Para Page
APPROVAL 2
PREFACE 6
GLOSSARY 7
ABBREVIATIONS 8
1 INTRODUCTION 9
1.1 Scope of ES/002 9
1.2 Distribution, Use and Regulatory Considerations 9
1.3 Applicable Codes, Standards and Regulations 9
1.3.1 Regulations 9
1.3.2 Shell Expro Standards 10
1.3.3 SIPM Standards 10
1.3.4 International Standards 10
1.3.5 British Standards 10
2 PART A - PURCHASER RESPONSIBILITIES (COMPRISING OF SECTION 2 AND 3) –
INTRODUCTION 10
2.1 Scope of Part A 10
3 REQUIREMENTS 11
3.1 Document Selection and Review 11
3.2 Document Quantities 11
3.3 Document Retention Periods 12
3.4 Maintained Drawings 12
4 PART B - VENDOR RESPONSIBILITIES (COMPRISING OF SECTION 4, 5 AND 6) –
INTRODUCTION 12
4.1 Scope of Part B 12
4.2 Vendor Responsibility 12
4.3 Language 12
4.4 Ownership of Title to Engineering Documents 12
4.5 Submission and Review of Vendor Documents 12
4.6 Repeated Documents 13
4.7 Format of Documentation 13
4.8 Document Retention 13
5 VENDOR DOCUMENT REQUIREMENTS FOR EQUIPMENT AND EQUIPMENT
PACKAGES 13
5.1 Introduction 13
5.1.1 Scope 13
5.2 Contents of Documents 13
5.2.1 General Vendor Data 13
5.2.2 Requirements for Manufacturing Data 14
5.2.3 Requirements for Technical Manual 14
5.2.4 Spare Parts Information 14
5.2.5 Shipping Documents 14
6 VENDOR DOCUMENT REQUIREMENTS FOR BULK PURCHASE MATERIALS 15
6.1 Introduction 15
6.1.1 Scope 15
6.2 Contents of Documents 15
6.2.1 Manufacturing Data 15
6.2.2 Shipping Documents 15
APPENDIX 1 21
1 COMPILATION OF MANUFACTURING DATA 21
1.1 Composition of Manufacturing Data 21
Page 3 of 54
ES/002
Rev 4 1995
Page 4 of 54
ES/002
Rev 4 1995
FIGURES
Figure Page
1 Overview of ES/002 17
2 Complying with UK Supply of Machinery (Safety) Regulations 19
3 Vendor Document Requirement Schedule (VDRS) (Model) 29
4 Vendor Data Selection List A - Control Documents 31
5 Vendor Data Selection List B - Interface Information 32
6 Vendor Data Selection List C - Operating and Maintenance (Sheet 1 of 3) 33
7 Vendor Data Selection List C - Operating and Maintenance (Sheet 2 of 3) 34
8 Vendor Data Selection List C - Operating and Maintenance (Sheet 3 of 3) 35
9 Vendor Data Selection List D - Material Traceability and Certification (Sheet 1 of 4) 36
10 Vendor Data Selection List D - Material Traceability and Certification (Sheet 2 of 4) 37
11 Vendor Data Selection List D - Material Traceability and Certification (Sheet 3 of 4) 38
12 Vendor Data Selection List D - Material Traceability and Certification (Sheet 4 of 4) 39
13 Vendor Data Selection List E - Shipping Documents 40
14 Vendor Data Selection List F - Design, Performance and Characteristics Data (Sheet 1 of 3) 41
15 Vendor Data Selection List F - Design, Performance and Characteristics Data (Sheet 2 of 3) 42
16 Vendor Data Selection List F - Design, Performance and Characteristics Data (Sheet 3 of 3) 43
17 Vendor Document Schedule (VDS) 45
18 Vendor Document Distribution Matrix (VDDM) 47
Page 5 of 54
ES/002
Rev 4 1995
PREFACE
This Standard specifies the requirements of Shell U.K. Exploration and Production for engineering
documentation to be provided in support of equipment and materials supplied by Vendors.
Since the issue of the previous revision of ES/002 there have been significant changes to the way in
which Shell Expro conducts its business with respect to the provision of engineered materials and
equipment for its production facilities and pipeline systems. That function is, in addition to Shell
Expro's purchasing activities, conducted or supported by agents and contractors acting on behalf of
Shell Expro.
It is essential that materials and equipment are supplied as economically as practical to meet the
requirements of the customer, Shell Expro. Vendor supplied documentation is a key element of that
requirement and so it must be managed efficiently to generate the minimum amount of paperwork
effort whilst providing all of the ESSENTIAL INFORMATION to the design contractors and end users.
Vendor documentation is also a major source of engineering information used by project teams
throughout the life of installations. The accuracy and reproducibility of the information is crucial to
maintaining project and operating efficiency and for supporting installation improvements. Based on
GOAL SETTING OBJECTIVES this Standard defines the process to be adopted for document
selection and guides those responsible for that process.
This Standard is structured to emphasise the responsibilities of the main users of the Standard and is
summarised graphically in Figure Overview of ES/002.
This revision of the Standard has been substantially modified compared to the previous revision
thereby making it impractical to highlight the changes in the conventional manner. The user is
therefore advised to regard this Standard as a new document.
Page 6 of 54
ES/002
Rev 4 1995
GLOSSARY
DEFINITIONS
ISO 8402 1994-04-01 Quality Management and Quality Assurance
For the purposes of this Standard the definitions given above shall apply together with those listed
below:
Agent The Shell Expro appointed contractor with authority to act on behalf of Shell Expro.
Contractor The Shell Expro appointed main contractor for a defined scope of work.
Custodian Referred to by reference indicator, not as an individual by name. The specialist
whose knowledge, experience, expertise and status are appropriate for maintaining
the validity of the document and for providing advice on its contents as required.
Document Is that which can be identified and traced by a number that is unique to itself, be it
single sheet or multi-page. (e.g. drawing and technical manual).
Equipment An item normally manufactured to order for a specific purpose. (e.g. coded vessel,
fire pump, process control panel, switchboard).
Equipment An assembly of interconnecting items of equipment (e.g. fiscal metering skid, gas
Package dehydration package).
Inspecting Inspection party appointed by either Purchaser or Vendor to satisfy statutory
Authority requirements. (e.g. for verification of design, construction and testing of pressure
vessels)
Machinery As defined by the Supply of Machinery (Safety) Regulations.
Manufacturer The company responsible for the manufacture; not necessarily the Vendor.
Materials Mass/batch produced components, not necessarily manufactured to order, for
incorporation by others into a system/equipment/equipment package. (e.g. pipe,
fittings, flanges, structural steel sections, valves, instruments, glands, junction
boxes, compression fittings).
Product That to be supplied by the Vendor including all materials and equipment included
therein and all related documentation.
Purchaser The organisation responsible for carrying out the purchasing function; i.e. Shell
Expro or Shell Expro appointed contractor or agent.
Purchasers Inspector appointed by the Purchaser to ensure compliance with Purchase Order.
Inspector
Purchase A request from Purchaser to supply the product. It includes Supply Agreements and
Order other supply arrangements agreed to by Shell Expro.
Shell Expro Shell U.K. Exploration and Production.
Sub-contractor A company awarded a contract by a Contractor to do part of the work awarded to
the Contractor by Shell Expro. The work of the Sub-contractor is carried out under
the direction and control of the Contractor. Under it's model contracts Shell Expro
has the right to review all proposed Sub-contractors and sub-contracts.
Sub-vendor Any person or company (other than Purchaser) having an agreement with Vendor
for the supply of the product, part of the product or a service (e.g. design, testing)
associated with the product.
Tenderer A Vendor or contractor invited to tender a bid at the enquiry stage.
User A person or organisation that owns the product or has overall responsibility for it or
uses it or relies upon data relating to it as prime source of information.
Vendor The supplier of equipment or material; not necessarily the manufacturer.
Page 7 of 54
ES/002
Rev 4 1995
ABBREVIATIONS
Page 8 of 54
ES/002
Rev 4 1995
PART 1
INTRODUCTION
1 INTRODUCTION
1.1 Scope of ES/002
This Standard provides a 'Model' for the required selection, content, presentation and quality of
Vendor's technical information to be submitted to the Purchaser and shall be used by Shell Expro or
by agents or contractors authorised by Shell Expro to act on its behalf and by Vendors.
This Standard shall apply to all documentation specified in Purchase Orders:
• for equipment and equipment packages;
• for bulk materials with or without a MESC description.
This Standard defines the process for the submission and review of the Vendor documents. It must be
recognised by those involved in the purchase of equipment and materials (the product) that
unnecessary requests for and approvals of Vendor documentation be avoided whilst achieving the primary
goals
that:
• enable satisfactory operation and maintenance;
Embodied by the Technical Manual, which is the information for product user.
• permit product incorporation into design;
Data essential to contractor to incorporate the product into the project design.
• prove material traceability and compliance with specification;
Records and data generated by and for the records of Vendor in support of product compliance
but not necessary for Purchasers activities.
• permit progress monitoring of purchase order;
Information essential to the Purchaser only for the life of the Purchase Order.
It must also be recognised that a Vendor with whom a Purchase Order is placed is contractually
invested with clearly defined areas of responsibility and further would previously have demonstrated
their capabilities to the satisfaction of Shell Expro in order to be entered in VIM. On that basis,
together with specific legal documents.
Only the first two primary goals meet the needs of Shell Expro.
1.2 Distribution, Use and Regulatory Considerations
Deviation from this Standard is permitted only with the written approval of the Shell Expro Custodian
or agents acting on its behalf.
The requirements of this Standard are in addition to those of statutory regulations and instruments
governing the supply and use of particular types or groups of equipment or materials. For example SI
1992 No 3073 The Supply of Machinery (Safety) Regulations, 1992.
Where an agent or contractor of Shell Expro has an established procedure for the selection and
review of Vendor documentation, this Standard shall be used to evaluate that procedure.
1.3 Applicable Codes, Standards and Regulations
1.3.1 Regulations
Provision and Use of Work Equipment Regulations SI 1992 No. 2932.
The Supply of Machinery (Safety) Regulations SI 1992 No. 3073.
The Supply of Machinery (Safety) (Amendments) Regulations SI 1994 No. 2063.
Control of Substances Hazardous to Health (COSHH) Regulations SI 1994 No. 3246.
Chemicals (Hazard Information and Packaging for Supply) Regulations SI 1994 No. 3247.
Page 9 of 54
ES/002
Rev 4 1995
Page 10 of 54
ES/002
Rev 4 1995
3 REQUIREMENTS
3.1 Document Selection and Review
Engineering judgement shall be exercised by the Purchaser with respect to Vendor established
practices and standards relating to technical documentation. Every effort shall be made to
utilise Vendor standard documentation.
Purchaser must be fully conversant with all sections of this Standard, including Part B.
The VDRS shall be employed to ensure that only documents relevant to the users needs are
requested and the review party for each document type is identified, as in Appendix 3 Vendor
Document Requirements Schedule (VDRS).
The review of Vendor documents should be conducted wherever practical by only one of the following:
• Inspecting Authority (primarily pressure vessels and heat exchangers);
• Purchaser's appointed inspectors (primarily manufacturing records and certification);
• Purchaser's design team (primarily Technical Manual and interface documents).
The need for documentary evidence to satisfy a Certifying Authority (CA) for an offshore installation
must also be accounted for as part of the supply of equipment and materials. The content and timing
of such evidence shall be determined by the CA through the owner of the offshore installation.
ERDs are in force for specific types of equipment (e.g. centrifugal pumps and pressure vessels).
Where they specify Vendor document requirements, those ERDs alone shall be the prime reference
source and, with the exception of Control Documents and Shipping Documents, shall not be added to
without justification.
Documentation for bulk materials, equipment and equipment packages may be defined under a
Supply Agreement or similar arrangement between Shell Expro and a Vendor. Purchaser shall limit
requests for additional documents to those necessary for design interface, installation, operating and
maintenance information or to comply with health, safety and environmental issues when the
agreement is non-specific or is silent.
The Purchasers document review procedure shall be in accordance with Appendix 4 Vendor
Document Review Process.
Repeatable documents shall be reviewed only once by the Purchaser. Refer to Appendix 5 Repeated
Vendor Documents and Appendix 4 Vendor Document Review Process.
t is recommended that the Purchaser maintains an indexed file for Vendor repeatable documents.
Attention is drawn to the Purchasers responsibilities when machinery is imported directly by the
Purchaser into the European Community. In such situations the Purchaser becomes the "responsible
person" as defined by the UK Supply of Machinery (Safety) Regulations 1992 and amendments and
shall be responsible for obtaining and retaining the technical file and for providing the declaration of
conformity or of incorporation (together with the CE mark) applicable to the machinery. The
responsibilities are summarised in Figure Complying with UK Supply of Machinery (Safety
Regulations).
3.2 Document Quantities
Quantities of individual documents distributed for review/information shall be minimised by ensuring
that they are provided only to those users who have need of the information for their functional duties.
Blanket distribution within an organisation shall be avoided. Distribution of Vendor documentation
within Purchasers organisation during the review process shall be controlled in accordance with
Appendix 4 Vendor Document Review Process.
Page 11 of 54
ES/002
Rev 4 1995
The distribution of final documents after the Purchasers review process shall be limited to the end
users. Quantities of individual documents shall be agreed with the end users. Distribution and
quantities may be dependant upon the format in which the final approved documents are submitted to
Shell Expro. Refer to Appendix 8 Preferred Document Format.
3.3 Document Retention Periods
The minimum period of time for which Vendor supplied documents are to be retained is specified in
the Shell Expro Corporate Document Retention Schedule (CDRS) or Field Unit equivalent. The
duration relevant to documents to be retained by the Vendor shall be specified in the Purchase Order:
the duration being determined by life of the facility or equipment or to satisfy regulations governing the
facility or equipment or for other legal obligations.
3.4 Maintained Drawings
Drawings that are subject to QA audit trail procedures may be subject to maintenance during the life of
the equipment they serve as defined by EM/075 Drawing Maintenance and Management.
Maintained drawings (e.g. P and IDs) shall be clearly identified and included on the VDRS.
Maintained drawings are to be stored in DMS.
Page 12 of 54
ES/002
Rev 4 1995
The method and timing of the document submission by the Vendor to the review parties shall be a
matter of agreement between the Vendor and the review parties, as defined in Document Selection
and Review.
The Vendor shall be responsible for obtaining the written approval where appropriate.
The Vendor shall comply with the U.K. Supply of Machinery (Safety) Regulations 1992 and
amendments that govern the supply of machinery with respect to documentary evidence to prove
conformance with the regulations. Attention is drawn to the Vendors responsibilities when machinery
as defined by the regulations is imported by the Vendor into the European Community. In such
situations the Vendor becomes the "responsible person" as defined by the regulations and is
responsible for obtaining and retaining the technical file and for providing the declaration of conformity
or of incorporation (together with the CE mark) applicable to the machinery. The responsibilities are
summarised in Figure Complying with UK Supply of Machinery (Safety Regulations).
4.6 Repeated Documents
At the Purchase Order enquiry stage the Vendor shall identify to the Purchaser those documents that
have previously been supplied to Shell Expro under an earlier Purchase Order as defined by Appendix
5 Repeated Vendor Documents.
4.7 Format of Documentation
The Vendor shall agree with the Purchaser the format of final documentation to be supplied to the
Purchaser. Refer to Appendix 8 Preferred Document Format and Appendix 9 Electronic Format
Requirements.
4.8 Document Retention
The secure retention of and subsequent access to technical documentation is essential to satisfy Shell
Expro's engineering, contractual and legal obligations. Shell Expro does not, however, intend to retain
a copy of every technical document provided in support of equipment and materials purchased by it or
on its behalf. Vendor shall retain those documents as identified in the Purchase Order or the Supply
Agreement or other agreement between Shell Expro and a Vendor to comply with the regulations
governing the supply of materials and equipment.
Documentation to be retained by the Vendor on behalf of Shell Expro does not of necessity have to
exist in 'book' form provided the Vendor's filing system is logical and allows access to all data relevant
to a Purchase Order. The Vendor's filing system shall be referenced to the Purchase Order. The filing
method to be adopted by Vendor shall be agreed with the Purchaser at the Purchase Order enquiry
stage.
The Vendor shall permit the Purchaser access to the retained documentation.
Page 13 of 54
ES/002
Rev 4 1995
(1) Data shall be certified as accurate, correct, relative to the scope of supply and dated.
(2) Irrelevant data shall be edited from the submission.
(3) Relevant data shall be clearly identified and the Purchase Order and equipment tag numbers
shall be clearly indicated.
Failure to comply with these requirements shall result in non-acceptance.
5.2.2 Requirements for Manufacturing Data
Manufacturing Data shall be compiled in accordance with Appendix 1 Compilation of Manufacturing
Data.
Vendor shall advise Purchaser at the Purchase Order enquiry stage by completing the VDS, the
documents and data to be produced by the Vendor to ensure compliance with the Purchase Order and
regulations and codes applicable to the material/equipment to be supplied.
Manufacturing Data shall be compiled progressively as the work proceeds and submitted to the
Purchaser in accordance with the Purchase Order for interim acceptance and, upon completion, for
final acceptance.
5.2.3 Requirements for Technical Manual
Technical Manual shall be compiled in accordance with Appendix 2 Technical Manual Requirements.
Information on erection/installation/commissioning may be required by the Purchaser in advance of
the date when the Technical Manual will be available. Such information as identified on the VDRS
shall be submitted to the Purchaser as stand alone documents and later incorporated in the Technical
Manual.
The Technical Manual shall be submitted by the Vendor to the Purchaser as a fully completed
document for review and acceptance.
5.2.4 Spare Parts Information
Spares parts data shall be compiled in accordance with Appendix 6 Spare Parts Data.
5.2.5 Shipping Documents
Unless specified otherwise in a Purchase Order the Vendor shall supply with the delivered equipment
or equipment package shipping documentation in compliance with this Standard.
Two copies of the specified documentation shall be provided; one copy within the packing case or
packaging and one copy in a waterproof envelope securely attached to the outside of the packing
case or packaging.
Each copy of the shipping document shall where applicable to the Purchase Order and equipment to
be supplied include:
• Vendor's packing list;
• Shipping, off-loading, preservation and storage instructions;
• Purchasers release note;
• Inspecting Authority certificate (e.g. form X for pressure vessels) where applicable;
• Declaration of Conformity (for machinery);
• Declaration of Incorporation (for machinery);
• Lifting equipment certificates and final weighing certificate;
• Material Safety Data Sheets (MSDS) to accompany all chemical, equipment containing
chemicals and equipment capable of releasing chemicals in normal use. MSDS to provide the
hazard information necessary to meet the duties in SI 1994 No 3246 Control of Substances
Hazardous to Health Regulations.
Alternatively, as amended, and to comply with the requirements of SI 1994 No 3247 Chemicals
(Hazard Information and Packaging for Supply) Regulations.
Page 14 of 54
ES/002
Rev 4 1995
Upon first supply of the goods one copy of the MSDS shall be issued to Shell Expro Safety and
Environmental Affairs Department, attention of UESE/14, for registration in the central MSDS
database;
• Material certificates stating chemical and mechanical properties where welding is to be
performed by the construction contractor to install equipment (e.g. welding pump base plate to
module deck.).
Page 15 of 54
ES/002
Rev 4 1995
Page 16 of 54
ES/002
Rev 4 1995
1. INTRODUCTION
PRIMARY GOALS
- Enable satisfactory operation and maintenance
- Permit product incorporation into design
- Prove material traceability and compliance with specification
- Permit progress monitoring of purchase order
DOCUMENT REVIEW
AND
RECORDS RETENTION APPROVAL CYCLE RECORDS RETENTION
- Product compliance data - Design data
- Installation, operating and - Manufacturing records
maintenance instructions (traceability - all products)
- Maintainable drawings (technical file - machinery)
RESULT
- Makes visible the function
of requested documents
- Identifies document users
- Reduces paperwork
- Reduces engineering effort
- Reduces document maintenance
Page 17 of 54
ES/002
Rev 4 1995
Page 18 of 54
ES/002
Rev 4 1995
RESPONSIBLE PERSON
(depending on supply route)
Manufacturer in the EC
Supply TO ENSURE CONFORMANCE WITH THE REGULATIONS:
source - believing machinery is for
from supply to the EC Ensure that a system is in place to check that an EC declaration of conformity or
within - includes persons assembling incorporation is held for all relevant machinery and safety components and that such
EC machinery or parts into items are appropriately CE marked.
relevant machinery
Manufacturer's authorised
representative in the UK All procured items of safety components are to be supplied with EC declaration
of conformity.
applicable when manufacturer
Supply is not established in the EC
source All procured items of relevant machinery to be incorporated into other machinery
external are to be supplied with EC declaration of incorporation.
to
EC
Purchaser takes on the duties of the responsible person when it assembles
Person (1) who first machinery to form integrated units of relevant machinery.
supplies the relevant
machinery in the EC
applicable when the Person who first imports machinery from outside the EC becomes the
manufacturer or authorised responsible person.
representative is not In such a case the technical file, test reports and certification is to be supplied with
established in the UK the relevant machinery to the responsible person to comply with the regulations.
Responsible person is responsible for issue of declaration of conformity or incorporatio
(1) Person can be Purchaser and for the CE marking of the relevant machinery.
as defined in ERD ES/002
Page 19/20 of 54
ES/002
Rev 4 1995
APPENDIX 1
1 COMPILATION OF MANUFACTURING DATA
1.1 Composition of Manufacturing Data
Manufacturing Data shall be compiled in two parts:
PART A - Handover Data: It shall be submitted to the Purchaser after it has been approved by the
Purchasers appointed inspector.
PART B - Compliance and Design Data: It shall be retained by the Vendor for the period specified in a
Purchase Order. Vendor shall permit the Purchaser access to Part B.
Both parts shall fully index the contents.
1.2 Contents of Manufacturing Data Part A
The Manufacturing Data Part A shall be compiled in loose leaf book form in compliance with this
Standard.
Unless otherwise specified in the Purchase Order, Manufacturing Data Part A shall contain the
following.
A1 Purchase Order Information:
• Purchase Order number;
• Vendor name, address, telephone, telefax and telex numbers;
• Names, addresses, telephone, telefax and telex numbers of sub-vendors and description of the
items supplied by the sub-vendors;
• List of Purchase Order variations.
A2 Specified Requirements:
• List of specifications used for the manufactured material/equipment;
• List of Purchaser approved deviations and concessions to the requirements specified in the
Purchase Order;
A3 Compliance Certification:
• A Certificate of Compliance signed by a director or senior executive of the Vendor stating that
the product complies with the requirements specified in the Purchase Order, the applicable
regulations and relevant codes together with as appropriate;
• Declaration of Conformity/Incorporation as applied to machinery,
• Vessel fabrication/inspection code compliance (e.g. BS 5500 Specification for Unfired
Fusion Welded Pressure Vessels),
• Type approval certificate (e.g. BASEEFA),
• Name plate rubbing or photograph where applicable;
• Material Safety Data Sheets (MSDS);
• Weight certificate and weight reconciliation statement;
• Certifying Authority release note where applicable;
• Inspection Release Note issued by the Purchaser's inspector;
• List of the contents of Part B. All documents shall be fully described by title, function where not
clear by the title, Vendors document number, Purchasers document number where a document
was submitted for review and any other number by which a document may be referenced by the
Vendor.
Page 21 of 54
ES/002
Rev 4 1995
Page 22 of 54
ES/002
Rev 4 1995
Page 23 of 54
ES/002
Rev 4 1995
APPENDIX 2
2 SPECIFICATION
Vendor shall provide the specification for the Technical Manual and shall advise the Purchaser
whether it is an existing 'standard' or one that will be developed for the product.
The Vendor's standard specification adapted where necessary to comply with this Appendix should be
used wherever practical.
Page 24 of 54
ES/002
Rev 4 1995
Page 25 of 54
ES/002
Rev 4 1995
Information shall additionally include the SPIR data: refer to appendix 6 of the Standard.
3.9 15 Category: Modification Instructions
BS 4882: Part 2 clause 15 Guide to Content.
For equipment or equipment packages that by the nature of their complexity or development history
may be subject to modifications after delivery to the Purchaser, provisions shall be made in the
Technical Manual:
• to record modifications to the equipment during both it's guarantee period and it's normal
operating life;
• for the treatment of additions or modifications to the Technical Manual after it's formally
approved issue to the Purchaser for use with the delivered equipment.
3.10 16 Category: Disposal Instructions
BS 4882: Part 2 clause 16 Guide to Content.
Information shall additionally include:
• Material Safety Data Sheets (MSDS) relevant to the equipment supplied including component
parts and consumables in order that the Purchaser is able to comply with SI 1994 No 3246
Control of Substances Hazardous to Health Regulations, 1994.
Page 26 of 54
ES/002
Rev 4 1995
APPENDIX 3
Page 27 of 54
ES/002
Rev 4 1995
(8) ERD code is the old document number that may be in use in equipment specific ERDs. It is in
the Vendor Document Selection List for reference only.
(9) 'ENG' means that the document could be multi-discipline.
Page 28 of 54
ES/002
Rev 4 1995
Doc. A - CONTROL DOCUMENTS REVIEW CLASS FIRST ASSIGN REQ'D Doc. (6) C - OPERATIONS AND REVIEW CLASS FIRST ASSIGN REQ'D Doc. REVIEW CLASS FIRST ASSIGN REQ'D
No. To be completed for all purchase orders WITH AFTER REVIEW TO: FOR: No. MAINTENANCE WITH AFTER REVIEW TO: FOR: No. WITH AFTER REVIEW TO: FOR:
BID P.O. Selective Information BID P.O. BID P.O.
(1) (2) (2) (3) (4) (5) (1) (2) (2) (3) (4) (5) (1) (2) (2) (3) (4) (5)
E - SHIPPING DOCUMENTS
E01 SHIPPING DOCUMENT b/c
E02 VENDORS PACKING LIST E01
E03 PURCHASERS RELEASE CERTIFICATE E01
NOTE 1. To be completed by Purchaser to reflect the Material/
Equipment to be supplied by Vendor.
Refer to ES/002 sections 5 & 6 and VDSL of Appendix
VENDOR SHALL CONFIRM DOCUMENT SELECTION AND DATA TO BE PRODUCED TO SUPPORT MATERIAL/EQUIPMENT ( ) SIGNIFIES AN EXPLANATORY NOTE - SEE ES/002 APPENDIX 3
BEING SUPPLIED BY SUBMITTING TO PURCHASER A COMPLETED VDS.
EQUIPMENT DESCRIPTION
T - REVIEW BY INSPECTING AUTHORITY E01 - SHIPPING DOCUMENT
W - TO BE AVAILABLE ON REQUEST OF PURCHASER/ AS IDENTIFIED UNDER COLUMN 'ASSIGN TO:'
SHELL EXPRO
X - TO BE REVIEWED AS PART OF COMPLETED DOCUMENT SELECTION CODE: (5)
(TECHNICAL MANUAL/MANUFACTURING DATA) a - PROJECT/VENDOR DESIGN INTERFACE
b - INSTALLATION, OPERATING AND/OR MAINTENANCE TAG No.
c - HEALTH, SAFETY AND ENVIRONMENT ISSUE
(TO COMPLY WITH REGULATIONS). PURCHASE ORDER/CONTRACT No.
Page 29/30 of 54
ES/002
Rev 4 1995
Note: A. Documents grouped according to their primary use and final destination. Certain documents, however, are
common to more than one group as evident by their document number (Doc. No.) and final destination.
Page 31 of 54
ES/002
Rev 4 1995
Note: A. Documents grouped according to their primary use and final destination. Certain documents, however, are
common to more than one group as evident by their document number (Doc. No.) and final destination.
Page 32 of 54
ES/002
Rev 4 1995
Note: A.Documents grouped according to their primary use and final destination. Certain documents, however, are
common to more than one group as evident by their document number (Doc. No.) and final destination.
Page 33 of 54
ES/002
Rev 4 1995
Note: A.Documents grouped according to their primary use and final destination. Certain documents, however, are
common to more than one group as evident by their document number (Doc. No.) and final destination.
Page 34 of 54
ES/002
Rev 4 1995
C30 PREPARATION FOR SHIPPING WITH HANDLING AND P06 R C01 ENG.
STORAGE PROCEDURES
Vendors to propose techniques. Reference should be made to
project specifications. Indicate size of container, number off,
weight, identification of and contents; include detailed preservation
procedure detailing inspection periods, materials required etc.
To include details for shipping by sea by others where required by
Purchase Order.
C31 UNPACKING, INSTALLATION/ERECTION PROCEDURES P07 R C01 ENG.
C32 PRECOMMISSIONING/COMMISSIONING PROCEDURES P08 R C01 ENG.
C33 PROCEDURES FOR MAINTAINING EQUIPMENT INTEGRITY P13 X C01 ENG.
Procedures for 'mothballing' must be considered. If relevant,
requirements for inhibition, preservation, drainage, venting,
temporary heating, purging etc. must be defined.
C34 LIST OF PROGRAMMABLE ELECTRONIC SYSTEMS (PES) - S C01 INSTR.
To include the settings/logic recorded during the factory D01 ELECTR
acceptance tests (FAT).
C35 CERTIFIED AS-BUILT DRAWINGS - To show the as supplied D01 X C01 ENG.
arrangement/details/conditions of goods supplied to Shell Expro.
C36 FAN, DUCTING AND DAMPER DRAWINGS D30 R C01 HVAC
C37 INSTRUMENT/ELECTRICAL LOGIC DIAGRAMS D02 X C01 INSTR.
ELECTR
Note: A.Documents grouped according to their primary use and final destination. Certain documents, however, are
common to more than one group as evident by their document number (Doc. No.) and final destination.
Page 35 of 54
ES/002
Rev 4 1995
Note: A.Documents grouped according to their primary use and final destination. Certain documents, however, are
common to more than one group as evident by their document number (Doc. No.) and final destination.
Page 36 of 54
ES/002
Rev 4 1995
Note: A. Documents grouped according to their primary use and final destination. Certain documents, however, are
common to more than one group as evident by their document number (Doc. No.) and final destination.
Page 37 of 54
ES/002
Rev 4 1995
D25 HARDNESS TEST RESULTS - Defining techniques and results of R15 S D02 MECH.
production hardness tests as required in Data Sheets/Unique Specs. STRUCT.
Vendor to clearly identify components tested, location and
heat-treated condition.
D26 WELDER PERFORMANCE QUALIFICATION RESULTS AND R16 S D02 MECH.
CERTIFICATES - Qualifications of all welders/welding operators STRUCT.
using approved weld procedures and by weld position in compliance
with Purchaser Requirements. Use Vendor standard form.
D27 NDT OPERATOR QUALIFICATION CERTIFICATES - To CSWIP orR17 S D02 MECH.
other Purchaser approved standards for radiographic, ultra-sonic, STRUCT.
magnetic particle and dye-penetrant examination.
D28 CERTIFICATES FOR EQUIPMENT IN HAZARDOUS AREA R18 S D01 ELECTR.
eg. BASEEFA equipment certified for use in hazardous areas by INSTR.
BASEEFA, PLB, etc. must also be accompanied by a valid licence
for the particular type of equipment.
D29 NDT TEST REPORTS - Detailed NDT reports detailing procedure R19 S D02 MECH.
used, acceptance levels, results obtained and action for radiographic, STRUCT.
ultrasonic, magnetic particles and dye-penetrant examinations.
Reports shall identify code/standard, components tested, location,
operator, date, heat treated condition and weld repairs (if applicable).
D30 MATERIAL TEST CERTIFICATES - Inspecting Authority/Certifying R20 S D02 MECH.
Authority endorsed certificates for pressure containing or structurally STRUCT.
loaded parts, to achieve full component identification. Include
chemical analyses, specification range analysis, mechanical test
results and heat treated condition as a minimum. Certificates must be
fully traceable for each part by means of serial or unique numbering
system. Certificates shall comply with criteria defined by specified
traceability requirements as defined within the requisition.
D31 HEAT TREATMENT CERTIFICATES - Certificates with endorsement R21 S D02 MECH.
by Inspecting Authority any heat treatment conducted during forming STRUCT.
or fabrication such as normalising, quenching, post-weld heat
treatment, etc. Certificates must be fully traceable for each part by
means of serial or unique numbering system.
D32 HEAT TREATMENT CHARTS R21.1 S D02 MECH.
STRUCT.
Note: A. Documents grouped according to their primary use and final destination. Certain documents, however, are
common to more than one group as evident by their document number (Doc. No.) and final destination.
Page 38 of 54
ES/002
Rev 4 1995
Note: A. Documents grouped according to their primary use and final destination. Certain documents, however, are
common to more than one group as evident by their document number (Doc. No.) and final destination.
Page 39 of 54
ES/002
Rev 4 1995
Note: A. Documents grouped according to their primary use and final destination. Certain documents, however, are
common to more than one group as evident by their document number (Doc. No.) and final destination.
Page 40 of 54
ES/002
Rev 4 1995
Figure 14 Vendor Data Selection List F - Design, Performance and Characteristics Data
(Sheet 1 of 3)
Page 41 of 54
ES/002
Rev 4 1995
Note: A. Documents grouped according to their primary use and final destination. Certain documents, however, are
common to more than one group as evident by their document number (Doc. No.) and final destination.
Figure 15 Vendor Data Selection List F - Design, Performance and Characteristics Data
(Sheet 2 of 3)
Page 42 of 54
ES/002
Rev 4 1995
Note: A. Documents grouped according to their primary use and final destination. Certain documents, however, are
common to more than one group as evident by their document number (Doc. No.) and final destination.
Figure 16 Vendor Data Selection List F - Design, Performance and Characteristics Data
(Sheet 3 of 3)
Page 43 of 54
ES/002
Rev 4 1995
APPENDIX 4
Page 44 of 54
ES/002
Rev 4 1995
Page 45/46 of 54
ES/002
Rev 4 1995
Page 47/48 of 54
ES/002
Rev 4 1995
APPENDIX 5
Page 49 of 54
ES/002
Rev 4 1995
APPENDIX 6
2 INSURANCE SPARES
Insurance spares are parts, assemblies or complete items of equipment that are required for items not
subject to deterioration by normal use but failure of which is critical for continuous safe operation of
plant. Insurance spares are normally selected by the Purchaser or Shell Expro. Vendor shall ensure
that the technical data supplied to Purchaser contains all relevant information to enable insurance
spares to be clearly identified.
3 E-SPIR
SPIR data is compiled electronically by the Vendor on E-SPIR, a copy of which together with
instructions is available from UEOS/3611 at Shell Expro. E-SPIR replaces the SPIR form.
For Purchaser review of SPIR data Vendor shall submit the information either electronically (disc) or
by hard copy printed from E-SPIR. After Purchasers acceptance of the SPIR data, Vendor shall submit
it in electronic format (disc) to the Purchaser and include a hard copy in the Technical Manual.
Full details of SPIR data requirements and E-SPIR are provided in DEP 70.10.90.11 Spare Parts for
Initial and Normal Operations.
Page 50 of 54
ES/002
Rev 4 1995
APPENDIX 7
PRESENTATION OF DOCUMENTS
1 PRESENTATION OF DOCUMENTS
1.1 Document Presentation, Format and Quality
All documents shall comply with the requirements of this Appendix unless approved otherwise in
writing by the Purchaser.
1.1.1 Organisation and Presentation
Data shall be logically organised and all contents of manuals and books properly indexed. A revision
status record shall be included on drawings and in manuals and books and revision indication shall
appear on each amended sheet. All submissions with the exception of drawings shall be in durable
loose-leaf folders in accordance with BS 5641 Recommendations for loose-leaf publications.
The front cover shall identify the contents and state as a minimum the Purchase Enquiry/Purchase
Order number, the equipment title and it's tag number and the Vendor's document number and
revision status.
1.1.2 Document Size
With the exception of drawings and certain forms, such as test certificates, all documents shall be A4
size.
For manuals and books, A3 drawings are acceptable and shall be folded to A4 size with the title
visible. If drawings larger than A3 are used they shall be folded into A4 size plastic wallets with the title
block clearly visible. Wallets only, not drawings, shall be secured in the loose-leaf folder to allow easy
removal of the enclosed drawing. Wallets shall be open at the top only.
1.1.3 Reproducibles and Prints
All reproducible drawings shall be supplied on 0.003 inches Velo Reverse Film and be supplied rolled,
not folded. Reproducibles shall be taken direct from the original. Sepia copies or copies of
reproducibles are not acceptable under any circumstances.
Prints shall be supplied with black lines on clean white paper of weight 70 grams per square metre.
Photocopies shall be good clean quality on paper of minimum weight of 80 grams per square metre
and maximum weight of 100 grams per square metre.
1.1.4 Clarity
Quality of presentation shall meet the criteria defined in BS 5536 Recommendation for Loose-leaf
Publications and ANSI/ASME Y14.2M.
Test and inspection certificates and records shall be legible including the name, signature and date of
the Vendor's and the Purchaser's appointed inspecting representatives.
1.1.5 Drawing Symbols
Unless approved otherwise by the Purchaser, British Standard BS 308 Engineering Drawing Practice.
As an option to be defined by the Purchaser in a Purchase Order the Vendor shall be instructed to
comply with the Shell Expro Manual EM/004 Drawing Office Standards and Procedures.
This option will be exercised only on equipment orders of significant value or magnitude.
1.1.6 Units
Unless approved otherwise by the Purchaser, units shall be SI units.
1.1.7 Identification
As a minimum each document shall clearly show:
• the Purchase Order number;
• the document number as identified by the VDRS;
Page 51 of 54
ES/002
Rev 4 1995
Page 52 of 54
ES/002
Rev 4 1995
APPENDIX 8
Page 53 of 54
ES/002
Rev 4 1995
APPENDIX 9
Page 54 of 54