER NOTE:

You might also like