Work Instruction Title: Diesel Generator Change Over from HFO to LSMGO
Work Instruction:
Vessel: CASTOR VOYAGER Department: ENGINE
Equipment: DIESEL GENERATOR System: Maneuverability
Specific: Class Vessel
Revision Date: 16 March 2019 Next Revalidation Due: 16 March 2022

Revision History [Enter dates of all revisions. Enter Nonconformity or LCA number if known]
NC or LCA
Rev # Issue Date Summary of Changes
#
     
                       
                       
                       

* Vessel Specific Work Instructions generated onboard are approved by VMT only. Class Specific SOPs are approved by the
Assistant Fleet Manager.

1.0 PROCEDURES

1.1 Overview This work instruction is needed so that the correct steps can be taken to retrieve VDR data.

1.2 Details [The section below lists the steps that must be completed to ensure compliance with this Work Instruction.
List the job steps in the correct sequence, giving just enough detail to perform the job correctly. If a JHA is not linked
to this Work Instruction ensure that safety precautions are contained with each step in this section].

Job Steps
Step/Action Hazard
&
Controls
(If any)
1. Ensure valves on MDO Pump #1 (V701 and V703) and MDO Pump #2 (V702 and V704) are
open

Page 1 of 4 Work Instruction Template (24 Aug 2018)


Required by VOP-02-09
2. Ensure valve to incinerator, V705 is closed

3. Close valves 105F and 104F on DO line

4. Open DO inlet valves 106F, 108F, 110F for D/G#1, D/G#2 or D/G#3, depending which DG
need to be run on DO and close HFO inlet valves 111F, 112F, 113F for D/G31, D/G#2 or
D/G#3.

Page 2 of 4 Work Instruction Template (24 Aug 2018)


Required by VOP-02-09
Start MDO pump on manual and check if it builds up the pressure on pressure gauge in the
purifier room.

5. Take respective generator on LOCAL control and START. Generator is running on idle mode.

6. Check for leakages in the box. Check all other parameters and if everything is OK put back
the generator control to REMOTE. Now, running generator is on ECR control.

7. In ECR put the generator on load by pressing START button on the starting panel or SEMI
AUTO SYNCHRO START button on the DG synchro panel. Generator will synchronize
automatically.

8. After reasonable amount of time, change the FO return to DO service tank. Open DO return
Page 3 of 4 Work Instruction Template (24 Aug 2018)
Required by VOP-02-09
valves OD107F, OD109F, OD110F for the D/G#1, D/G#2 and D/G#3 respectively and close
HFO return valves 116F, 115F, 114F for D/G# 1, D/G#2 and D/G#3 respectively.

1.3 Inherent Hazards [Trivial, Tolerable, Moderate, etc.]


NA- Administrative task.

1.4 Resources (Required Equipment, Documents, etc.)


[Include PPE Requirements if there is no JHA for this job].

2.0 ROLES, RESPONSIBILITIES, AND COMPETENCIES

2.1 Key Personnel Requirements [Define key roles, responsibilities, and competency requirement. At a minimum,
key roles should include Supervisor level, and manpower requirements. One person must have the role to advise the
facility contact or VMT if anything in this SOP is incorrect.]

Role Responsibilities Competencies


[Supervisor, Team Leader, Worker, Winch operator [e.g. “Ensures all steps are followed”, “Report to Bridge [minimum rank required
etc.] on completion of work” etc.] e.g. Chief Officer]

Page 4 of 4 Work Instruction Template (24 Aug 2018)