ESHAAN CONSTRUCTION

Date : 15th December 2021

To,

Adani Realty
601, Hallmark Plaza,
BKC, Mumbai – 400051.

Kind Attn. : Mr. Deepak Yadav Sir


Reference: email dated 15/12/2021 checklist for turnkey civil work.

Dear Sir,

This has reference of your mail dated 15/12/2021 regarding checklist for merit, we hereby furnish the details in
writing below and supporting documents (if needed) for your kind perusal.

1. Overall experience in construction industry: 10 Years of experience in construction industry.


ESHAAN Construction founded in 2007, has grown to be one of the most reputed firms of Fabrication, Civil Engineering
Construction work in Mumbai. The Company has completed projects of a varied nature including Residential and
commercial, Institutional buildings, turnkey projects etc. Working in conjunction with reputed firms of Architects,
Consulting Engineers and Works Authorities,

2. List of completion project

Sr.
Project Name Developer Name Location Area Year
No.
1 Hubtown Greenwoods Hubtown Ltd. Thane 5,50,000 Sq.Ft. 2018

2 Royce Paradise Royce Developer Kalyan 2,00,000 Sq.Ft. 2019

3 The Icon China State Cons. Thane 5,20,000 Sq.Ft. 2020

4 Tatva Tower Gitanjali Developer Borivali 4,40,000 Sq.Ft. 2018


20,00,000
5 Interface Project K Raheja P. Ltd. Mulund 2011
Sq.Ft.
6 Runwal Pride Runwal Group Mulund 2,20,000 Sq.Ft. 2011

7 Raheja Heights K Raheja P.Ltf. Goregaon 1,10,000 Sq.Ft. 2016

8 Shree Ganesh CHSL. Matoshree Devlp. Goregaon 1,20,000 Sq.Ft. 2014


Bhavya 40,000 Sq
9 Renu CHSL Vileparle 2010
Infrastructure Ft.

9, Saket Complex, Thane (W), 400601 | contact@eshandevelopers.com | www.eshandevelpors.com | 9920751369


ESHAAN CONSTRUCTION
3. List of working projects

Sr.
Project Name Developer Name Location Area Work Scope
No.
1 The Icon 2nd Phase China State Thane 2,50,000 Sq.Ft. Shell n Core

2 Vaibhavi City Vaibhavi Developer Kalyan 3,00,000 Sq.Ft. Turnkey

3 Orbis Project Romell Developer Andheri 2,00,000 Sq.Ft. Shell n Core

4 Arihant Sky Arihant Developer Sion 1,50,000 Sq.Ft. Shell n Core

5 V Residence V Power Const. Sion 1,00,000 Sq.Ft. Turnkey

4. List of Machinery

Sr. No. Item Description Nos.


1 Tower Crane (50 Mtr.) 2
2 Temporary Lift (Allmark) 4
3 Construction Lift (M.S. Scaffolding 20 floors) 8
4 Concrete Mixer 7/10 8
5 Portable Concrete Mixer 6
6 ACRO Props 5000
7 ACRO Span (3m - 5.5m) 1000
8 ACRO Span (2.5m – 4.5m) 5000
9 ACRO Span (2m – 3.75m) 1000
10 ACRO Span (1.5m – 2.75m) 1000
11 Dewatering Pumps 12
12 Vibrator Electric 34
13 Vibrator Petrol 10
14 Needle 40 40
15 Needle 60 40
16 Gas Cutting 10
17 Welding machine set 10
18 Steel Cutting Machine 8
19 Steel binding machine 8
20 Tread machine 2
21 Sand Screeing 4
22 Curing pump 12
23 Drill Machine 8
24 Wheel barrow 30
25 Diesel Generator set 2

9, Saket Complex, Thane (W), 400601 | contact@eshandevelopers.com | www.eshandevelpors.com | 9920751369


ESHAAN CONSTRUCTION

5. List of Shuttering:

Sr. No. Item Description Nos.


1 Shuttering plastic coated plywood As Per Requirement
2 ISMB and ISMC section 200 Mtt.
3 M.S. Tubler section 200 Mtt.
4 H Frame with bearing 2000
5 Cup Lock system for Shuttering 1,00,000 Sq.ft.
6 MS Props 5000
7 MS Span 5000
8 Aluminum Foam work (Mivan) & Tac aluminum foam work Prepare as per design

6. No. Of Employees and present labour strength

Sr. No. Designations Nos.


1 Tendering and Estimation 02
2 Project Manager 04
3 Project Engineer 05
4 Site Engineer 15
5 Material procurement 02
6 Account 04
7 Site Supervisor 30
8 Safety 04
9 Skilled Labor 1500
10 Semi skilled labor 2200

Labour force is depend on volume of work. We have our in house Architecture team.

7. Turnover of Company
Eshaan construction execute average completed work including barter Construction around 1 million sqft. i.e.+125cr

8. References
Past completed references
Name of project : Hubtown Greenwoods Name of project : Renu CHSL.
Developer Name : Hubtown Developer Developer Name : Bhavya Infrastructure
Contact person : Mr. Praful Contact person : Mr. Shah
Contact Number : 9870986032 Contact Number : 9833816257

9, Saket Complex, Thane (W), 400601 | contact@eshandevelopers.com | www.eshandevelpors.com | 9920751369


ESHAAN CONSTRUCTION

Name of project : Royce Paradise


Developer Name : Royce Developer
Contact person : Mr. Sanjay Patil
Contact Number : 9820201281

Present working references

Name of project : V Residence


Developer Name : V Power Construction
Contact person : Mr. Pankaj, M.D.
Contact Number : 9820030311

Name of project : Vaibhavi City


Developer Name : Vaibhavi Developers
Contact person : Mr. Sanjay Patil
Contact Number : 9820201282

Our Esteems Client are:

9, Saket Complex, Thane (W), 400601 | contact@eshandevelopers.com | www.eshandevelpors.com | 9920751369


ESHAAN CONSTRUCTION

9. Safety review system

Elements Process of Review Marks


Health and Safety To determine whether the documented Training/information given to all
Management arrangements and procedures are effectively staff on contents of SMS and how to
System(s) and communicated to all employees on site. complete relevant forms etc.
Arrangements
To ensure the safety management system(s) (SMS)
content is readily available, easy to follow and that
staff have a good awareness of relevant content.
Competent To ensure that management on site has received Suitable training commensurate
Occupational Health the appropriate training and information to enable with the risks of the business and
and Safety (OH&S) them to implement the requirements of the SMS. role responsibilities. (NEBOSH
Personnel Construction Certificate or similar
To ensure competent advice and support is for H&S appointee – National
available for on site management. Construction College/CITB
accredited courses – Site
Management Safety
Training Scheme for management.
Consultation and To ensure the site receives regular communication Health and safety
Communication from Head Office on OH&S issues. bulletins/newsletter/notice board
Formal communication
To confirm that a system is in place which enables Management reports
employees to raise OH&S issues and receive Minutes of health and safety
feedback. committee/team meetings
Evidence of staff involvement in
To confirm staff representation at health and safety
OH&S issues
committee meetings.
Suggestion schemes
To confirm clear lines of communication Pre-contract meetings – daily or
between principle contractors and sub- weekly
contractors/suppliers. progress meetings – inclusion in
works council/
safety committee meetings.
Competence and To confirm that all staff are appropriately trained Training plan(s) and records
Training to carry out their tasks competently. Job description/role profile
Certification, licences, CSCS cards
To ensure a suitable OH&S induction process is in etc.
place on site. Appraisal process and CPD plans
Induction process.
To ensure that staff development and training
needs are continually reviewed including any
mandatory refresher training
First Aid Facilities To ensure that adequate first aid resources First aid assessment
(personnel and equipment) are in place on site. First aid equipment/facilities

9, Saket Complex, Thane (W), 400601 | contact@eshandevelopers.com | www.eshandevelpors.com | 9920751369


ESHAAN CONSTRUCTION
(including To confirm that: Occupational health facility
Occupational • Staff health and wellbeing is monitored available at site level
Health) • Promotion of a healthy balance between work Health surveillance and lifestyle
and personal life is in place including health promotions
surveillance Return to work policy
• Absence monitoring and where appropriate
return to work plans are in place
• Emergency first aid is available for others on site.
Workplace To ensure all areas of the workplace are subject Inspection schedule/programme
Inspections and to regular inspection and when non conformities Identified actions monitored for
Internal Auditing are raised, they are dealt with in a timely manner. completion and signed off in a
timely manner.
To confirm the site has been subject to a suitably Competent personnel to carry out
detailed internal health and safety audit. inspection(s).
Management involvement in
inspection process audit report(s)
and schedule.
Input from head office.
Management of To ensure that whenever any organisational or Risk assessment of potential impact
Change site level change occurs, all potential issues on H&S of change.
affecting health and safety are suitably assessed Communication of assessment
and managed in an appropriate manner. findings.
Traffic Management To ensure suitably robust policies and procedures Traffic management risk assessment
and Access Routes are in place to manage the risks associated with One way circuits, speed limits,
LGV and mobile plant movement, to include site speed reduction schemes and lines
based and visiting vehicles. of visibility.
Loading and delivery locations managed to reduce Records of inspections.
risk and maintain control, with reversing Segregation of pedestrians and all
minimised or controlled. vehicles.
Site access and egress for vehicles is managed Suitable lighting, crossing points and
to reduce risks to public routes and nearby signs.
businesses. Trained banksmen for reversing
areas.
To ensure access and egress routes for Implementation of controls.
pedestrians are managed to reduce the risk of
interaction with vehicles and plant.
Control of To ensure that there are suitable control systems Contractor selection and approval
Contractors in place on site to reduce risk presented to documentation.
employees, others and property by the activities Contractor Induction and ID.
of contractors. Approved contractor register.
All equipment brought to site by sub-contract Monitoring of contractor
personnel subject to initial and continued performance.
inspection. Risk assessment(s)/method
statement(s).
Site induction.
Risk Assessment To ensure suitable, sufficient and current risk Specific and generic risk
and Safe Working assessments have been carried out at site level assessments covering routine and
Practices non routine tasks.

9, Saket Complex, Thane (W), 400601 | contact@eshandevelopers.com | www.eshandevelpors.com | 9920751369


ESHAAN CONSTRUCTION
which identify hazards and assess risks to workers Tool box talks/team briefings
and others who may be affected by the /training records.
undertakings of the organisation. Management and staff awareness
To ensure identified controls are effectively Safe working procedures
implemented. (operational control)

To confirm risk assessments have been


communicated to all relevant personnel.

To review subsequent safe working procedures


and practices, ensuring they are carried out in a
safe and effective manner.
Work Equipment To ensure that suitable procedures and controls Planned preventative maintenance
are in place for the provision and safe use of work programme.
throughout the site, including both administrative Risk assessment(s).
and operational measures. Maintenance records.
Inspection records (including
Equipment to be audited will depend upon thorough examination)
nature of activities being undertaken. Adequate space/access to work
Power tools.Pressurised cylinders and ancillaries. equipment.
Static plant (compressors – generators etc.). Hand tools in good order, inspected
Any other items identified by auditor. and stored correctly.
Defect reporting system.
Emergency stop controls and signage
Mobile Plant and To ensure all aspects of vehicle safety management Risk assessment
Vehicles are controlled and managed throughout the site, Licences and training records
including material and equipment delivery vehicles. Pre-use and periodic inspections by
Suitable ROPS/FOPS and seat belts maintained. drivers/operators and management
Service and maintenance records
To ensure all site based mobile plant and vehicles Records of seat belt wearing being
are subject to inspection and maintenance monitored and managed.
programmes. All vehicles and mobile plant are
suitable for activities, including visibility and
manoeuvrability
Working at Height To ensure all activities that involve working at Risk assessments and safe systems
height are suitably planned and controlled. of work.
Written procedures and suitable management Permits to work or temporary work
competence for activities being conducted. authorisation.
Suitable equipment (MEWP – ladder – roof Equipment inspection records.
access – formwork access) being employed. Activities to be observed to ensure
personnel are following the
hierarchy of control.
Edge protection systems (including
working over water).
Scaffolding To review all arrangements regarding how the Risk assessments and safe systems
erection, maintenance and dismantling of of work.
scaffolding is assessed and managed to prevent falls Temporary work authorisations
from height and collapse. Authorisations.

9, Saket Complex, Thane (W), 400601 | contact@eshandevelopers.com | www.eshandevelpors.com | 9920751369


ESHAAN CONSTRUCTION
Selection of suitable scaffolders
Suitable selection of contract scaffolders. (National Access and Scaffolding
Suitable mobile tower scaffolds employed. Confederation registered).
PASMA accredited training for
mobile tower use.
Inspection records.
Equipment storage and maintenance
Lifting Operations To review all arrangements regarding operations Risk assessments and safe systems
and Equipment requiring lifting of equipment and personnel. of work.
Written procedures covering: Authorisations, Selection and
• Suitable equipment selection and assessment of contractors
maintenance Training records (appointed
• Competent personnel conducting activities persons, slingers,
• Management of danger zones and exclusion banksmen etc.)
areas
• Methods of communications suitable for
activities conducted.
Excavations To review all arrangements regarding the design Risk assessments and safe systems
and management of all hazards associated with of work.
all excavations, cofferdams and caissons. Permits to work or temporary work
Authorisations.
Suitable management controls are evident across Training records.
the site, including permits to excavate, UG and Daily inspection records.
OH services management and protection from Suitable protective devices/
vehicles and materials, fumes and water ingress. procedures being followed
Suitable support systems and access/egress dependent upon nature of
means. excavation.
Signs, barriers and stop blocks
evident and maintained.
Control of To review arrangements (including storage and Hazardous substance index COSHH
Hazardous labelling) for the control of potential exposure of assessments/safety data sheets.
Substances persons and the environment to substances Asbestos survey and register
hazardous to health (including asbestos Legionellosis survey/assessment.
management). Training records.
Storage and security facilities
PPE
Spillage/leak procedures
Electrical To review arrangements and controls intended to Maintenance, test and inspection
Installations, prevent the risk of electrocution from portable or records.
Equipment and fixed electrical appliances and/or systems. Risk assessments/safe working
Portable Appliances Suitable access limitations to electrical procedures.
installations. Secure access to high voltage
Isolation and lock out procedures. /electrical equipment locations
Protection from UG/OH high voltage lines. Goalposts, safety zones, equipment
selection and CAT scanning.
To ensure legislative duties in respect of the All hand tools 110v or battery
above are being met. operated where appropriate.
Safety Signage To ensure appropriate health and safety signage is Risk assessments

9, Saket Complex, Thane (W), 400601 | contact@eshandevelopers.com | www.eshandevelpors.com | 9920751369


ESHAAN CONSTRUCTION
and Notices prominently displayed throughout the site Fire and emergency information
including: signage
• H&S legal poster Inspection records.
• Mandatory, prohibition, warning safe
condition signage
• Fire escape route and other emergency
information signage.
Public Protection To confirm suitable protection measures have been Fences and barriers – including
introduced and managed to reduce the gates and access control.
risks to members of the public or neighbours. Contact with schools if children
trespassing is a potential.
Interaction with neighbouring
business.
End of shift site safety and security
checks (materials, stacking and
storage, vehicles, access to scaffold
and ladders, excavations, CoSHH
items etc.).
Traffic and pedestrian management
if working on or near public access
routes.
Accident, Incident To ensure procedures are in place for the reporting Safe working procedures.
and Near Miss of all accidents and incidents (including near miss Accident/incident report data.
Reporting and and damage) and that such events are subsequently Investigation documentation.
Investigation investigated to prevent re-occurrence. Site reports to management.
To confirm all relevant incidents/accidents are First aid record.
reported to the relevant authorities as required.
Workplace To ensure adequate welfare and hygiene Risk assessments
Welfare facilities (including toilets, rest area, canteen, Inspection records
Facilities changing area, etc.) have been provided for Cleaning schedule(s)
employees and other site personnel. Waste transfer notes

To ensure general and specific waste is collected


and disposed of in a suitable manner.
Personal To confirm suitable PPE is available to all relevant PPE assessment
Protective staff. PPE records
Equipment To confirm assessment of PPE requirements has Training records
(PPE) been carried out. Storage and cleaning facilities
To ensure process for replacement of PPE is in
place.
To confirm staff awareness and use of PPE.
Housekeeping To confirm management of the work area to Material storage and waste
prevent slip, trip and fall injuries and reduce management
fire risk. Segregation of pedestrian routes and
materials
Fire Risk Assessment To ensure a suitable and sufficient fire risk Evidence of identified actions closed
assessment(s) has been carried out on site which out
identifies the hazards and associated risks of fire.

9, Saket Complex, Thane (W), 400601 | contact@eshandevelopers.com | www.eshandevelpors.com | 9920751369


ESHAAN CONSTRUCTION
To ensure all identified controls are being Hot work permits being issued
effectively implemented. where required.
To confirm that the risk assessment content has Training records
been effectively communicated to relevant Inspection records
personnel. (briefings/meetings,
etc.)
Fire Fighting To ensure that there is adequate fixed/portable Maintenance and inspection records
Equipment fire-fighting equipment available on site and that Training records
such equipment is maintained and serviced on a Visual inspection
regular basis. Signage

To confirm relevant personnel have received


training in the correct use and application of such
equipment
Evacuation, Drill To confirm that effective procedures are in place to Evacuation procedures
and Instruction ensure that all personnel on site (including anyone Fire drill records
with specific needs) can evacuate to a safe place in Training records
the event of an emergency. Risk assessment(s)/personal
To ensure that suitably trained personnel are on site evacuation plans.
to effectively implement the aforementioned
procedures (including use of any related evacuation
equipment).
To ensure the evacuation procedures are tested on
a regular basis.
Emergency Escape To ensure that adequate means of escape are Fire Risk assessment(s)
Routes, Exits and provided and maintained for the safe evacuation of Emergency lighting test and
Lighting people from the site and all locations within the servicing records.
site. Signage (including assembly point)
To confirm appropriate escape route/exit signage Visual inspection.
and
lighting is in place.
To confirm such emergency lighting is tested and
maintained on a regular basis.

Thank you

9, Saket Complex, Thane (W), 400601 | contact@eshandevelopers.com | www.eshandevelpors.com | 9920751369