You are on page 1of 4
Uncontrolled, if printed Gllfar QUALITY CONTROL PROCEDURE ‘oe: Ne RDB-@- 400-004 Poe 1 ot TITLE: SETTING OUT SURVEY - ROAD WORKS AL: A z “eK 4 oT mmonin | OC Posen Ried fie | avraam Wb 7 faa 2a evecaany | OES Rev.| Date Description Prepared_| Approved | Authorized { Alfar QC PROCEDURE SETTING OUT SURVEY - ROAD WORKS 1.0 PURPOSE “Te purpose of this procedure isto describe and define the methods adopted in Satting Out Survey for Road Works. 20 SCOPE ‘Tris procedure apples for setting out of tines (center & right of way nes) to grades as per contract drawings for survey of road works undertaken by the Ganpany, 30 REFERENCE 34 MsP.001 Document & Date Control 32 MsPors Control of Monitoring & Measuring Equipment 40° DEFINITIONS 41 Company alfa Enginoering & Contracting SAOS. 42 HP Horizontal Intersection Poin 43 we Vertical Intersection Pool 44° Sioincharge Project Manager / Construction Manager 44° Setting Out ‘Tha engineering method of transferring the plan & elevation from drewings to the fet with afr contol of alignment. 45 Pemanent Bench Marks (BM) Relerence point of known height relative to @ spaced datum with northing and, sting values. 48 Gndes Etevations of any pont with reference to @ soecied datum, 47 Temporary Bench Marks (TBM) RRe’erence points established from permenent &M at convenient locaton for seting ou the pavement structure 48 Grdtines Imaginary ines runing horizontal & vertical with each ne having @ designated nothing r an eating value RevisionNe. | Dato Procedure No. Page 0 2n0s2012 ROD-QC-c00.401 dota Cllfar QC PROCEDURE 50 pROcED 5.1 Responsibility 5.11 Verifeaton of bench marks, estabishing temporary bench marks Fxing of road alignment and its ‘Surveyor 2 Approval forthe aignment and Original ground levels Site Incharge 5.2 Acceptance Values “The vaues 2s stated in ns proceaure are standardised for the Company. In case of variation against values prescrbed inthe contract document, then the values provided inthe contract documents shal preva 53 Preparation 53.1 The Supervisor (his nomines) shall verfy that the drawings provided by the Customer (his nominee) are. approved for cone revision lon and are of the fleet 5.3.2. Incases, where existing roads are to be widened / ehabiltates / improved upen, then no objection cerfiates forthe work shal be dtaine from local euthorbes (alice, Mistry, Municipality) prior to selting out at sit, 5.3.3. The values ofthe coordinates & elevations of permanent BM (minimum two BM slations) shall be obtained ftom the contract drawings or fom the Customer (his ominee) as permanent reference stations, The correctness of these valves shall be checked physically at site wibin a tolerance of + 2 mm in ine and #5 mm in level. Inthe process of checking, TBM shall be established et every 250 iis or al lasser intervals at location ‘where there is no disrabance due to consirudion activites. Such TEMS shal be preserved Ul the end ofthe project. 5.3.4 The BM values as verfled (as al clause 5.3.3) shall be compared with values in the conkact drawings. Dscrepancies, I any, shal be brought othe nobee of tre CCustomar (his nominee). Welton approval ofthe values of BM a8 checked shall be obtahed from the Customer (his nominee) prior to commencing the work, 5.4 Instruments for Setting Out 5.4.1. Instruments appropriate forthe inlanded setting aut task and according to the ‘accuracy requirements shall arranged, 5.42. The insiumens shall have valid calibration certificates and shall be In good working condition. The following instruments shall be required for seting out survey work + Autolovels + Theodotte with a eistomat, “ipods. Stat, Ri jevision No. | Date Procedure No. Page ° 20452012 RDD-9C-00001 soft Gllfar | QC PROCEDURE 55 56 564 584 87 874 572 573 60 84 62 63. 84 65 20 mis/50 mis Stee! Measuring Tape. 1 Mason Thread + 60cm ong Spirit Level Plumb Bob, Tools & Tackles for Seting Out ‘The Surveyor shall be responsible for sranging the tools, tackles and materials. required for Seling Out.” Th shall include bul are nol hmied to steel pegs, ‘wooden pegs, nail, marking powder, pray paint, masking tape, string fines and bobs. Setting Out \with reference to the known BM (as at cause 5.3.3 & 5.2.4) values, the center line ofthe proposed road shal be localed and marked / pegged at ste using an appropriae instrument All the HIPe & VIPs for horizontal & vertical curves along the alignment shall be located and pegged at site in a similar manner (9s at clause 5.61). The ‘heodotte traverse shall be closed at a BM (as al dause 5.3.3 & clause 5.3.4) ‘and error, f any, shall be linearly dstbuted ogging chal be dane at 20 mie intarvale on both eee ofthe embankment and In eases of no embankment. | meter away from the edge ofthe proposed road longitudinally. Indications of chainages and fished levels for each pavernent layer to be built up shall be marked on the pegs. ‘The alignment 28 pegged shall be checked with respect to the drawings. Upon conformity of the algrment contol, the Customer (his nominee) ‘shall be requested to check and approve the alignment Levels Along & Across the Alignment “The existing ground lavels shal be recorded on a level book inthe longitudinal & vransverse crecions at 10 mis intervals or at intervals sulable to arive at accurate documentation with reference tothe known BM elevations (as al clause 5.3.3 8 clause 6.34). In cages of conractualrequiemens, the same shall bo card out jinty withthe Customer (his nominee). ‘The existing ground levels 2s recorded (as at clause 5.7.1) shall be vered with reference to the conract Grawings and shall be forwarded to the Customer (his mines) for approval LUpon approval ofthe alignment (as at clause 5.6.4) and the existing ground levels by the Customer (his nominee), the road works shall commence for bulding up pavement ayers, DOCUMENTATION / RECORDS ‘Survey Report ( Road Works) RDD-GC-000.001-F101 ‘Alignment Approval Records. Bench Mark Approval Records. Existing Ground Levels Recorded ina Level Book. No Objection Certfcates, Revision No, | Date Procedure No. Page « 20052012 [RDD.9¢:400 001 sora

You might also like