You are on page 1of 5
== ZAMIL PROCESS EQUIPMENT COMPANY LTD Page 1 of 2 m= FINAL DIMENSIONAL INSPECTION REPORT PROUEST WANE [ NORTH GAS HARADH PARAGE #a cuenr | JOHINA PETROLEUM PIPE LINE ENGINEERING REPORT Wo. ZPEC-O40R-04-01 [CO,SAUDY ARABIAN OIL COMPANY) EQUIPMENT TITLE |: SCRAPER LAUNCHER DATE: ‘18-May-20 "| JOB Re psreozae Trem DESCRIPTION ft. L-o0a Jpco.0402-04.001REV.04, PEO-0402- 01 TO 04-002 REV.G2 pment |PED-0402 -01TO 06 -005 REV-00 Descrntion Reauiredfmm) [Acai my [ Result Remarks TENGTHIN FLANGE FACE TOCS-4 5805 seor , eee ‘59672075 159772075 y 1 ‘SHELL DIMENSION a 465 465 467 — Ora(INSIDE) 6084 607 4,609.4 ~ amm | ovary arm v Fler tached THICKNESS 2rrasmm | teaches, ‘SADOLESURPORTAT a 125mm 125mm y Provection apo. | st4mm vam y BASE PLATE DIMENSION | —sax205x25 | 660x205%25, 2 | SADDLE suPPORT DIMENSION ——_}- SADDLE TO SADDLE? | 425mm 421mm y PROJECTION SADOLE-2 585mm 84mm y JBASE PLATE DIMENSION] —650X205K25 s0x205x25 y a Description ojectionn) Elovation (rm) ‘Orientation (degree) Remarks No NOZZLE Read [Actual | wear | Read | Actual fone] Read [Actual on OLELE NAF D6 1 oor wn.ets STO FLANGE wa | wa wa | NA NA NA litt Jack scREW SAASTMTETLACLS (OZ2LE -N2- 2610808 4,000 lauick OPENING. 2 NA vi Kea asoa res wa Ma, | sta, ail NA IcLosure fp TiaeROw |712 FROM Inozzte- ns. 102032, oo, o 80" 3 fwwars.sa-astaroriacis | 75 | 789 | ¥ ) 490 | 4978 | Y | rowaros |rowaRos WIGUIDE BAR neo" | 180" Iwozztc. naa. 4" 10108 4 poor Lr, SA-astoror | 496 | 495 | y¥ | os | ons ror | 180 | fvunck screw Woz7ie- naa. + 1DI0T 5 [boortwn-rrs sk-asTie sz | srt 500 | 6500 tar | ter |v iywuack screw fracis Inozzte. Ns «" 101016 | 6 fooos uw ers SAasTiA eo | so | vy | sso | ss Jv} o o |v |nnack screw ponacis ‘ZPEC QC Engineer Inepoctor ‘A i Appleable) ‘ARANICO ISHRA orate: [ignatve ‘Sanat Dow: loa (=o 400-0402-04. Shell Pipe inside 8 ou Side Weld Vieual Checked found Satisfactory == ZAMIL PROCESS EQUIPMENT COMPANY LTD Page 2 of 2 sae FINAL DIMENSIONAL INSPECTION REPORT PROIEGT WANE TRORTH‘GAS HARADH PAKAGE 2x ecm | JOHINA PETROLEUM PIPE LINE ENGINEERING CO,SAUDI| REPORT No. ape acna.04 : arasian ot COMPANY) EQUIPMENT TLE | scrapen LAUNCHER ore: ‘ay 20 JOB Wo, fs Peomzon Trem DescrPTion eter Jeo-02.0¢001 neve, pe0-422.0 70 04-002 Reve? ean |PED-0402 -01 TO 04.005 REV-00 fc Descrnton Projection) Elevation Gy Crentaton ogee) | Romana aa ee INozae ne Foe y hoowivnnasacas | ace | ae |v | os | os fvl o | o |v forcaccs ozeLe. ne roaonoe : » Bockervew ose so | sz |v] atoo | ater |v | so | reor |v carescrose Sa asta aoe Fos 10 ae puare weacxer 1s | 2 |v | exo | waco |v | aro | aro |v feoxtesxre mi 11 furtwe.ucer we | we |v | 230 vf Jo |v | saoeric2tam 12 firtno Luce 12s | 128 eco vf Jo |v | soeocatmm / 5 aoe ‘TSXTSXBTHK, O15 13 [orounows tus rs | 7 |v | tooes | soos | v | 270 v | gare one 14 | GROUNDING LUG 2 75 75 v 1006s | 100/65 | Vv 90" v TEXTSRSTHROI8 HOLE TO HOLE 45 ZPEC 6 Engineer/inapector | _AV (Appleabe) TARANCO poustiea grt signature snare bow 12105120 _foote bate ZAMIL PROCESS EQUIPMENT COMPANY LTD PROJECT NAME CLIENT EQUIPMENT TITLE JOB No. ITEM DESCRIPTION DRAWING No. : NORTH GAS HARADH PAKAGE #A |CHINA PETROLEUM PIPE LINE BEPORTNO::) PECION2-0E THK : JENGINEERING CO.(SAUDI ARABIAN lo COMPANY) : SCRAPER LAUNCHER : [2S-PE-0402-04 :|H91-L- 0041 |PED-0402-04-001 REV-04, PED-0402- 01 TO 04 - 002 REV-02 * |PED-0402 - 01 TO 04 -005 REV-0D PART / COMPONENT (SHELL BARREL-1 P1071 (SHELL BARREL-2 #103 [REDUCER Pet02 Nozzae-NECK NS Nozzze-NECK N&A |Nozze-NECK NAB ‘Nozzle NECK NS Nozzzle NECK NB NNozzale-NECK N8 ULTRASONIC THICKNESS GAUGING CALIBRATION DUE DATE: 20 May2020 Serial No- GOPLS18060038 MODEL - DMS Go+ ACTUAL THICKNESS. REMARKS ~ REQUIRED — THICKNESS 24 22.02 | 22.07 MINIMUM MAXIMUM 26 26.86 27.95 26 26.25 302 49.16 49.47 29.29 29.46 29.45 29.58 29.03 29.17 27.42 2075 12.59 12.74 All Dimension are in mm ZPEC QC Engineer MISHRA ISignature: eit date: igis/2© JAI (If Required) Cl (If Required) |ARAMCO [Signature Signature: IDate Date: cm F ZPECIOCIOSa Rev. 0 i; Page 1 of 4 = ZAMIL PROCESS EQUIPMENT COMPANY LTD INTERNAL GAUGE PASSING REPORT PROJECT NAME : NORTH GAS HARADH PAKAGE #A CHINA PETROLEUM PIPE LINE REPORT No. :| ZPEC-0402-01/01 CLIENT ENGINEERING CO.(SAUDI ARABIAN lolL COMPANY) EQUIPMENT TITLE :| SCRAPER LAUNCHER DATE: 18-May-20 JOB No, :|2s-PE-0402-04 ITEM DESCRIPTION :|H91-t-o044 PED-0402-04-001 REV-04, PED-0402- 01 TO 04 - 002 REV-02 DRAWING No. *}PED-0402 - 01T0 04 -005 REV-00 1D of Minor Shel! pipe = 466mm CS#1 through CS#3 Internal gauging passing (443 OD Gauge ) found satisfactory [2 QC Engin ‘ARAMGO ISHRA #7 Leal signature: AG | signature: Signature: Date: e-er-rea Date Date Form # ZPEC/QC/13 Rev. 0 ZAMIL PROCESS EQUIPMENT COMPANY LTD LEAK TEST REPORT REINFORCEMENT PADS PROJECT _: NORTH GAS HARADH PAKAGE #A ReportNo : ZPECMO402-0401 CLIENT —_: CHINA PETROLEUM PIPE LINE ENGINEERING ‘CO.SAUDI ARABIAN OIL COMPANY) pats 18/08/20 EQUIPMENT : SCRAPER LAUNCHER Page nilor4 JOBNo. —: ZS-PE-0402-04 Kem Description: ;H91-4.-0041 Test Pressure : 70 KPa ( 10PSI) Drawing No. _: PED-0402-04-001 REV-04, PED-0402-01 TO 04 - 002 REV-02 TestDate: 18/05/20 Test Medium AIR Test Gauge Details : Sr. No. PG 23-51 Range 20-23 PSI Calibration Date: 24 NOV. 2019 TO "23 NOV. 2020 Calibration Cortificate No. MTE-CC-A10022943-2 ] st. REINFORCEMENT PAD IDENTITY TEST RESULT 1 | SADDLE SUPPORT#1 RF PAD NO LEAK FOUND 2. | SADDLE SUPPORT#H2 RF PAD NO LEAK FOUND 3. | LIFTING LUG PAD (2Nos) NO LEAK FOUND ‘QC Engineer / Inspector CLIENT END USER MISHRA 1g laS12> 8 Signature & Date | Signatire Date ‘Signature & Date

You might also like