You are on page 1of 4

PIPEWORKS 1 AP/MAC 2021/BQS663

QUESTION 1

Drawings No: PPUB/BQS663/MAC 2021/1-3 in Appendix 1 show the layout plan and
details of a proposed Headland and associated works. Using Schedule Papers and
Billing Papers, take off and prepare draft Bills of Quantities of work items for the pipe works.

(60 marks)

© Hak Cipta Universiti Teknologi MARA PIPEWORKS


.......... ••■m1ra1 . .

WATER MAINS LA YING REQUIREMENTS


NOTES:
1. ALL PIPES SPECIALS AND FITTINGS SHALL BE SUBJECTED TO THE APPROVAL OF PBAPP. 1. ALL HOPE PIPES TO BE CLASS PN 12.5.

2. WATER MAINS OF NOMINAL DIAMETER 100 mm AND ABOVE SHALL HAVE MINIMUM COVER 1.0 METER. 2. ALL THE HDPE JOINTS TO BE DONE BY AUTOMATIC BUTT FUSSION MACHINE.

3. FOR PIPES LESS THAN 100mm DIAMETER, LAID ACROSS FEDERAL OF STATE ROADS, SHALL BE LAID THROUGH 3. ALL PROPOSED WATER MAINS AND FIRE HYDRANTS TO BE SUPPLIED AND LAIN BY LICENSED
A G.I PIPE CLASS B FOR EQUIVALENT. PLIMBER.

4. FOR PIPE LESS THAN 75mm , THE MINIMUM COVER TO THE PIPE SHALL BE 450mm . THE STOPCOCK SHALL 4. ALL HYDRANT KEYS TO BE LESS THAN 450mm BELOW FINISHED ROAD OR SIDE TABLE LEVEL.
BE INSTALLED ON THE SAME SIDE OF PBAPP MAINS AND SHALL NOT EXCEED A DEPTH OF 450mm.
5. ALL HYDRANT TO BE PAINTED YELLOW AND HEAD TO BE LUMINOUS YELLOW.
5. LAYING OF PIPES AND SPECIALS AND INSTALLATION OF FITTING SHOULD BE DONE ACCORDING TO THE
REGULATIONS AND SPECIFICATIONS OF PBAPP. 6. SLUICE VALVE & STOPCOCK AT T-JUNCTION TO BE PROVIDED AS SHOWN.

6. ALL SLUICE VALVES MUST BE INSTALLED IN VALVE CHAMBER CONSTRUCT ACCORDING TO STANDARDS AND 7. CONTRACTOR TO SUBMIT SHOP DRAWINGS FOR APPROVAL BY S.O. BEFORE COMMENCEMENT OF
REQUIRMENT OF PBAPP. WORK. THIS SHALL INCLUDE POSITONS & SIZES OF SLEEVES THROUGH BEAMS, SLAB, WALLS &
OTHER STRUCTURAL MEMBERS TO BE ALLOWED BEFORE CONCRETING.
7. DIRECTION OF OPENING FOR SLUICE VALVES AND BUTTERFLY VALVES SHALL BE AS FOLLOWS : -
i) CLOCKWISE OPENING FOR PENANG ISLAND. 8. ON COMPLETION OF WORKS AND BEFORE HANDLING OVER, THE CONTRACTOR IS TO SUBMIT TWO
ii) ANTI-CLOCKWISE OPENING FOR SEBERANG PRAI. COMPLETE SETS OF 'AS-BUILT' DRAWINGS ( 1 SET PAPER PRINT AND ACAD FILES ON DISKS).
THE DRAWINGS MUST INDICATE COMPLETE & EXACT SURVEYED DATUM, POSITIONS, ALIGNMENT,
8. THRUST BLOCKS FOR PIPE SHALL BE PROVIDED AT ALL BENDS AND TEES. SIZES, AND LEVELS OF ALL WORKS INCLUDING EXPOSED AND CONCEALED PIPES INSIDE BUILDING
AND EXTERNALS BURIED PIPES.
9. ALL PIPES RUNNING ALONG THE DRAIN SHALL BE LAID 1.25m AWAY FROM EDGE OF DRAIN.
9. THE WHOLE WATER SUPPLY SYSTEM SHALL BE THORUGHLY TESTED (PRESSURE AND LEAKAGE
10. ALL PBAPP PIPES SHALL BE LAID 1.25m AWAY FROM ANY OTHER UTILITIES EXCEPT SEWAGE PIPES TO BE TESTS) BY THE CONTRACTOR AT HIS OWN EXPENSE AND TO THE REQUIREMENT AND APPROVAL
LAID OPPOSITE SIDE OF THE ROAD. OF THE PBA AND THE S.O. BEFORE COVERING UP.
11. FOR FIRE HYDRANT WHICH IS INSTALLED AFTER METER SHALL BE OF THE TYPE APPROVED BY JABATAN
BOMBA DAN PENYELAMAT.
12. FOR PUBLIC HYDRANT - REFERENCE SHALL BE MADE TO APPENDIX 5.
13. IF MORE THAN 1 NUMBER OF FIRE HYDRANT IS REQUIRED FOR THE PIPE NETWORK, THE MINIMUM SIZE OF
MAINS SHALL BE 150mm.
14. THE FOLLOWING HAVE TO BE CARRIED OUT BEFORE THE MAINS ARE HANDED OVER TO PBAPP :­
□. PRESSURE TEST
15. THE OUTSIDE DIAMTERS FOR DIFFERENT PIPES MATERIAL AND SIZES SHALL COMPLY WITH PBAPP .
16. ALL PROPOSED STREAM-CROSSING PIPES ABOVE GROUND SHOULD BE OF DUCILE IRON OR STEEL PIPE OF
MINIMUM NOMINAL DIAMETER OF 150mm COMPLETE WITH AIR VALVE. FOR STEEL PIPES , THE EXTERNAL
SURFACE SHALL NOT BE COATED WITH BITUMEN AND SHALL BE COATED 21TH 2 COATS OF NON-RUST
ALUMINIUM.
17. SCOUR PIPES SHALL BE LOCATED AT THE END OF PIPELINE OR AT LOWER GROUND OF THE DEVELOPMENT.
a) WHERE SECTION OF PIPELINE PEAKS ABOVE THE HYDRAULIC GRADIENT.
b). HIGH POINTS IN THE PIPELINE WHERE ABRUPT CHANGES IN SLOPE DIRECTION EXIST.
i) RUNS PARALLEL TO THE HYDRAULIC GRADIENT.
ii) HAS A LONG HORIZONTAL RUNS WITHOUT SUMMIT, WITH AIR VALVES RECOMMENDED AT 450 METRES
INTERVALS.
iii). HAS A LONG ASCENDING OR DESCENDING STRETCH WITHOUT SUMMIT, WITH AIR VALVES AT 300
METRES INTERVALS.
18. ALL BOLTS AND NUTS SHALL BE AS FOLLOWS : - i) ABOVE GROUND - HOT-DIPPED GALVANIZED ii) BELOW
GROUND-STAINLESS STEEL.

PROJECT: DRAWING TITLE aamr: DRAWN BY MAA


CHECKED BY NAB/ NASA /RM/SMS/AS'fRAff
NOIE8 MEA8UREMENTCF SCALE N.T.S
PROJEK MEMBAIKPULIH MUARA SG.PRAI, CM. BIii UNG.
DATE MAC 2021
PULAIPINANG

................. ,,....... ....


.._CXIE:
BQBIIIII DRAWING NO. : PPU/BQS683/MAC 2021/1
GD&ZLDll'I& -•■--tCI) . . �� .

NOTES
1. ALL DIMENSIONS IN MILIMETRES UNLESS OTHERWISE STATED.
2. ABBREVIALIONS
M.S = MILD STEEL
D.I = DUCTILE IRON

FROM TO TYPE DIA. LENGTH


NODE NO NODE NO OF PIPE OF PIPE (m)
2 HDPE 110 196
JETTY
2 HEAD HDPE 110 250

1A 18 D.I 110 12

18 1C HDPE 110 50
11 f--y:- FFF

H 'f I 11 Jf

l
II

150 m
'I

PROJECT: DRAWING TITLE : IIIIBI': DRAWN BY MAA


CHECKED BY NAB/ NASA / RAR / SMS/ ASYRAFF
LAYOUT PLAN
WATER RETICULATION SCALE N.T.S
PROJEK MEMBAIK PULIH MUARA SG. PRAI,
DATE MAC2021
PULAI PINANG
CXIIIIIIGCIII:
BQIIIIII DRAWING NO. : PPU/BQS663/MAC 2021/2

Cllall_.. ........ ,,•..•••· W


--□•nw. •P■IIIIX t ca) . ' . .__.__.__.__:__� .

_E L D

c.D
LO

i
0
LO
N

LO
N

ll

CROSS SECTION OF SLUICE VALVE BOX CROSS SECTION OF SLUICE VALVE BOX
USED UNDER ROAD CARRIAGE WAY USED UNDER ROAD SIDE

lTf-
1\/11
I
L_

+
..
C__j

r-
V
y
..
L_
_L
I
_J
_J

..
l.J....
:::s:::
u
<C
CD
_J�------,--=+----
<C
1-
:z:

-1 ...
--
:-,I :: �)
CROSS SECTION OF PIPE TRENCH
( FOR NON-VEHICULAR CROSSING)
CROSS SECTION OF PIPE TRENCH
( FOR CROSSINGS UNDER ROAD)
PROJECT: DRAWING TITLE : -= DRAWN BY MAA
CHECKED BY NAB/ NASA /RM/SMS/ISYRAFF
-.UICE VALVES a PFE IEAIUREIIBff OF SCALE N.T.S
PROJEK MEMBAIK PULIH MUARA SG. PRAI, TRENQt DEl'M.8 CM.BIBI CNS
PULAI PINANG W0RIC8 DATE MAC 2021

................. ,,....... .....


CCUIICCIII:
BQ8001 DRAWING NO, : PPU/BQS683/MAC 2021/3

oa•a□anw.