[Yesterday 10:07 PM] Dave Nwosu (Guest)

Good morning All Dave Nwosu CEO Nevadic Limited

[Yesterday 10:11 PM] Johnny Malaka (Guest)

Good Morning All,

[Yesterday 10:12 PM] Johnny Malaka (Guest)

Malaka Johnny

Litewell Completions Services

Project Engineer

[Yesterday 10:20 PM] Charles (Guest)


What appendix will the workers welfare form be added to.

[Yesterday 10:21 PM] Temitope.O.Ilusemiti (Guest)

Thank you for sharing those Updated Well Summary data however, I have some few clarifications

1. For the Bonga Main (Producer well), you specified that the Tubing is 4-1/2” 13CR but  the Equipments Metallurgy
to be provided are all Incoloy 718.  We understand the requirement for Flow wetted area of 718 for some equipment
however this is not the case as the request is for All Equipment in Incoloy 718 for the Producer wells. Kindly clarify.

2. Still on Bonga Main, you stated the tubing is 4-1/2” 13CR and all the other completions Equipments(TRSCSSV,
Gauge mandrel, Nipples  are all 4-12/” sizes, however for the Production packer you stated 9-5/8” x 5-1/2”. Please
clarify

[Yesterday 10:26 PM] Decoon Tender (Guest)


Can we use more than one technical partner? - De Coon Services Limited
(1 liked)

[Yesterday 10:29 PM] Decoon Tender (Guest)


Secondly, We request that the tender be extended further since the closing date is few days from today
(1 liked)

[Yesterday 10:31 PM] Temitope.O.Ilusemiti (Guest)

Thank You

[Yesterday 10:32 PM] Phil Stone (Guest)

Phil Stone - Tendeka

[Yesterday 10:33 PM] Lateef Amodu (Guest)


Lateef Amodu

[Yesterday 10:33 PM] NSIDIBE ALEXANDER (Guest)


NSIDIBE ALEXANDER- STIS
(1 liked)

[Yesterday 10:33 PM] Lateef Amodu (Guest)


Lateef Amodu

[Yesterday 10:33 PM] Usen Emmanuel (Guest)


USEN EMMANUEL - MULTI INTEGRAL

[Yesterday 10:33 PM] Seye Thomas (Guest)

Seye Thomas -Halliburton BD Manager

[Yesterday 10:33 PM] Segun (Guest)


Segun Olorunsola (Librod)

[Yesterday 10:33 PM] Lateef Amodu (Guest)


Lateef Amodu - Zigma Limited 

[Yesterday 10:33 PM] Azmi, Sherif (Guest)

Sherif Azmi - Senior Area Manager (Sub-Saharan Africa)- Weatherford

Edited

[Yesterday 10:33 PM] Decoon Tender (Guest)


Judith Emengo - De Coon Services Limited

[Yesterday 10:33 PM] Dave Nwosu (Guest)


Good morning All Dave Nwosu CEO Nevadic Limited

[Yesterday 10:33 PM] Da-Costa Shado (Guest)

Da-Costa SHado _ SLB Sales and Commercial

[Yesterday 10:33 PM] Edith (Guest)


Ukah Edith (Librod Energy Services Ltd)

[Yesterday 10:34 PM] Scott Allen (Guest)


Scott Allen - Halliburton

[Yesterday 10:34 PM] Elvis Chindah (Guest)


Elvis Chindah-Melvon

[Yesterday 10:34 PM] Olusegun Olabiyi (Guest)

Olusegun Olabiyi_ SLB Sales and Commercial_WCF


[Yesterday 10:34 PM] Folasade Sim-Afe (Guest)

Folasade Sim-Afe - Halliburton

[Yesterday 10:34 PM] Rufus Kolawole (Guest)

Rufus Kolawole (SOWSCO Well Services Nig. Ltd)

[Yesterday 10:35 PM] Adegoke, Ayodeji A (Guest)

Adegoke Ayodeji - Baker Hughes

[Yesterday 10:35 PM] Wahid Obari (Guest)

Wahid Obari - Schlumberger

[Yesterday 10:35 PM] Victor Okengwu (Guest)

Victor Okengwu Halliburton

[Yesterday 10:35 PM] Iwedi Learning - Eslobose (Guest)


Iwedi Learning - ESLOBOSE INTEGRATED SERVICES LIMITED

[Yesterday 10:35 PM] Romulo Cueva (Guest)

Romulo cueva - Halliburton

[Yesterday 10:36 PM] Eke, Kelechi Bright (Guest)

Kelechi Eke - Baker Hughes

[Yesterday 10:36 PM] Iwuala, Esther N (Guest)

Thank you for setting up this call, SNEPCo team. We would like to confirm with regards to the lumpsum payment model,
when COMPANY intends to make payment for purchased equipment. Will this be upon delivery as per the acceptance
criteria weighting which has been put at 40% for successful delivery. Will contractor be required to wait till after installation
of these equipment before expecting payment?

Edited

[Yesterday 10:37 PM] Johnny Malaka (Guest)

Malaka Johnny

Litewell Completions Services

Project Engineer
[Yesterday 10:38 PM] Chukwu, Ginika (Guest)

Ginika Chukwu - Weatherford

[Yesterday 10:38 PM] Ekpe, Sandra Mgboeze (Guest)

Sandra Ekpe - Baker Hughes

[Yesterday 10:43 PM] Temitope Fadahunsi (Guest)

what is SNEPCo's expectation when they request we bring equipment into country for wells planned, but then they
don't ever use them due to changes

[Yesterday 10:43 PM] Alessandro Torchiana (Guest)

Are the line items pricing ONLY for items not included in the lump sums?

[Yesterday 10:43 PM] Ologunkeji, Oluseyi (Guest)

Oluseyi Ologunkeji - Technical Sales Manager Weatherford

[Yesterday 10:43 PM] Ologunkeji, Oluseyi (Guest)

Oluseyi Ologunkeji - Technical Sales Manager Weatherford

[Yesterday 10:45 PM] Ngerebara, Justus A SNEPCO-PTW/O/NG

please correct screen size is 5-1/2" for both injectors and producers

[Yesterday 10:45 PM] Adedapo Kayode (Guest)

Kayode Adedapo - Ariosh Ltd

[Yesterday 10:46 PM] Osamudiamen Ehondor (Guest)

Commercial Clarification from Maerlin Limited: SECTION V SCHEDULE OF PRICES, Art. 1.2:  We request the opportunity to
negotiate pricing at the end of the fixed period of the contract, prior to eventual contract extension.

The proposed Retrievable Casing Bridge Plugs for the Upper Completion package are not sellable Goods and remain our
partners property throughout the duration of the contract, managed by Maerlin Ltd.  Should plugs be set long term in well,
In-well rental will be capped at LIH value. Plug will remain our property will be returned to Maerlin Ltd when retrieved from
well.
[Yesterday 10:46 PM] Zi Chollom (Guest)
Zi Chollom - Wellbore Cleanup Services- Standard Testing and Inspection Services Ltd

[Yesterday 10:47 PM] Canisius Assaah Yella (Guest)

Yella Canisius Sales Manager Schlumberger

[Yesterday 10:48 PM] Temitope.O.Ilusemiti (Guest)

Temitope Ilusemiti- Account Manager-Schlumberger

[Yesterday 10:49 PM] Ogueli, Okechukwu P (Guest)

Okechukwu Ogueli - Account Manager Weatherford.

[Yesterday 10:49 PM] Ologunkeji, Oluseyi (Guest)

Some OH lengths are missing in the revised well data sheet - this will affect costing the required joints of screens

(2 liked)
[Yesterday 10:49 PM] Ologunkeji, Oluseyi (Guest)

Some OH lengths are missing in the revised well data sheet - this will affect costing the required joints of screens

(2 liked)

[Yesterday 10:53 PM] Eke, Kelechi Bright (Guest)

yes

[Yesterday 10:53 PM] Temitope.O.Ilusemiti (Guest)

yes

[Yesterday 10:54 PM] Eke, Kelechi Bright (Guest)

Are we getting another extension please?

[Yesterday 10:54 PM] Kenneth Johnson (Guest)

Ken Johnson - HAL - When will we have a REVISED Schedule 9B.1 for WBCO, Fluids, etc ?

[Yesterday 10:54 PM] Eke, Kelechi Bright (Guest)

Thank you
[Yesterday 10:56 PM] Moneke, Jonathan U (Guest)

we will appreciate an extension because of the changes communicated

(1 liked)

[Yesterday 10:57 PM] Temitope.O.Ilusemiti (Guest)

Kindly consider an extension of 1months considering the recent update that has been made which we need to consider in
the package submission Thank you

(2 liked)
[Yesterday 10:57 PM] Temitope.O.Ilusemiti (Guest)

Kindly consider an extension of 1months considering the recent update that has been made which we need to consider in
the package submission Thank you

(3 liked)

[Yesterday 11:02 PM] Temitope Fadahunsi (Guest)

There are missing OH length for Bonga Nose 1, 738W3, 690P3, 692P1 in the well data, can you please update? What interval
length will be used for wells with CHFP design where they are optional scenarios.

[Yesterday 11:04 PM] Adegoke, Ayodeji A (Guest)

Will equipments be requested per well or in batches? considering Lead times

[Yesterday 11:09 PM] Temitope Fadahunsi (Guest)

Can we have the well schedule for the wells planned for this tender

[Yesterday 11:15 PM] Temitope Fadahunsi (Guest)

The average length of 1000ft for OH is for the ones with missing well data. Kindly clarify. Better still, can these be updated in
the proposed planned update well data sheet. We have some wells with up to 2200ft of OH

[Yesterday 11:33 PM] Temitope Fadahunsi (Guest)

ok sir

[Yesterday 11:34 PM] Temitope.O.Ilusemiti (Guest)

PDHG – The request on Sec IV is for 20Kpsi pressure and Temp Max 180degC, looking at the well Parameter of 6000psi
Reservoir Pressure Max, Max Temp of 135degC, Do you need a 20K rating? Specification will further drive up your cost for
both parties

[Yesterday 11:35 PM] Temitope.O.Ilusemiti (Guest)

Justus-Putting the question on the PDHG here so it can be captured


[Yesterday 11:35 PM] Oluwayimika (Guest)

Oluwayimika Oyedipe- Completion Engineer, Standard Testing & Inspection Services Limited

[Yesterday 11:36 PM] Olusegun Olabiyi (Guest)

Ok, thanks

[Yesterday 11:36 PM] Usen Emmanuel (Guest)

Emmanuel Usen - Multi Integral

[Yesterday 11:37 PM] Olusegun Olabiyi (Guest)

The washpipe was included on the list of equipment for the WBCU scope. They are usually provided by the drilling
contractor. Please help clarify if tenderer is required to provide same. Thanks

[Yesterday 11:38 PM] Temitope.O.Ilusemiti (Guest)

we will appreciate a month please for an excellent Bid submission. Thanks

[Yesterday 11:38 PM] Austine (Calaya Engineering Services Limited) (Guest)

Austine Calaya of Calaya Engineering, confirm tender submission extended by 2 weeks?

[Yesterday 11:38 PM] Iwuala, Esther N (Guest)

Thank you for your time SNEPCo team

[Yesterday 10:33 PM] Edafe (Western Development Company Ltd) (Guest)


Cooke Edafe -Western Development Company Limited 