1.0 Purpose
1.1 The purpose of this Procedure is to ensure that all materials and equipment are
received and handled in accordance with the Company policy.
2.0 Scope
2.1 This Procedure describes the receipt and handling of general materials,
equipment, piping, ductwork, cable, and other materials in a controlled manner at
various Company sites.
4.0 Responsibilities
4.1 The Contracts Manager/Project Engineer is responsible for the effective operation
of this procedure.
4.2 The Managing Director is responsible for ensuring that this procedure is adhered
to.
4.3 The Site / Stores Supervisor who assumes direct responsibility for the site in the
absence of a site manager, is responsible for ensuring that this standard operating
procedure is adhered to.
4.4 All other responsibilities are defined within the procedure.
5.2.2 The Site / Stores Supervisor ensures that the installation area is cleared for
work, and ensures careful handling of material to avoid scratching
5.2.3 When transferring materials on site, materials are fully supported to prevent
damage or contamination to pipes.
5.2.4 Approved installation gloves are worn at all times when handling materials in
an installation environment.
5.2.5 Material off cuts are disposed of in the designated bin
5.3 Packaging
5.3.1 Packaging instructions are adhered to when moving materials and work in
progress around a site. This is carried out for every job using standard
instructions or specific instructions as required by the contract. These are
identified at the Contract Management, see- MP6.
5.3.2 The Site / Stores Supervisor checks the engineering drawings to establish if
there is any special packaging procedure.
5.3.3 The Site / Stores Supervisor ensures that all openings are blanked off if
necessary, and ensures that all outside surfaces protected by suitable
methods
6.0 Appendices
This procedure contains no form references
7.0 References
MP6, Contract Management procedure
MP8, Material Control procedure
MP10, Non-conformance Control procedure
SPM/13, Traceability procedure