1.0 PURPOSE
“Te purpose of this procedure isto describe and define the methods adopted in
Satting Out Survey for Road Works.
20 SCOPE
‘Tris procedure apples for setting out of tines (center & right of way nes) to
grades as per contract drawings for survey of road works undertaken by the
Ganpany,
30 REFERENCE
34 MsP.001 Document & Date Control
32 MsPors Control of Monitoring & Measuring Equipment
40° DEFINITIONS
41 Company alfa Enginoering & Contracting SAOS.
42 HP Horizontal Intersection Poin
43 we Vertical Intersection Pool
44° Sioincharge Project Manager / Construction Manager
44° Setting Out
‘Tha engineering method of transferring the plan & elevation from drewings to the
fet with afr contol of alignment.
45 Pemanent Bench Marks (BM)
Relerence point of known height relative to @ spaced datum with northing and,
sting values.
48 Gndes
Etevations of any pont with reference to @ soecied datum,
47 Temporary Bench Marks (TBM)
RRe’erence points established from permenent &M at convenient locaton for
seting ou the pavement structure
48 Grdtines
Imaginary ines runing horizontal & vertical with each ne having @ designated
nothing r an eating value
RevisionNe. | Dato Procedure No. Page
0 2n0s2012 ROD-QC-c00.401 dotaCllfar QC PROCEDURE
50 pROcED
5.1 Responsibility
5.11 Verifeaton of bench marks, estabishing
temporary bench marks Fxing of road
alignment and its ‘Surveyor
2 Approval forthe aignment and
Original ground levels Site Incharge
5.2 Acceptance Values
“The vaues 2s stated in ns proceaure are standardised for the Company. In
case of variation against values prescrbed inthe contract document, then the
values provided inthe contract documents shal preva
53 Preparation
53.1 The Supervisor (his nomines) shall verfy that the drawings provided by the
Customer (his nominee) are. approved for cone
revision
lon and are of the fleet
5.3.2. Incases, where existing roads are to be widened / ehabiltates / improved upen,
then no objection cerfiates forthe work shal be dtaine from local euthorbes
(alice, Mistry, Municipality) prior to selting out at sit,
5.3.3. The values ofthe coordinates & elevations of permanent BM (minimum two BM
slations) shall be obtained ftom the contract drawings or fom the Customer (his
ominee) as permanent reference stations, The correctness of these valves
shall be checked physically at site wibin a tolerance of + 2 mm in ine and #5
mm in level. Inthe process of checking, TBM shall be established et every 250
iis or al lasser intervals at location ‘where there is no disrabance due to
consirudion activites. Such TEMS shal be preserved Ul the end ofthe project.
5.3.4 The BM values as verfled (as al clause 5.3.3) shall be compared with values in
the conkact drawings. Dscrepancies, I any, shal be brought othe nobee of tre
CCustomar (his nominee). Welton approval ofthe values of BM a8 checked shall
be obtahed from the Customer (his nominee) prior to commencing the work,
5.4 Instruments for Setting Out
5.4.1. Instruments appropriate forthe inlanded setting aut task and according to the
‘accuracy requirements shall arranged,
5.42. The insiumens shall have valid calibration certificates and shall be In good
working condition. The following instruments shall be required for seting out
survey work
+ Autolovels
+ Theodotte with a eistomat,
“ipods.
Stat,
Ri
jevision No. | Date Procedure No. Page
° 20452012 RDD-9C-00001 softGllfar | QC PROCEDURE
55
56
564
584
87
874
572
573
60
84
62
63.
84
65
20 mis/50 mis Stee! Measuring Tape.
1 Mason Thread
+ 60cm ong Spirit Level
Plumb Bob,
Tools & Tackles for Seting Out
‘The Surveyor shall be responsible for sranging the tools, tackles and materials.
required for Seling Out.” Th shall include bul are nol hmied to steel pegs,
‘wooden pegs, nail, marking powder, pray paint, masking tape, string fines and
bobs.
Setting Out
\with reference to the known BM (as at cause 5.3.3 & 5.2.4) values, the center
line ofthe proposed road shal be localed and marked / pegged at ste using an
appropriae instrument
All the HIPe & VIPs for horizontal & vertical curves along the alignment shall be
located and pegged at site in a similar manner (9s at clause 5.61). The
‘heodotte traverse shall be closed at a BM (as al dause 5.3.3 & clause 5.3.4)
‘and error, f any, shall be linearly dstbuted
ogging chal be dane at 20 mie intarvale on both eee ofthe embankment and
In eases of no embankment. | meter away from the edge ofthe proposed road
longitudinally. Indications of chainages and fished levels for each pavernent
layer to be built up shall be marked on the pegs.
‘The alignment 28 pegged shall be checked with respect to the drawings. Upon
conformity of the algrment contol, the Customer (his nominee) ‘shall be
requested to check and approve the alignment
Levels Along & Across the Alignment
“The existing ground lavels shal be recorded on a level book inthe longitudinal &
vransverse crecions at 10 mis intervals or at intervals sulable to arive at
accurate documentation with reference tothe known BM elevations (as al clause
5.3.3 8 clause 6.34). In cages of conractualrequiemens, the same shall bo
card out jinty withthe Customer (his nominee).
‘The existing ground levels 2s recorded (as at clause 5.7.1) shall be vered with
reference to the conract Grawings and shall be forwarded to the Customer (his
mines) for approval
LUpon approval ofthe alignment (as at clause 5.6.4) and the existing ground
levels by the Customer (his nominee), the road works shall commence for
bulding up pavement ayers,
DOCUMENTATION / RECORDS
‘Survey Report ( Road Works) RDD-GC-000.001-F101
‘Alignment Approval Records.
Bench Mark Approval Records.
Existing Ground Levels Recorded ina Level Book.
No Objection Certfcates,