Thank you for sharing those Updated Well Summary data however, I have some few clarifications
1. For the Bonga Main (Producer well), you specified that the Tubing is 4-1/2” 13CR but the Equipments Metallurgy
to be provided are all Incoloy 718. We understand the requirement for Flow wetted area of 718 for some equipment
however this is not the case as the request is for All Equipment in Incoloy 718 for the Producer wells. Kindly clarify.
2. Still on Bonga Main, you stated the tubing is 4-1/2” 13CR and all the other completions Equipments(TRSCSSV,
Gauge mandrel, Nipples are all 4-12/” sizes, however for the Production packer you stated 9-5/8” x 5-1/2”. Please
clarify
Thank You
Edited
Thank you for setting up this call, SNEPCo team. We would like to confirm with regards to the lumpsum payment model,
when COMPANY intends to make payment for purchased equipment. Will this be upon delivery as per the acceptance
criteria weighting which has been put at 40% for successful delivery. Will contractor be required to wait till after installation
of these equipment before expecting payment?
Edited
Malaka Johnny
Project Engineer
[Yesterday 10:38 PM] Chukwu, Ginika (Guest)
what is SNEPCo's expectation when they request we bring equipment into country for wells planned, but then they
don't ever use them due to changes
Are the line items pricing ONLY for items not included in the lump sums?
please correct screen size is 5-1/2" for both injectors and producers
Commercial Clarification from Maerlin Limited: SECTION V SCHEDULE OF PRICES, Art. 1.2: We request the opportunity to
negotiate pricing at the end of the fixed period of the contract, prior to eventual contract extension.
The proposed Retrievable Casing Bridge Plugs for the Upper Completion package are not sellable Goods and remain our
partners property throughout the duration of the contract, managed by Maerlin Ltd. Should plugs be set long term in well,
In-well rental will be capped at LIH value. Plug will remain our property will be returned to Maerlin Ltd when retrieved from
well.
[Yesterday 10:46 PM] Zi Chollom (Guest)
Zi Chollom - Wellbore Cleanup Services- Standard Testing and Inspection Services Ltd
Some OH lengths are missing in the revised well data sheet - this will affect costing the required joints of screens
(2 liked)
[Yesterday 10:49 PM] Ologunkeji, Oluseyi (Guest)
Some OH lengths are missing in the revised well data sheet - this will affect costing the required joints of screens
(2 liked)
yes
yes
Ken Johnson - HAL - When will we have a REVISED Schedule 9B.1 for WBCO, Fluids, etc ?
Thank you
[Yesterday 10:56 PM] Moneke, Jonathan U (Guest)
(1 liked)
Kindly consider an extension of 1months considering the recent update that has been made which we need to consider in
the package submission Thank you
(2 liked)
[Yesterday 10:57 PM] Temitope.O.Ilusemiti (Guest)
Kindly consider an extension of 1months considering the recent update that has been made which we need to consider in
the package submission Thank you
(3 liked)
There are missing OH length for Bonga Nose 1, 738W3, 690P3, 692P1 in the well data, can you please update? What interval
length will be used for wells with CHFP design where they are optional scenarios.
Can we have the well schedule for the wells planned for this tender
The average length of 1000ft for OH is for the ones with missing well data. Kindly clarify. Better still, can these be updated in
the proposed planned update well data sheet. We have some wells with up to 2200ft of OH
ok sir
PDHG – The request on Sec IV is for 20Kpsi pressure and Temp Max 180degC, looking at the well Parameter of 6000psi
Reservoir Pressure Max, Max Temp of 135degC, Do you need a 20K rating? Specification will further drive up your cost for
both parties
Oluwayimika Oyedipe- Completion Engineer, Standard Testing & Inspection Services Limited
Ok, thanks
The washpipe was included on the list of equipment for the WBCU scope. They are usually provided by the drilling
contractor. Please help clarify if tenderer is required to provide same. Thanks