Purpose: Install two new 3” pinch rollers on the base of the guide roller post.
Fabricate a new pinch roller bracket and two new 3” pinch rollers.
$419.00
All material is guaranteed to be as specified and the above work to be performed in accordance with the drawings and specifications submitted for above work and
completed in a substantial workman like manner for the sum of: ($419.00)
With payments to be made as follows: 50% DEPOSIT, BALANCE IN FULL UPON COMPLETION.
Any alteration or deviation from above specifications involving extra costs, will be executed only upon written orders, and will become an extra charge over and above
the estimate. All agreements contingent upon strikes, accidents, or delays beyond our control. Workmen's Compensation and Liability Insurance on above work to be
Date Signature