You are on page 1of 5

Document No PRO-TEC-HSE-1.0-0.

0-T02

RISK ASSESSMENT Revision No. 0


Page No. 1 of 5

RISK ASSESSMENT FOR

Acrylic Letters

Name of Company

RA No. PRO-TEC-HSE-1.0-0.0-T02

Revision No. 01

DESCRIPTION TITLE SIGNATURE DATE

Prepared By Aries Dalisay 06 06.07.2023

Reviewed By Vigil Powell 06.07.2023

Approved By Vigil Powell 06.07.2023

This template is for guidance purposes only specifying the recommended contents of a risk assessment to be submitted to LAD
as part of the Permit to Work process. Any additional information should be as per the scope of the works requirements.
Document No PRO-TEC-HSE-1.0-0.0-T02

RISK ASSESSMENT Revision No. 0


Page No. 2 of 5

Risk Additional Control Risk Evaluation


Evaluation Measures
Activity Hazard/Aspect Consequences Existing Control Measures (with additional control
measures)
(with existing (If required)
control measures)

P S R P S R

Supervisor should
communicate the procedure
Ergonomics with the workers in pre-work
briefing and tool box talks.
Manual Handling
(Due to bad posture) Training should be conducted
(for materials shifting
purposes) Musculoskeletal about the proper manual 1 2 2 Not Required 1 2 2
injuries handling techniques.
Use proper PPE such as gloves
to avoid hand injuries due to
sharp edges.
Ensure all area is thoroughly
inspected by competent person
prior to mobilize.

Safety briefing to all involved


workers carried out by the
supervisor in-charged.
Trip and Falls on same Minor or Major The removal of unwanted
level injuries materials or debris. 1 2 2 1 2 2
Used the permanent Not Required
access/egress towards the
area. Full body harness must
be worn and hook on the
proper anchoring point.

Following PTW system.


Hand tools being use Wrong used and The appointment of competent
such as selection of hand tools workers.
which could cause Minor or Major Safety briefing to all involved Not Required
(Pencil or marker,
measuring tape etc.) personnel or hand prior to mobilize by the
injuries. injuries supervisor in-charged. 1 2 2 1 2 2
Appropriate selection of hand
tools being use.
Suitable PPE required for the
Task. Hard hat, safety boots,
coverall etc.
1 2 2
Workers will take regular 1 2 2
Fatigue due to breaks and supervisors will

This template is for guidance purposes only specifying the recommended contents of a risk assessment to be submitted to LAD as part of the Permit to Work process. Any additional information should
be as per the scope of the works requirements.
Document No
RISK ASSESSMENT Revision No. 0
Page No. 3 of 5

extended working Minor or Major observe workers for signs of


hours injuries fatigue. Welfare facilities are Not Required
provided for workers to take
breaks from work.
Implementing the job Rotation.

By means of job rotation of the


workers involved.
(Every20 minutes).
Ergonomics Following PTW system.
The appointment of competent
(Due to overhead Minor and Major workers.
Safety briefing to all involved 2 1 2 Not Required 1 2 2
activities and bad injuries prior to mobilize by the
supervisor in-charged.
posture) Suitable PPE required for the
Task. Hand gloves to avoid
hand injuries, safety shoes,
hard hat, coverall

Workers will take regular


breaks and supervisors will
Fatigue due to observe workers for signs of Not Required
extended working Minor or Major fatigue. Welfare facilities are 1 2 2 1 2 2
hours injuries provided for workers to take
breaks from work.
Implementing the job Rotation.

Ocular inspection of the


workplace area prior to Not Required
mobilize.
Housekeeping Slip, Trip and Falls Minor or Major Access and egress must be 1 2 2 1 2 2
injuries free from any obstruction. The
provision and used of suitable
PPE required for the tasked.

 Enusre the work area


Usage of portable hand *Bodily injury should be free of tripping
held power tools. resulting from a hazard.
Cluttered work area Minor or Major
injuries  Ensure Training for all
*Slipping users of power tools. 2 2 4 2 2 4
 Ensure personal PPE is
Inexperience or being worn by all operatives. Not Required
rusty  Make sure that the tool is
in good condition, the

This template is for guidance purposes only specifying the recommended contents of a risk assessment to be submitted to LAD as part of the Permit to Work process. Any additional information should
be as per the scope of the works requirements.
Document No
RISK ASSESSMENT Revision No. 0
Page No. 4 of 5

battery is firmly in place.


*Eye injury
*Hearing injury
- Use ladders for access only and
Working at Heights - Slips and trips Minor or Major not to work off
using ladders causing injuries - Portable ladders over 6.0M should
injury not be used
- Portable ladders must be
- Fall from height restrained to prevent ladder slip
causing Injury or movement 1 2 2 Not Required 1 2 2
- When climbing ladders, 3 points of
- Falling objects contact must be
possibly maintained at all times
injuring persons - All tools and
below

This template is for guidance purposes only specifying the recommended contents of a risk assessment to be submitted to LAD as part of the Permit to Work process. Any additional information should
be as per the scope of the works requirements.
Document No
RISK ASSESSMENT Revision No. 0
Page No. 5 of 5

This template is for guidance purposes only specifying the recommended contents of a risk assessment to be submitted to LAD as part of the Permit to Work process. Any additional information should
be as per the scope of the works requirements.

You might also like