Professional Documents
Culture Documents
1. Specific requirement
1.1.To perform FA Silo Fluidizing Blower overhaul
1.4.To call Owner for component inspection after disassembly completed and before
re-assembly started.
1.6.Vibration reading will be taken during test run after the overhaul work. The test
run will be witnessed by Owner.
1.6.1. The vibration reading of the blower should be below 2.5 mm/s rms (ISO
10816-3).
1.7.To submit comprehensive report to Owner latest by 1 week after job completed.
1.9.If in case there is defected parts found during servicing, Vendor shall rectify and
provide replacement parts. The rectification and replacement should be clearly
itemized in the invoice.
Work Specification –FA Silo Fluidizing Blower Overhaul
2. General Requirement
2.1 The Company shall have sufficient experience in carrying out
Maintenance works in Coal Fired Power Plant. As such the management
of the company should be aware of the general requirement in terms of
Safety Practices, Work Procedures, liaised-on with Station Personnel etc.
2.4 The contractor to provide Name & Contact Number of the Person in
Charge for the job.
2.5 The PERSON IN CHARGE (later will be known as PIC) shall be the person
whose doing DIRECT SUPERVISION of the work AND will be the site
liaised-on person with Owner. The PIC shall be present ALL the time at the
WORKPLACE during his/her team performing the task.
2.6 All contractors working in TBPP shall have NIOSH Tenaga Safety Passport
(NTSP). Contractors will be prohibited from entering the plant if failed to
produce the passport at the entry point.
2.7 NO work shall be start, resume and proceed WITHOUT the appointed PIC
present at the workplace.
2.8 Upon completion of the job, the Contractor to read & sign on the Contractor
Performance Evaluation Form which is filled by the Owner, and later, the
signed form to be attached with the job invoice submission.
Work Specification –FA Silo Fluidizing Blower Overhaul
3. Attachment required
3.1.With reference to Item 1.2; the contractor is to attach the cost breakdown to
reasonable detail (for reference in the evaluation process) as follows:
3.2.To attach Method Statement (or Work Procedure) and Inspection & Test
Procedure (ITP) checklist to describe in sufficient detail about how the work is to
be carried out and the inspection point(s) that is recommended by the contractor.
This shall base on the Vendor’s experience.
3.4.To attach related safety documents such as Hirac/ Job Safety Analysis.
4. Technical Specification
296
i
I I 4 I·~ ~ I 7
,..
II'
CD
~ "'&
<:) ~I
- - II;
'll
c
r0-
N
,..,..,
111
- r-.
-t
-t
U"t
c:
C
.... ~~
If.
462 A
1150
c
~
\J"I
~ M
.0
r0-
0
CD
I
~
~
o 0
0
.0
-t
0
CD
o
'"
~
IE
FLANGE DETAIL-A &
- ANSI 16.5 CLASS 150 lbs
PLANT NAME : T ANUNG BIN POWER SON. BHO. A
I'l"l
0
CD
T ANUNG BIN
JOHOR, MALAYSIA
LU
~
ute CONTRACTOR .: 55735-01 r~
EOUIPMENT DESCRIPTlON:FLY ASH SILO FLUIDIZING HI FR
AIR BLOWER
E REF. PII DIAGRAM : U"t
0-
OWNER OWG.NO.:TgBin-IHI-B4-ET -11014 SHEE T16
REF. P&I DIAGRAM :M-55735-018
9S 817~ 878~
REF. PSI DIAGRAM :M-018-1
nooLh
ISM( 150-, FOUNDA nON PLAN
,
- DESIGN PARAMETERS OF BLOWER
2
.3 STATIC LOAD =3110 fCc. APPROX, ..g..~~ Lh
DYNAMIC LOAD =1.5 x STATIC LOAD SYI/.
INCORPORArEQ COMMENTS AS MARKED.
DESCRiPtiON OF REVISION
Rajertder
S~;N. CHD. APPD.
11.03.04 -
DATE
CAPACITY:- --- - - -- 3068 Nm3/hr. I
DIFf. PRESS.:------
R.P.M. :________
862 mbarlgl
1158
& 1 GO SQ. VALUE = 11,24 ka. m2 ~ EA Y INTBRNATIOI"AL LIMITED
~
I
o
." 6.I<.W.:--------- 112.36£
&. DIRHTION OF RDTATlON.UOCKWlSSfI<FFROtt DRIVE END 2bth MILE. BADMAUK. DISrr.-SONEPAT (HARYANA)
f BEARING
F 80 SQ.
~I QUANTITy:-------- 3 NOS. e COMMON BASE FRAME M.S. FABRICATEDluou DRN.
CHD.
I AAJENDER
"'-2.1 -- 111.02.04
1"1tti.
G.A. & F J nRAWINfi
F
MOTOR DATA
'" .. MAKE :----------- C(j.L. .&
FOUNDATION DETA[L~ -
l50SQ. FRAME SIZE :----- NO 315M.&,
b LOBES & m·,,~,rl~:?t _fL. OWNER ORG.NO.:Tg8 n-IHI-e~-ET-12139 SHUTl
FOR ACOUSTIC HOOD FOUNDA nON DEI AIL R.P.M :---------- 1488
o CASING
'&'7.'
&I~It~lf8;li~l~ A1lA -(@) E3
1<. W. :- - --- - -- -- -- 132 I(W & ------- , SHEET12(1/2) "
NET WEIGHT :--- 950 Kg.A S.NO DESCRIPTION MATERIAL A1~t=:~or:,D~: ~~ ~:';;::IS DRG. NO. K..GA+ 1016WHO 15A3 Rrv·111
1 '/ ~ I 4 I I:;, I h i 7 I s:t
4.4.2.5.11. 29
r::===========:::::::======::::::;::::=====:::;~====;::::::=====:::;:::====::::::;:::=:====;====~;:::=:=====;::======::::;;;:::======;======~====::::;:::::====::;=::=== 297
1 2 3 4 5 6 7 8
D ~566
575
~I
S.ND. QTY. DESCRIPTION MATERIAL REMARKS
01
02
01
01 020
I.li-26llCEQV TOAST" Al26
I.li-26llCEQV TDASTM A1C6 ~
03 01 030 lI.6-26O([1IV TOASTM Al KKS NO: OOETH2l AN001) OOETH22 ANOOl 8< OOETH23 ANOOl
04 01s.t 040 EN-24/ASTM 4340
05 02 060 I.G-26llCEQV TDASTM Al26
06 02 070 lI.G-26llCEQV TDASTM A126
07 . 02 080 I.G-26O([1IV
I.G-26lK£QV
TDASTM
TDASTM
Al26
Al26
ORDER SHEET NO. :-KI -15663
08 01 090
E 09 01 100 I.G-26lK£QV TDASTM Al26 NCORPORATED COMMENTS AS MARKED. 21.3.05 f
10 01 110 I.G-26O([QV TDASTM Al26
11 02 120 EN-353 ASTM 4317 815 M17 NCORPORATED COMMENTS AS MARKED, 23,7.04
12 02 130 BIJ4 STEn.([QV TO $A36) PlANT NAME: TANJlJNG BIN POWER SON. BHO.
13 04+16 150 .li-26llCElIV TDASTM Al26 TANJUNG BIN
JOHQR. IMI.AY'SIA
SYM. DESCRIPTION OF REVISION SIGN. eHD. APPD. DATE
14 02 160 ARBIJ4 STm.([lIV m $A36)
~ KAX M~~T~~L4KTID9s~T~~oNtlA¥lJA~RNA)
UCC CONTRACT ,: 55735-01
15 02 STD STD SKF EQUIPUENT DESCRlPTlON: SILO FlUIDIZING AIR
16 01 STD, BIJ4 STm.([QV m $A36) BLOWER
17 03 STD. STD. REr. Potl DIAGRW:
18 05 STD NEOPRENE OWNER owe. NO.: .TgBin-IHl-B4-ET-11014 SH£ET 16
19 02 STD. UCC owe. NO.: toH55735-018
20 STD.
REr. P.tI fTDf NO.: "-018-1 DRN. RAJENDE 1.7.01 CROSS SECTIONAL DRA\JING
CHD.
I
21 STD A
FOR MODEL 1016 'WC f£
---I.
22 STD APPD,
23 STD
F 24
25
STD.
STD.
STn
STm.([lIV TO $A36)
SCALE
~
N,T,S,
,
T.L. COMPRESSOR
~----------- ~SHE_ET~
26 STD. STD. SKF
STD, Di STm.([1N m $A36)
II diMensions o.re In unles
C:::=J,.
~
DRKG_,NCOS' -OOlO\JH003A3
W 2
STD. BIJ4 STEEl([QV TO $A36) MM.
otherwise shown on dro.wlng. REV.
1 2 3 4 5 6 7 8