FUTURE LIFT INSPECTION TEST PLAN

PAINTING WORK
PROJECT TITLE
Refurbishment and Modernization of Ithra Elevator
ITEM NO. PROJECT PHASE & TASK / ACTIVITY QUALITY QUALITY
ACTIVITY CODE PROCEDURE RECORD

1.0 RECEIVING INSPECTION


Paint Products Receiving & Storage
1.1 Inspection Project Specification FL-CIV-IC-002
2.0 INSTALLATION
2.1 Painting Surface Preparation Project Specification FL-CIV-IC-003
2.2 Final painting inspection Project Specification FL-CIV-IC-004

GENERAL NOTES
1 Surveillance: QA /QA Organization to monitor work in progress without notice from Construction Organization
2 Witness: QA/QC organization shalt be notified of the Timing of Inspection or test in advance. However, the inspection or test shall be performed as
is not present.
3 Hold: QA/QC organization shall be notified of the Timing of Inspection or test in advance. Inspection or test shall not be carried out without the QA/
LEGEND
H Hold Point for QC Inspection/ Test R
W Witness Inspection RH
S Surveillance I
DAT E APPROVED
DISCIPLINE
ITP-CIV-002 CIVIL
WBS/BI/JO/NO CONTRACTOR / SUBCONTRACTOR
4300009686
INSPECTION Future Lifts/Al-Yamama
RESPONSIBILITY ASSIGNMENTS
QUALITY ITHRA
RECORD REMARKS
CNTRCTR

FL-CIV-IC-002 H W

FL-CIV-IC-003 H H
FL-CIV-IC-004 H H

NOTES

pection or test shall be performed as scheduled if the QA/QC organization representative


l not be carried out without the QA/ QC organization representative in attendence
D
Review of Documents
Review and Approval of Documents
100% Contractor Inspection