You are on page 1of 5
Fame PPC Rao ZAMIIL PROCESS EQUIPMENT COMPANY LTD. Page 1 of 2 FINAL DIMENSIONAL INSPECTION REPORT PROJECT NAME [NORTH GAS HARADH PAKAGE #A cuENT "| HWA PETROLEUM PiPE LINE ENGINEERING Co. REPORT No. baal (SAUDI ARABIAN OIL COMPANY) EQUIPMENT TITLE .| SCRAPER RECIVER ate: 28-May-20 TORN. | j2sPE0«02.05 ITEM DESCRIPTION iH91-L-0038 [PED-0402-05-001 REV.-08, PED-O402- 05 TO 09 - 002 REV.-02 DRAWING No, }Pe-0402 - sto 09 - 008 REV.-00 Description Required(onm) [Actual (mm) Result Remarks LENGTH(NT FLANGE FACE - Tos.) es oor Outside side croumference | 1596/2075. 15902075 y 1 | SHELL OMENSION aire 47684784 Dia(WSID=) outa 825 98228, a [- 6mm ovauty on y an | Refer attaches THICKNESS tsaemm — | efeatiached y ‘SADDLE SUPPORTH#T ‘i Ero $825 525mm y PROJECTION SADOLE-1 812mm BASE PLATE OMENSION | 650x205x25 550x205%25 y 2 | SADDLE supPoRT DIMENSION ‘SADDLE-1 TO SADOLE-2 a2tsem a2tsmm y PROJECTION SADDLE2 85mm 8¢mm y BASEPLATE DIMENSION | 650%205x25 s0x205%25, y 3 Description Projecting) Elevation fm) Orientation degree) Remens No Nozze Reqd | Achat | eqs | Acwnt frosul eas fact rena Wozzie- nt. ann avr. 00 | 1 eos war sto FLANGE wa | NA wa | wa NA NA \with sack screw fseasrurariac.s » Nozze -nz-26:1082¢4.006 ees eae Na | wa wa | wa NA NA lauick OPENING IcLosure zrROW | 712 FROM 1 Nozzue-no- 2102002 coo, 1 1 “ ‘oo | y lbwwae,sa-astwrariacis | 788 | 788 4960 | 4980 | V | rowazos | rowaRos }WOUIDE BAR 7 180° ‘00 INOZZLE- Naa. 4101016, 4 fececovuma-ne, sa-asty | 495 | aoe | y | os | ots 100" roo} v_ fwuack screw forse Inoz2ie- ne" 101086 8 fovscortwn-arsa-asm | s72 | 572 500 | 6500 180" 100" |wusack scREW Inoze.e- ns 411016 ~ 6 fececorwnar sans | 610 | 608 | v | 500 | soot | v o 1 |wwunck screw ZPEC QC Engineer Inspector ‘A (If Appicable) ‘ARAMCO lacen sci Bens fone: bee 28/ncj9p haw [sonaue ee [Fame DECTOCS ero ae ZAMIL PROCESS EQUIPMENT COMPANY LTD Page 2 of 2 FINAL DIMENSIONAL INSPECTION REPORT PROUECT NAME [NORTH GAS HARADH PAKAGE FA cUIENT _| CHINA PETROLEUM PIPE LINE ENGINEERING CO, | REPORTNo, : | ZPEC-0402.05-01 ‘(SAUDI ARABIAN O1L COMPANY) EQUIPMENT THLE SCRAPER RECIVER DATE: 70May 20 JOB Ne, les PEowz08 ITEM DESCRIPTION — :|H91-L-0039_ - — Pe0-402408-001 REv-04, PED-a402-06 1009-02 REV.a2 PRAMS Ho. PED-0402 - 05TO 09 - 005 REV-00 lst | _ Description Projection(mm) Elevation nim) | _Oventation ogres) | Remarks NOZZLE Actual |Result| Reqd Actual |f* al] “Reqa Actual |Resuit IOzaLE- ODT 7 [eceooeurmarsa- | ave | ae | x | ois | os |v] o | o | v srw ronso.s iozate. ne coun . hwcarexctose o [Irsaabea08 so fos |v | aco | aieo |v | se v fia Se‘asru aaa reo ro fanersresracrer | 7 | 9 | v | oo | caso | v | aro | arm | 0 hooxreoxerix 11 furtnc Luce: ws | re |v | soe | seo fv | Jo |v ipranemacctin 12 rte tuore we | vz |v | om | cass fv] or Jo | a eayz0orec cto 13 [orounonc 16 1 » | oe toons | soos |v | aro | aro |v [rexroxerac 44 | GROUNDING LUG 2 75 75 v tooes | rooms | v 90" 9 vy PSXTSxBTHK. O18 |HOLE TO HOLE 45 -Job-0402-05- Shell Pipe inside & out Side Weld Visual Checked found Satisfactory PEC QC Engi feisua senate sane - ete aeloi0 at: "ARAMCO ‘AI (if Appicable) [signature loate Eien reer ZAMIL PROCESS EQUIPMENT COMPANY LTD Page 1 of 4] lz020 JOB No. ITEM DESCRIPTION ZPEC PROJECT NAME : |NORTH GAS HARADH PAKAGE #A CHINA PETROLEUM PIPE LINE REPORT No. : ZPEC-0402-05-THK/01 CLIENT : JENGINEERING CO.(SAUDI ARABIAN EQUIPMENT TITLE \DRAWING No. lEquipment: OLYMPUS EPOCH 600 ACTUAL THICKNESS | REMARKS Ist REQUIRED Ivo, PART / COMPONENT THIcKNeSS MINIMUM MAXIMUM ULTRASONIC THICKNESS GAUGING CALIBRATION DATE: 08 MAR CALIBRATION DUE OIL COMPANY) :|SCRAPER RECIVER :|ZS-PE-0402-05 :|H91-L-0039 PED-0402-05-001 REV- 04, PED-0402- 05 TO 09 - 002 REV-02 PED-0402 - 05 TO 09 -005 REV-00 DATE: 07 MAR 2021 Serial No- 120441011 1 ee rxlournwn [2PEC AC Engineeriinspector ‘SHELL BARREL-1 P#101 SHELL BARREL-2 P#103 REDUCER P#102 Nozzzle-NECK N3 Nozzzle-NECK N4A Nozzzle-NECK N4B Nozzzle-NECK N5 Nozzzle-NECK N6 Nozzzle-NECK N8 15.1 15.65 15.87 % )©6|t*«BB 188 18 | 18.59 225 349 i 362 35.51 252 26.25 26.39 22 | 26.42 26.53 a 25.2 | 26.24 26.28 | 166 1761 17.72 125 12.67 "| 12.69 All Dimension are in mm. A (Wf Required) Cl (Required. MISHRA Signature: AS 5pefy? Signature: Date [Form ZPECTOCTOSS RY T 5 Pea ZAMIL PROCESS EQUIPMENT COMPANY LTD Page 1 of =PEC INTERNAL GAUGE PASSING REPORT PROJECT NAME JORTH GAS HARADH PAKAGE #8 cueNT |CHINA PETROLEUM PIPE LINE ENGINEERING | REPORT No. SEE eweasns '1G0(SAUDI ARABIAN OIL COMPANY) EQUIPMENT TITLE :| SCRAPER REGIVER [DATE 26-May-20 JOBNo, :|28-PE-0402-05, ITEM DESCRIPTION H91.4.0039 _|PED-0402-05-001 REV.- 04, PED-0402- 05 TO 09 - 002 REV.-02 ue IPED-0402 -05TO 09 - 005 REV.-00 INTERNAL VISUAL &GAUGE PASS! 1D of Shell pipe = 477.8mm ING CS#1 through CS#3 internal gauging passing (453.91 OD Gauge ) found satisfactory kePec ac Engineer inspector MISHRA \gnature Tay foste Signature: Date ‘ARAMCO Form # ZPEC/QC/13 Rev. 0 ZAMIL PROCESS EQUIPMENT COMPANY LTD LEAK TEST REPORT REINFORCEMENT PADS PROJECT —_ : NORTH GAS HARADH PAKAGE #A, CLIENT “CO.(SAUDI ARABIAN OIL COMPANY EQUIPMENT : SCRAPER RECIVER JOBNo. — : ZS-PE-0402-05 HINA PETROLEUM PIPE LINE ENGINEERING Report No: ZPEC/0402-05/01 Date 28/08/20 Page :10F1 Item Description: H91-L-0039 Test Pressure : 70 KPa ( 10PSI) Drawing No. : PED-0402-05-001 REV-04, PED-0402-05- TO 09 - 002 REV-02 Test Date: 28/05/20 Test Medium =: AIR Test Gauge Details : Sr.No. : PG 23-61 Range :0-23PSI Calibration Date: ' 24 NOV. 2019 TO '23 NOV. 2020 Calibration Certificate No. MTE-CC-A10022943-2 SL. | REINFORCEMENT PAD IDENTITY TEST RESULT 1 | SADDLE SUPPORT#I RF PAD NO LEAK FOUND 2 | SADDLE SUPPORT#2 RF PAD NO LEAK FOUND 3. | LIFTING LUG PAD (2NOS) NO LEAK FOUND ZPEC QC Engineer / Inspector CLIENT MISHRA hes! 2p END USER Signature & Date ‘Signature & Date

You might also like