You are on page 1of 123

DRAWING LIST NOTES:

1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN


METRES UNLESS SHOWN OTHERWISE.
NO. DRAWING. NO. DRAWING TITLE REV 1.0 REV 2.0 REV 3.0 REV 4.0 NO. DRAWING. NO. DRAWING TITLE REV 1.0 REV 2.0 REV 3.0 REV 4.0 2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE
DATUM UNLESS STATED OTHERWISE.
1 KAZ-CO-DD-OC-DW-5110A OPEN CUT, DRAWING LIST (1) 53 KAZ-CO-DD-OC-DW-5227 OPEN CUT AL FAW SIDE - LONGITUDINAL SECTION F - REINFORCEMENT SEGMENT 4 (4)
3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL
2 KAZ-CO-DD-OC-DW-5110B OPEN CUT, DRAWING LIST (2) KAZ-CO-DD-OC-DW-5192 OPEN CUT AL FAW SIDE - SECTION A, B, C, D, E & F - GEOMETRY SHEAR KEYS - BOTTOM SLAB DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
54
DIMENSIONS ONLY - IF IN DOUBT ASK.

3 KAZ-CO-DD-OC-DW-5111 OPEN CUT, GENERAL NOTES (1) 55 KAZ-CO-DD-OC-DW-5193 OPEN CUT AL FAW SIDE - SECTION A & B - GEOMETRY SHEAR KEYS - OUTER WALL 4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT
SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
4 KAZ-CO-DD-OC-DW-5220A OPEN CUT, GENERAL NOTES (2) 56 KAZ-CO-DD-OC-DW-5194 OPEN CUT AL FAW SIDE - SECTION A & B - GEOMETRY SHEAR KEYS - INNER WALL PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
5 KAZ-CO-DD-OC-DW-5220B OPEN CUT, GENERAL NOTES (3) 57 KAZ-CO-DD-OC-DW-5195 OPEN CUT AL FAW SIDE - SECTION C, D, E & F - GEOMETRY SHEAR KEYS - OUTER WALL
ENGINEER.

6 KAZ-CO-DD-OC-DW-5148A OPEN CUT AL FAW SIDE - REINFORCEMENT - OPENING DETAILS (1) 58 KAZ-CO-DD-OC-DW-5196 OPEN CUT AL FAW SIDE - SECTION A, B, C, D, E & F - REINF. SHEAR KEYS - BOTTOM SLAB 5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED
AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
7 KAZ-CO-DD-OC-DW-5148B OPEN CUT AL FAW SIDE - REINFORCEMENT - OPENING DETAILS (2) KAZ-CO-DD-OC-DW-5197 OPEN CUT AL FAW SIDE - SECTION A & B - REINFORCEMENT SHEAR KEYS - OUTER, INNER WALL REINFORCEMENT.
59
6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS
8 KAZ-CO-DD-OC-DW-5112 OPEN CUT AL FAW SIDE - TYPICAL SECTION A - HORIZONTAL & LONGITUDINAL SECTION 60 KAZ-CO-DD-OC-DW-5198 OPEN CUT AL FAW SIDE - SECTION C, D, E & F - REINFORCEMENT SHEAR KEYS - OUTER WALL PER SUPPLIER'S RECOMMENDATION.

9 KAZ-CO-DD-OC-DW-5113 OPEN CUT AL FAW SIDE - TYPICAL SECTION A - SEGMENTS 1-2-3 61 KAZ-CO-DD-OC-DW-5185A OPEN CUT UMM QASR - REINFORCEMENT - OPENING DETAILS (1)

10 KAZ-CO-DD-OC-DW-5114 OPEN CUT AL FAW SIDE - TYPICAL SECTION A - REINFORCEMENT SEGMENTS 1-2-3 (1) 62 KAZ-CO-DD-OC-DW-5185B OPEN CUT UMM QASR - REINFORCEMENT - OPENING DETAILS (2)

11 KAZ-CO-DD-OC-DW-5218A OPEN CUT AL FAW SIDE - SECTION A - REINFORCEMENT SEGMENTS 1-2-3 (2) 63 KAZ-CO-DD-OC-DW-5149 OPEN CUT UMM QASR SIDE - TYPICAL SECTION A - HORIZONTAL & LONGITUDINAL SECTION

12 KAZ-CO-DD-OC-DW-5218B OPEN CUT AL FAW SIDE - SECTION A - REINFORCEMENT SEGMENTS 1-2-3 (3) 64 KAZ-CO-DD-OC-DW-5150 OPEN CUT UMM QASR SIDE - TYPICAL SECTION A - SEGMENTS 1-2-3

13 KAZ-CO-DD-OC-DW-5115 OPEN CUT AL FAW SIDE - LONGITUDINAL SECTION A - REINFORCEMENT SEGMENTS 1-2-3 (1) 65 KAZ-CO-DD-OC-DW-5151 OPEN CUT UMM QASR SIDE - TYPICAL SECTION A - REINFORCEMENT SEGMENTS 1-2-3 (1)

14 KAZ-CO-DD-OC-DW-5116 OPEN CUT AL FAW SIDE - LONGITUDINAL SECTION A - REINFORCEMENT SEGMENTS 1-2-3 (2) 66 KAZ-CO-DD-OC-DW-5212A OPEN CUT UMM QASR SIDE - SECTION A - REINFORCEMENT SEGMENTS 1-2-3 (2)

15 KAZ-CO-DD-OC-DW-5117 OPEN CUT AL FAW SIDE - LONGITUDINAL SECTION A - REINFORCEMENT SEGMENTS 1-2-3 (3) 67 KAZ-CO-DD-OC-DW-5212B OPEN CUT UMM QASR SIDE - SECTION A - REINFORCEMENT SEGMENTS 1-2-3 (3)

16 KAZ-CO-DD-OC-DW-5118 OPEN CUT AL FAW SIDE - LONGITUDINAL SECTION A - REINFORCEMENT SEGMENTS 1-2-3 (4) 68 KAZ-CO-DD-OC-DW-5152 OPEN CUT UMM QASR SIDE - LONGITUDINAL SECTION A - REINFORCEMENT SEGMENTS 1-2-3 (1)

17 KAZ-CO-DD-OC-DW-5119 OPEN CUT AL FAW SIDE - TYPICAL SECTION B - HORIZONTAL & LONGITUDINAL SECTION 69 KAZ-CO-DD-OC-DW-5153 OPEN CUT UMM QASR SIDE - LONGITUDINAL SECTION A - REINFORCEMENT SEGMENTS 1-2-3 (2)

18 KAZ-CO-DD-OC-DW-5120 OPEN CUT AL FAW SIDE - TYPICAL SECTION B - SEGMENTS 1-2-3 70 KAZ-CO-DD-OC-DW-5154 OPEN CUT UMM QASR SIDE - LONGITUDINAL SECTION A - REINFORCEMENT SEGMENTS 1-2-3 (3)

19 KAZ-CO-DD-OC-DW-5121 OPEN CUT AL FAW SIDE - TYPICAL SECTION B - REINFORCEMENT SEGMENTS 1-2-3 (1) 71 KAZ-CO-DD-OC-DW-5155 OPEN CUT UMM QASR SIDE - LONGITUDINAL SECTION A - REINFORCEMENT SEGMENTS 1-2-3 (4)

20 KAZ-CO-DD-OC-DW-5219 OPEN CUT AL FAW SIDE - SECTION B - REINFORCEMENT SEGMENTS 1-2-3 (2) 72 KAZ-CO-DD-OC-DW-5156 OPEN CUT UMM QASR SIDE - TYPICAL SECTION B - HORIZONTAL & LONGITUDINAL SECTION

21 KAZ-CO-DD-OC-DW-5122 OPEN CUT AL FAW SIDE - LONGITUDINAL SECTION B - REINFORCEMENT SEGMENTS 1-2-3 (1) 73 KAZ-CO-DD-OC-DW-5157 OPEN CUT UMM QASR SIDE - TYPICAL SECTION B - SEGMENTS 1-2-3

22 KAZ-CO-DD-OC-DW-5123 OPEN CUT AL FAW SIDE - LONGITUDINAL SECTION B - REINFORCEMENT SEGMENTS 1-2-3 (2) 74 KAZ-CO-DD-OC-DW-5158 OPEN CUT UMM QASR SIDE - TYPICAL SECTION B - REINFORCEMENT SEGMENTS 1-2-3 (1)

23 KAZ-CO-DD-OC-DW-5124 OPEN CUT AL FAW SIDE - LONGITUDINAL SECTION B - REINFORCEMENT SEGMENTS 1-2-3 (3) 75 KAZ-CO-DD-OC-DW-5213 OPEN CUT UMM QASR SIDE - SECTION B - REINFORCEMENT SEGMENTS 1-2-3 (2)

24 KAZ-CO-DD-OC-DW-5125 OPEN CUT AL FAW SIDE - LONGITUDINAL SECTION B - REINFORCEMENT SEGMENTS 1-2-3 (4) 76 KAZ-CO-DD-OC-DW-5159 OPEN CUT UMM QASR SIDE - LONGITUDINAL SECTION B - REINFORCEMENT SEGMENTS 1-2-3 (1)

25 KAZ-CO-DD-OC-DW-5126 OPEN CUT AL FAW SIDE - TYPICAL SECTION C - HORIZONTAL & LONGITUDINAL SECTION 77 KAZ-CO-DD-OC-DW-5160 OPEN CUT UMM QASR SIDE - LONGITUDINAL SECTION B - REINFORCEMENT SEGMENTS 1-2-3 (2)

26 KAZ-CO-DD-OC-DW-5127 OPEN CUT AL FAW SIDE - TYPICAL SECTION C - SEGMENTS 1-2-3-4 78 KAZ-CO-DD-OC-DW-5161 OPEN CUT UMM QASR SIDE - LONGITUDINAL SECTION B - REINFORCEMENT SEGMENTS 1-2-3 (3)

27 KAZ-CO-DD-OC-DW-5128 OPEN CUT AL FAW SIDE - TYPICAL SECTION C - REINFORCEMENT SEGMENTS 1-2-3-4 (1) 79 KAZ-CO-DD-OC-DW-5162 OPEN CUT UMM QASR SIDE - LONGITUDINAL SECTION B - REINFORCEMENT SEGMENTS 1-2-3 (4)
General Company for Ports of Iraq (GCPI)
28 KAZ-CO-DD-OC-DW-5208 OPEN CUT AL FAW SIDE - SECTION C - REINFORCEMENT SEGMENTS 1-2-3-4 (2) 80 KAZ-CO-DD-OC-DW-5163 OPEN CUT UMM QASR SIDE - TYPICAL SECTION C - HORIZONTAL & LONGITUDINAL SECTION

29 KAZ-CO-DD-OC-DW-5129 OPEN CUT AL FAW SIDE - LONGITUDINAL SECTION C - REINFORCEMENT SEGMENTS 1-2-3-4 (1) 81 KAZ-CO-DD-OC-DW-5164 OPEN CUT UMM QASR SIDE - TYPICAL SECTION C - SEGMENTS 1-2-3-4

30 KAZ-CO-DD-OC-DW-5130 OPEN CUT AL FAW SIDE - LONGITUDINAL SECTION C - REINFORCEMENT SEGMENTS 1-2-3-4 (2) 82 KAZ-CO-DD-OC-DW-5165 OPEN CUT UMM QASR SIDE - TYPICAL SECTION C - REINFORCEMENT SEGMENTS 1-2-3-4 (1)

31 KAZ-CO-DD-OC-DW-5131 OPEN CUT AL FAW SIDE - LONGITUDINAL SECTION C - REINFORCEMENT SEGMENTS 1-2-3-4 (3) 83 KAZ-CO-DD-OC-DW-5214 OPEN CUT UMM QASR SIDE - SECTION C - REINFORCEMENT SEGMENTS 1-2-3-4 (2)
TECHNITAL S.p.A
32 KAZ-CO-DD-OC-DW-5132 OPEN CUT AL FAW SIDE - TYPICAL SECTION D - HORIZONTAL & LONGITUDINAL SECTION 84 KAZ-CO-DD-OC-DW-5166 OPEN CUT UMM QASR SIDE - LONGITUDINAL SECTION C - REINFORCEMENT SEGMENTS 1-2-3-4 (1)

33 KAZ-CO-DD-OC-DW-5133 OPEN CUT AL FAW SIDE - TYPICAL SECTION D - SEGMENT 1 85 KAZ-CO-DD-OC-DW-5167 OPEN CUT UMM QASR SIDE - LONGITUDINAL SECTION C - REINFORCEMENT SEGMENTS 1-2-3-4 (2)

34 KAZ-CO-DD-OC-DW-5134 OPEN CUT AL FAW SIDE - TYPICAL SECTION D - REINFORCEMENT SEGMENT 1 (1) 86 KAZ-CO-DD-OC-DW-5168 OPEN CUT UMM QASR SIDE - LONGITUDINAL SECTION C - REINFORCEMENT SEGMENTS 1-2-3-4 (3)

35 KAZ-CO-DD-OC-DW-5209 OPEN CUT AL FAW SIDE - SECTION D - REINFORCEMENT SEGMENT 1 (2) 87 KAZ-CO-DD-OC-DW-5169 OPEN CUT UMM QASR SIDE - TYPICAL SECTION D - HORIZONTAL & LONGITUDINAL SECTION DAEWOO ENGINEERING &
CONSTRUCTION CO., LTD
36 KAZ-CO-DD-OC-DW-5135 OPEN CUT AL FAW SIDE - LONGITUDINAL SECTION D - REINFORCEMENT SEGMENT 1 (1) 88 KAZ-CO-DD-OC-DW-5170 OPEN CUT UMM QASR SIDE - TYPICAL SECTION D - SEGMENT 1
DESIGN CONSULTANT
37 KAZ-CO-DD-OC-DW-5136 OPEN CUT AL FAW SIDE - LONGITUDINAL SECTION D - REINFORCEMENT SEGMENT 1 (2) 89 KAZ-CO-DD-OC-DW-5171 OPEN CUT UMM QASR SIDE - TYPICAL SECTION D - REINFORCEMENT SEGMENT 1 (1)

38 KAZ-CO-DD-OC-DW-5137 OPEN CUT AL FAW SIDE - LONGITUDINAL SECTION D - REINFORCEMENT SEGMENT 1 (3) 90 KAZ-CO-DD-OC-DW-5215 OPEN CUT UMM QASR SIDE - SECTION D - REINFORCEMENT SEGMENT 1 (2)

39 KAZ-CO-DD-OC-DW-5138 OPEN CUT AL FAW SIDE - TYPICAL SECTION E - HORIZONTAL & LONGITUDINAL SECTION 91 KAZ-CO-DD-OC-DW-5172 OPEN CUT UMM QASR SIDE - LONGITUDINAL SECTION D - REINFORCEMENT SEGMENT 1 (1) 4.0 03-05-23 FOR APPROVAL TBT MCJ VIZE

3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE


40 KAZ-CO-DD-OC-DW-5139 OPEN CUT AL FAW SIDE - TYPICAL SECTION E - SEGMENTS 1-2-3-4 92 KAZ-CO-DD-OC-DW-5173 OPEN CUT UMM QASR SIDE - LONGITUDINAL SECTION D - REINFORCEMENT SEGMENT 1 (2)
2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE


41 KAZ-CO-DD-OC-DW-5140 OPEN CUT AL FAW SIDE - TYPICAL SECTION E - REINFORCEMENT SEGMENTS 1-2-3-4 (1) 93 KAZ-CO-DD-OC-DW-5174 OPEN CUT UMM QASR SIDE - LONGITUDINAL SECTION D - REINFORCEMENT SEGMENT 1 (3)
REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

42 KAZ-CO-DD-OC-DW-5210 OPEN CUT AL FAW SIDE - SECTION E - REINFORCEMENT SEGMENTS 1-2-3-4 (2) 94 KAZ-CO-DD-OC-DW-5175 OPEN CUT UMM QASR SIDE - TYPICAL SECTION E - HORIZONTAL & LONGITUDINAL SECTION

43 KAZ-CO-DD-OC-DW-5141 OPEN CUT AL FAW SIDE - LONGITUDINAL SECTION E - REINFORCEMENT SEGMENTS 1-2-3-4 (1) 95 KAZ-CO-DD-OC-DW-5176 OPEN CUT UMM QASR SIDE - TYPICAL SECTION E - SEGMENTS 1-2-3-4
THE CONSTRUCTION OF THE KHOR AL ZUBAIR
44 KAZ-CO-DD-OC-DW-5142 OPEN CUT AL FAW SIDE - LONGITUDINAL SECTION E - REINFORCEMENT SEGMENTS 1-2-3-4 (2) 96 KAZ-CO-DD-OC-DW-5177 OPEN CUT UMM QASR SIDE - TYPICAL SECTION E - REINFORCEMENT SEGMENTS 1-2-3-4 (1) IMMERSED TUNNEL PROJECT
45 KAZ-CO-DD-OC-DW-5224 OPEN CUT AL FAW SIDE - LONGITUDINAL SECTION E - REINFORCEMENT SEGMENTS 1-2-3-4 (3) 97 KAZ-CO-DD-OC-DW-5216 OPEN CUT UMM QASR SIDE - SECTION E - REINFORCEMENT SEGMENTS 1-2-3-4 (2)
FGP/C-08
46 KAZ-CO-DD-OC-DW-5143 OPEN CUT AL FAW SIDE - TYPICAL SECTION F - HORIZONTAL & LONGITUDINAL SECTION 98 KAZ-CO-DD-OC-DW-5178 OPEN CUT UMM QASR SIDE - LONGITUDINAL SECTION E - REINFORCEMENT SEGMENTS 1-2-3-4 (1)

47 KAZ-CO-DD-OC-DW-5144 OPEN CUT AL FAW SIDE - TYPICAL SECTION F - SEGMENTS 1-2-3-4 99 KAZ-CO-DD-OC-DW-5179 OPEN CUT UMM QASR SIDE - LONGITUDINAL SECTION E - REINFORCEMENT SEGMENTS 1-2-3-4 (2)
OPEN CUT
48 KAZ-CO-DD-OC-DW-5145 OPEN CUT AL FAW SIDE - TYPICAL SECTION F - REINFORCEMENT SEGMENTS 1-2-3-4 (1) 100 KAZ-CO-DD-OC-DW-5226 OPEN CUT UMM QASR SIDE - LONGITUDINAL SECTION E - REINFORCEMENT SEGMENTS 1-2-3-4 (3)
DRAWING LIST
SHEET 1 OF 2
49 KAZ-CO-DD-OC-DW-5211 OPEN CUT AL FAW SIDE - SECTION F - REINFORCEMENT SEGMENTS 1-2-3-4 (2) 101 KAZ-CO-DD-OC-DW-5180 OPEN CUT UMM QASR SIDE - TYPICAL SECTION F - HORIZONTAL & LONGITUDINAL SECTION

50 KAZ-CO-DD-OC-DW-5146 OPEN CUT AL FAW SIDE - LONGITUDINAL SECTION F - REINFORCEMENT SEGMENTS 1-2-3-4 (1) 102 KAZ-CO-DD-OC-DW-5181 OPEN CUT UMM QASR SIDE - TYPICAL SECTION F - SEGMENTS 1-2-3-4

51 KAZ-CO-DD-OC-DW-5147 OPEN CUT AL FAW SIDE - LONGITUDINAL SECTION F - REINFORCEMENT SEGMENTS 1-2-3 (2) 103 KAZ-CO-DD-OC-DW-5182 OPEN CUT UMM QASR SIDE - TYPICAL SECTION F - REINFORCEMENT SEGMENTS 1-2-3-4 (1) COWI JW HUH

52 KAZ-CO-DD-OC-DW-5221 OPEN CUT AL FAW SIDE - LONGITUDINAL SECTION F - REINFORCEMENT SEGMENT 4 (3) 104 KAZ-CO-DD-OC-DW-5217 OPEN CUT UMM QASR SIDE - SECTION F - REINFORCEMENT SEGMENTS 1-2-3-4 (2) JW KIM 4.0

KAZ-CO-DD-OC-DW-5110A
03-05-23
DRAWING LIST NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.
NO. DRAWING. NO. DRAWING TITLE REV 1.0 REV 2.0 REV 3.0 REV 4.0 2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE
DATUM UNLESS STATED OTHERWISE.
105 KAZ-CO-DD-OC-DW-5183 OPEN CUT UMM QASR SIDE - LONGITUDINAL SECTION F - REINFORCEMENT SEGMENTS 1-2-3 (1)
3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL
106 KAZ-CO-DD-OC-DW-5184 OPEN CUT UMM QASR SIDE - LONGITUDINAL SECTION F - REINFORCEMENT SEGMENTS 1-2-3 (2) DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

107 KAZ-CO-DD-OC-DW-5222 OPEN CUT UMM QASR SIDE - LONGITUDINAL SECTION F - REINFORCEMENT SEGMENTS 4 (3) 4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT
SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
108 KAZ-CO-DD-OC-DW-5228 OPEN CUT UMM QASR SIDE - LONGITUDINAL SECTION F - REINFORCEMENT SEGMENTS 4 (4) PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
109 KAZ-CO-DD-OC-DW-5199 OPEN CUT UMM QASR SIDE - SECTION A, B, C, D, E & F - GEOMETRY SHEAR KEYS - BOTTOM SLAB
ENGINEER.

110 KAZ-CO-DD-OC-DW-5200 OPEN CUT UMM QASR SIDE - SECTION A & B - GEOMETRY SHEAR KEYS - OUTER WALL 5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED
AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
111 KAZ-CO-DD-OC-DW-5201 OPEN CUT UMM QASR SIDE - SECTION A & B - GEOMETRY SHEAR KEYS - INNER WALL REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


112 KAZ-CO-DD-OC-DW-5202 OPEN CUT UMM QASR SIDE - SECTION C, D, E & F - GEOMETRY SHEAR KEYS - OUTER WALL PER SUPPLIER'S RECOMMENDATION.

113 KAZ-CO-DD-OC-DW-5203 OPEN CUT UMM QASR SIDE - SECTION A, B, C, D, E & F - REINF. SHEAR KEYS - BOTTOM SLAB

114 KAZ-CO-DD-OC-DW-5204 OPEN CUT UMM QASR SIDE - SECTION A & B - REINFORCEMENT SHEAR KEYS-OUTER, INNER WALL

115 KAZ-CO-DD-OC-DW-5205 OPEN CUT UMM QASR SIDE - SECTION C, D, E & F - REINFORCEMENT SHEAR KEYS - OUTER WALL

116 KAZ-CO-DD-OC-DW-5186 OPEN CUT AL FAW SIDE - SECTION A ARCHITECTURAL PORTAL HORIZONTAL & LONG. SECTION

117 KAZ-CO-DD-OC-DW-5187 OPEN CUT UMM QASR SIDE - SECTION A ARCHITECTURAL PORTAL HORIZONTAL & LONG. SECTION

118 KAZ-CO-DD-OC-DW-5188 OPEN CUT SECTION A - ARCHITECTURAL PORTAL CROSS SECTION & PLAN VIEW

119 KAZ-CO-DD-OC-DW-5189 OPEN CUT SECTION A - ARCHITECTURAL PORTAL DETAILS

120 KAZ-CO-DD-OC-DW-5190 OPEN CUT SECTION A - ARCHITECTURAL PORTAL COLUMN REINFORCEMENT

121 KAZ-CO-DD-OC-DW-5191 OPEN CUT SECTION A - ARCHITECTURAL PORTAL BEAM REINFORCEMENT

122 KAZ-CO-DD-OC-DW-5206 OPEN CUT TYPICAL SECTION AT SEGMENT JOINT AND SHEAR KEYS OUTLINE

123 KAZ-CO-DD-OC-DW-5207 OPEN CUT TYPICAL SECTION AT SEGMENT JOINT AND SHEAR KEYS DETAILS

General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT

4.0 03-05-23 FOR APPROVAL TBT MCJ VIZE

3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE


REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT
DRAWING LIST
SHEET 2 OF 2

COWI JW HUH

JW KIM 4.0

KAZ-CO-DD-OC-DW-5110B
03-05-23
1. PROJECT 6. CONCRETE 7.3 CUTTING AND BENDING NOTES:
ALL REINFORCEMENT SHALL BE BENT IN ACCORDANCE WITH EN1992-1-1 OR AT LEAST: 1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
THE CONSTRUCTION OF THE KHOR AL ZUBAIR IMMERSED TUNNEL PROJECT CONCRETE GRADE C35/C45 METRES UNLESS SHOWN OTHERWISE.
ITEM VALUE - 4 TIMES THE DIAMETER OF THE BENDING BARS LESS THAN OR EQUAL TO 16 mm.
2. DESIGN SPECIFICATIONS 2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE
CHARACTERISTIC CYLINDER STRENGTH, f ck, cyl 35 MPa - 7 TIMES THE DIAMETER OF THE BENDING BARS GREATER THAN 16 mm. DATUM UNLESS STATED OTHERWISE.
PROJECT TECHNICAL SPECIFICATIONS:
DOC. NO. KAZ-CO-DD-IMT-TS-4001 TECHNICAL SPECIFICATIONS - PREAMBLE CHARACTERISTIC CUBE STRENGTH, f ck, cube 45 MPa
DOC. NO. KAZ-CO-DD-IMT-TS-4002 TECHNICAL SPECIFICATIONS - CONCRETE 3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL
CHARACTERISTIC MEAN TENSILE STRENGTH, f ctm 3.2 MPa
DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DOC. NO. KAZ-CO-DD-IMT-TS-4003 TECHNICAL SPECIFICATIONS - STEEL WORKS
CHARACTERISTIC 5% TENSILE STRENGTH, f ctk, 0.05 2.2 MPa
7.4 TOLERANCES DIMENSIONS ONLY - IF IN DOUBT ASK.
DOC. NO. KAZ-CO-DD-IMT-TS-4004 TECHNICAL SPECIFICATIONS - JOINTS
DOC. NO. KAZ-CO-DD-IMT-TS-4005 TECHNICAL SPECIFICATIONS - TRANSPORT AND MODULUS OF ELASTICITY, E cm 34,000 MPa TOLERANCE ON THE DISTANCE (D) BETWEEN REINFORCEMENT BARS:
IMMERSION OF TUNNEL ELEMENTS 4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT
DOC. NO. KAZ-CO-DD-IMT-TS-4006 TECHNICAL SPECIFICATIONS - MISCELLANEOUS WORKS COEFFICIENT OF THERMAL EXPANSION, α 10 x 10 -⁶ per ◦K +/- 1 cm FOR (D) LESS THAN 15 cm SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
AGGREGATE SIZE 32 mm or 25 mm +/- 1.5 cm FOR (D) BETWEEN 15 AND 30 cm PREFERENCE AND TO BE INCORPORATED INTO THE
EUROCODES EN1990 - 1998 +/- 3 cm FOR (D) GREATER THAN 30 cm CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
NOTE: CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
EUROCODES EN 206-1 TOLERANCE ON LENGTH OF BARS: +/- 3 cm EXCEPT WHEN THESE BARS ARE IN A DISCONTINUITY ZONE
PROPERTIES REF. EN 1992 -1-1 Table 3.1 ENGINEER.
(SUPPORT SURFACE, ETC.) WHERE THE TOLERANCE WILL BE +/-1.0 cm.
IRAQ DESIGN MANUAL FOR HIGHWAY ENGINEERING (1982) 5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED
MEAN DENSITY (UNREINFORCED) c = 23.5 kN/m3 TOLERANCE ON CONCRETE COVERING THICKNESS SHALL BE DEFINED DEPENDING ON THE QUALITY
CONTROL LEVEL WHICH WILL BE ADOPTED FOR THE WORKS. THE REFERENCE TOLERANCE VALUE IS AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
ASSUMED VALUES IN CONCRETE DENSITY TO BE CONFIRMED BY MIX TRIAL TESTS DURING REINFORCEMENT.
2.1 GENERAL QUALIFICATION OF CONCRETE AND TO BE ROUTINELY CHECKED DURING PRODUCTION.
+/-10 mm.
WORKMANSHIP AND MATERIALS SHALL BE IN ACCORDANCE WITH THE RELEVANT CURRENT 6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS
CODES INCLUDING ALL AMENDMENTS AND LOCAL STATUTORY AUTHORITIES REGULATIONS PER SUPPLIER'S RECOMMENDATION.
EXCEPT WHERE VARIED BY THE DRAWINGS AND/OR SPECIFICATIONS.

THE CONTRACTOR MAY SUBSTITUTE AN EQUIVALENT FOR A PROPRIETARY SYSTEM SPECIFIED 6.1 SPACERS
IF APPROVED IN WRITING BY THE DESIGNER AND ENGINEER BEFORE ITS USE. ANY SUBSTITUTE
7.5 NOTATION FOR REINFORCEMENT BARS
SPACERS SHALL BE CEMENTITIOUS AND HAVE A COMPRESSIVE STRENGTH AND DURABILITY NOT LESS THAN THAT
SHALL HAVE A PROVEN TRACK RECORD OF EQUIVALENT PERFORMANCE. OF THE CONCRETE IN WHICH THEY ARE EMBEDDED.
6∅16s200 1
THE CONTRACTOR SHALL CONSTRUCT THE STRUCTURES ACCORDING TO THE DESIGN 6.2 BALLAST CONCRETE AND BLINDING
DOCUMENTATION. WHERE THERE ARE AMBIGUITIES OR OMISSIONS IN THE DRAWING OR BAR MARK
SPECIFICATIONS, THE CONTRACTOR SHALL REFER TO THE ENGINEER. BALLAST CONCRETE AND BLINDING CONCRETE SHALL HAVE A MINIMUM CONCRETE STRENGTH OF fck, cyl = 25 MPa
BAR SPACING
BAR SIZE
2.2 DESIGN LIFE
NO. OF BARS
THE DESIGN LIFE AND THE SERVICE LIFE FOR THE PERMANENT TUNNEL STRUCTURE SHALL BE 100 6.3 ENVIRONMENTAL CLASSES, CONCRETE COVER AND CRACK WIDTHS
YEARS.
STRUCTURE ITEM POSITION EXPOSURE CLASS COVER cnom 2) CRACK WIDTH w max STRENGTH CLASS 7.6 MINIMUM ANCHORAGE LENGTH AND LAP LENGTH
3. COORDINATION
IMMERSED TUNNEL OUTSIDE XS3 75 mm 1) BAR DIAMETER LAP LENGTH [mm] ANCHORAGE LENGTH
ALL DRAWINGS SHALL BE READ IN CONJUNCTION WITH OTHER RELEVANT STRUCTURAL,
DRAINAGE, MEP AND ALL RELEVANT SECTIONS IN THE DESIGN SPECIFICATIONS MENTIONED CUT & COVER 0.20 mm C35/45 MPa C35/C45, cd =60 mm, f yk = 500MPa [mm] PERCENTAGE OF LAP [%] [mm]
ABOVE. TUNNEL RAMP INSIDE XS2 60 mm 1) 50 100

THE DRAWINGS SHALL BE READ IN CONJUNCTION WITH RELATED REPORTS, DESIGNER'S GOOD BOND CONDITION η 1 = 1.0 12 550 600 400
TUNNEL OUTSIDE XS3 75 mm 1)
REQUIREMENTS, QUALITY ASSURANCE DOCUMENTATION AND WITH OTHER SUCH WRITTEN 16 750 800 550
INSTRUCTIONS AS MAY BE ISSUED DURING THE COURSE OF THE PROJECT. ARCHITECTURAL 0.20 mm C35/45 MPa
PORTAL INSIDE XS2 60 mm 1) 20 950 1000 650
PERMANENT STRUCTURE DRAWINGS SHALL BE READ IN CONJUNCTION WITH OTHER DESIGN 25 1150 1250 850
DISCIPLINE / TRADE DRAWINGS. NOTE:
1) THE APPLIED COVERS ARE EQUAL OR EXCEED THE MINIMUM COVERS AS PER ER 32 1500 1550 1050
ALL LEVELS AND SETTING-OUT DATA SHALL BE CONFIRMED PRIOR TO EXECUTION. 36 1750 1850 1250
Cnom = (ALSO USED IN FORMAL CRACK WIDTH CALCULATION) ≥ Cmin + ΔCdev = 50 mm + 10 mm = 60 mm
DIMENSIONS RELEVANT TO SETTING-OUT SHALL BE VERIFIED BY THE CONTRACTOR BEFORE POOR BOND CONDITION η 1 = 0.7 12 800 850 600
CONSTRUCTION AND FABRICATION COMMENCES. Cmin = ER DOC. NO. 02_ME040F-T-F-Z-I-F-0011-C01 cl. 5.4.2.2 - TABLE 5.2 16 1050 1150 750
THE GENERAL NOTES DRAWINGS CONTAIN ONLY GENERAL NOTES. ADDITIONAL NOTES SPECIFIC ΔCdev = 10mm FOR IN-SITU CAST CONCRETE 20 1350 1400 950
TO PARTICULAR ELEMENTS OF WORK ARE SHOWN ON THE RELEVANT DRAWINGS. 25 1650 1750 1200
ΔCdev = 5mm FOR PRECAST CONCRETE ELEMENTS
32 2100 2250 1500
4. SETTING-OUT AND DIMENSIONS 2) FOR STAINLESS STEEL REBAR THE NOMINAL CONCRETE COVER IS REDUCED TO = 30 mm + 10 mm = 40 mm 36 2450 2600 1750
KHOR AL ZUBAIR COORDINATES AND DATUM IS UTM (Universal Transverse Mercator) PROJECTION
COORDINATE SYSTEM (WGS84 Datum), ZONE 39R.
6.4 CHAMFER 7.7 MECHANICAL COUPLERS
SEABED SHALL BE REFERRED TO THE AL FAW GRAND PORT (AFGP) DATUM.
UNLESS OTHERWISE NOTED ALL OUTWARD CORNERS SHALL HAVE CHAMFERS. MECHANICAL COUPLERS FOR REINFORCING BAR LOAD TRANSFER IN TENSION-COMPRESSION SHALL BE
ALL DIMENSIONS SHOWN ON THE DRAWINGS ARE IN MILLIMETERS UNLESS OTHERWISE NOTED. SELECTED AMONG APPROPRIATE TYPES AVAILABLE. THE COUPLERS SHALL ACHIEVE FAILURE LOADS IN
EXCESS OF 115% OF THE CHARACTERISTIC STRENGTH OF REINFORCING BAR BEING COUPLED.
6.5 JOINTS
ALL ANGLES ARE GIVEN IN DEGREES (0-360°) UNLESS OTHERWISE NOTED.
ALL CONSTRUCTION JOINTS AND EXPANSION JOINTS SHALL BE PLACED AS SHOWN ON THE DRAWINGS, AS PER COUPLER FOR STAINLESS STEEL REINFORCING BAR SHALL BE IN STAINLESS STEEL WITH EQUIVALENT OR
CHAINAGES ARE GIVEN IN KM+M THE TECHNICAL SPECIFICATIONS OR AS APPROVED BY THE ENGINEER. BETTER CORROSION RESISTANCE.
General Company for Ports of Iraq (GCPI)
NO DIMENSIONS TO BE OBTAINED BY SCALING ON THE DRAWINGS. EXPANSION JOINTS AND MOVEMENT JOINTS AND INSTALLATION THEREOF SHALL BE IN ACCORDANCE WITH THE
MANUFACTURER'S RECOMMENDATIONS. 7.8 HEADED REINFORCEMENT
THE CONTRACTOR SHALL CHECK ALL DRAWINGS TO VERIFY DIMENSIONS, LEVELS AND STATIONS HEADED REINFORCEMENT TO BE USED ONLY WHERE SHOWN ON THE DRAWINGS OR OTHERWISE AGREED
PRIOR TO CONSTRUCTION AND REPORT ANY DISCREPANCIES TO THE ENGINEER. INTERNAL WATERSTOPS IN SEGMENT JOINTS TO BE PROVIDED AS A DOUBLE-INJECTABLE SYSTEM.
WITH THE ENGINEER.
LHS AND RHS REFER TO THE LEFT HAND SIDE AND RIGHT HAND SIDE, RESPECTIVELY, WHEN CONSTRUCTION JOINTS TO BE PROVIDED WITH A SINGLE INJECTABLE WATERSTOP.
HEADED REINFORCEMENT SHALL HAVE PROPERTIES EQUIVALENT OR BETTER THAN NON-HEADED STEEL
LOOKING ALONG THE CHAINAGE AND IN THE DIRECTION OF INCREASING CHAINAGE. REINFORCEMENT.
HORIZONTAL CONSTRUCTION JOINTS BETWEEN BOTTOM SLAB AND WALLS ARE TO BE RAISED BY A KICKER 150
MM ABOVE THE TOP OF THE HAUNCH IN THE BOTTOM SLAB.
5. ABBREVIATIONS: TECHNITAL S.p.A
AASHTO AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS 6.6 FINISHING 7.9 SPLICING AND LAPPING OF REINFORCEMENT
ALL CONCRETE SURFACES SHALL HAVE A SMOOTH SURFACE FINISH. SPLICES, WHERE PERMITTED, SHALL BE STAGGERED. FOR LAPPED SPLICES, BARS SHALL BE PLACED IN
AFGP AL FAW GRAND PORT
CONTACT AND WIRED TOGETHER WHILE MAINTAINING THE MINIMUM REQUIRED CLEAR DISTANCE TO
ARCHITECTURAL FINISHES ARE NOT ENVISAGED. OTHER BARS AND THE REQUIRED MINIMUM DISTANCE TO THE SURFACE OF THE CONCRETE.
ALS ACCIDENTAL LIMIT STATE

C&C CUT & COVER TUNNEL 6.7 WATERPROOFING


7.10 BAR SPACING FOR CONCRETING DAEWOO ENGINEERING &
CD CHART DATUM WATERPROOFING AND INSTALLATION THEREOF SHALL BE IN ACCORDANCE WITH THE MANUFACTURER'S
RECOMMENDATIONS. THE TOTAL REBAR AREAS REQUIRED PER RUNNING METER AS PER THE DETAILED DESIGN DRAWINGS MUST BE
CONSTRUCTION CO., LTD
CJ CONSTRUCTION JOINT MAINTAINED AT ALL TIMES. HOWEVER, THE CONTRACTOR MAY SHIFT OR SUBSTITUTE REBARS IN THE LONGITUDINAL
TUNNEL PART WALLS + BOTTOM SLAB SIDES + TOP SLAB BOTTOM SLAB SOFFIT DIRECTION IF IT IS DEEMED PREFERABLE FOR POURING AND VIBRATING OF CONCRETE. DESIGN CONSULTANT
CL CENTRE LINE IMMERSED TUNNEL NONE NONE
THE PRINCIPLE OF LONGITUDINAL REBAR MODIFICATION IS INDICATED BELOW.
IJ IMMERSION JOINT CUT & COVER TUNNEL SPRAYED MEMBRANE SHEET MEMBRANE
OPEN CUT SECTION SPRAYED MEMBRANE SHEET MEMBRANE
IMT IMMERSED TUNNEL LONGITUDINAL BARS ∅ 25/140
FOR MEMBRANE REQUIREMENTS PLEASE REFER TO TECHNICAL SPECIFICATIONS - ∅ 25 ∅ 25 ∅ 25 ∅ 25 ∅ 25 ∅ 25 ∅ 25 ∅ 25 ∅ 25 ∅ 25 ∅ 25
KAZ KHOR AL ZUBAIR MISCELLANEOUS WORKS, CL 3.7 WATERPROOFING MEMBRANE 3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

LONGITUDINAL BARS ∅ 25/140 - USE ∅ 36 AS SPACER 2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE
MSL MEAN SEA LEVEL
∅ 36 ∅16 ∅ 25 ∅ 25 ∅ 25 ∅ 25 ∅ 25 ∅ 25 ∅ 25 ∅16 ∅ 36 1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE
R.A. ROAD ALIGNMENT
LONGITUDINAL BARS ∅ 25/140 - USE ∅ 36 AS SPACER REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

UTM UNIVERSAL TRANSVERSE MERCATOR ∅ 36 ∅ 36 LONGITUDINAL IN 2 LAYERS


∅16 ∅ 25 ∅ 25 ∅ 25 ∅ 25 ∅ 25 ∅ 25 ∅ 25 ∅16
7. STEEL REINFORCEMENT
T.A. TUNNEL ALIGNMENT LONGITUDINAL BARS ∅ 25/140 - USE ∅ 36 AS SPACER
LONGITUDINAL IN 2 LAYERS
R.A. ROAD ALIGNMENT 7.1 CARBON STEEL ∅ 36 ∅16 ∅ 25 ∅ 25 ∅16 ∅16 ∅ 25 ∅ 25 ∅16 ∅ 36 THE CONSTRUCTION OF THE KHOR AL ZUBAIR
TYP TYPICAL CARBON STEEL REINFORCEMENT SHALL BE CLASS B OR C ACCORDING TO EN1992-1-1:2004, ANNEX C, LONGITUDINAL BARS ∅ 25/140 - USE ∅ 32 AS SPACER IMMERSED TUNNEL PROJECT
UNLESS OTHERWISE SHOWN ON THE DRAWINGS. ∅ 32 ∅ 20 ∅ 25 ∅ 25 ∅ 25 ∅ 25 ∅ 25 ∅ 25 ∅ 25 ∅ 20 ∅ 32
HAT HIGHEST ASTRONOMICAL TIDE
LONGITUDINAL BARS ∅ 25/140 - USE ∅ 32 AS SPACER
LAT LOWEST ASTRONOMICAL TIDE ITEM VALUE LONGITUDINAL IN 2 LAYERS FGP/C-08
CHARACTERISTIC YIELD STRENGTH, f yk 500 MPa ∅ 32 ∅ 20 ∅ 25 ∅ 25 ∅ 20 ∅ 20 ∅ 25 ∅ 20 ∅ 20 ∅ 32
EGL EXISTING GROUND LEVEL
MODULUS OF ELASTICITY, E 200,000 MPa
GRADE B500 B OR C AND COMPLY WITH EN 10080 AND BS 4449 + AMENDMENT 2
LONGITUDINAL BARS ∅16/140 OPEN CUT
AS PER EN 10080 AND BS 4449 + AMENDMENT 2, TAG WELDING TO STEEL REINFORCEMENT B500 B IS ALLOWED.
∅16 ∅16 ∅16 ∅16 ∅16 ∅16 ∅16 ∅16 ∅16 ∅16 ∅16 GENERAL NOTES
LONGITUDINAL BARS ∅16/140 - USE ∅ 32 AS SPACER
7.2 STAINLESS STEEL ∅ 32 ∅16 ∅16 ∅16 ∅16 ∅16 ∅16 ∅ 32
STAINLESS STEEL REINFORCEMENT, WHERE REQUIRED, SHALL BE OF TYPE AISI 316 L (1.4404, 1.4435 OR LONGITUDINAL BARS ∅16/140 - USE ∅ 36 AS SPACER
1.4432 ACCORDING TO EN 10088), GRADE 500 IN COMPLIANCE WITH BS 6744. ∅ 36 ∅ 36 ∅ 36
COWI JW HUH
CARBON AND STAINLESS STEEL CAN BE MIXED IN THE SAME STRUCTURAL ELEMENT AND SHALL BE
ELECTRICALLY ISOLATED.
JW KIM 3.0

KAZ-CO-DD-OC-DW-5111
17-02-23
8. PRESTRESSING 9. STRUCTURAL STEEL 14. LOCKING FILL, BACKFILL AND ROCK PROTECTION NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
THE PRESTRESSING STRANDS SHALL BE CLASS 2 STRANDS ACCORDING TO EN 10138. THE STEEL GRADES TO BE USED FOR STRUCTURAL STEEL IN ACCORDANCE WITH EN 10025 PART 1 TO 6. ALL SPECIFIED MATERIAL PROPERTIES ARE IN-SITU PROPERTIES AFTER PLACEMENT.
METRES UNLESS SHOWN OTHERWISE.

8.1 PROPERTIES 9.1 PROPERTIES 14.1 LOCKING FILL AND BACK FILL 2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE
DATUM UNLESS STATED OTHERWISE.
ITEM VALUE ITEM VALUE MINIMUM UNIT WEIGHT (SATURATED) 20.2 kN/m3
sat
THE ULTIMATE TENSILE STRENGTH SHALL BE MINIMUM, fy 1860 MPa MODULUS OF ELASTICITY, E s 210.000 MPa MINIMUM FRICTION ANGLE ' 35 deg. 3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL
DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
RATIO OF TENSILE STRENGTH TO PROOF STRENGTH 1.16 POISSONS RATIO, 0.3 MINIMUM STIFFNESS E 10 MPa DIMENSIONS ONLY - IF IN DOUBT ASK.
THE ELONGATION AT MAXIMUM LOAD SHALL BE MINIMUM, εu 3.5% COEFFICIENT OF THERMAL EXPANSION, α 12 x 10 -⁶ per ◦K
THE SIZE SHALL 15.7 mm NOMINAL DIAMETER SEVEN-WIRE 150 mm² 4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT
14.2 ROCK PROTECTION SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
STRAND WITH NOMINAL STRAND AREA, A
9.2 GRADES OUTER LAYER - ROCK ARMOUR
PREFERENCE AND TO BE INCORPORATED INTO THE
MODULUS OF ELASTICITY, Ep 195,000 MPa CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
MINIMUM CONCRETE CYLINDER STRENGTH AT TENSIONING, f ck 35.0 MPa ITEM GRADES AND SPECIFICATION 5) MINIMUM UNIT WEIGHT (DRY) dry 19.9 kN/m 3 CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
SAFETY BARRIERS AND RAILINGS GRADES S355 J0 ACCORDING TO EN 10025-2 4) ENGINEER.
MINIMUM UNIT WEIGHT (SATURATED) sat 22.7 kN/m3
8.2 FRICTION AND WOBBLE PLATES, t ≤ 60mm 1) GRADES S355 J0 ACCORDING TO EN 10025-2 4) MINIMUM FRICTION ANGLE ' 45 deg. 5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED
PLATES, 60mm < t ≤ 85mm 1) GRADES S355 N ACCORDING TO EN 10025-3 4) AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
ITEM VALUE REINFORCEMENT.
PLATES, 85mm < t 1) GRADES S355 ML ACCORDING TO EN 10025-3 4)
FRICTION COEFFICIENT, μ 0.15 rad-1 UNDER LAYER
PLATES, t ≤ 60mm 2) GRADES S460 M ACCORDING TO EN 10025-4 4) 6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS
WOBBLE COEFFICIENT, k 0.007rad/m MINIMUM UNIT WEIGHT (DRY) dry 17.3 kN/m 3
2) PER SUPPLIER'S RECOMMENDATION.
PLATES, 60mm < t GRADES S460 ML ACCORDING TO EN 10025-4 4) MINIMUM UNIT WEIGHT (SATURATED) 20.7 kN/m3
WEDGE DRAW-IN: 6 mm sat
TUBES 1) GRADES S355 J2H ACCORDING TO EN 10210-1 4)
NOTE: MINIMUM FRICTION ANGLE ' 40 deg.
DATA GIVEN IN ETA FOR SELECTED SUPPLIER OF POST- TENSIONING TUBES 1) GRADES S460 NLH ACCORDING TO EN 10210-1 4)
SYSTEM SHALL BE ADOPTED IN DETAILED DESIGN.
SECONDARY STRUCTURE 3) GRADES S275 J0 ACCORDING TO EN 10025-2 4)
14.3 CONSTRUCTION
NOTE:
1) TEMPORARY STEEL
8.3 DUCTS 14.3.1 BACKFILLING
METAL DUCTS SHALL BE GALVANIZED FERROUS METAL AND SHALL BE FABRICATED WITH 2) PERMANENT STEEL THE WORK METHOD USED FOR BACKFILLING SHALL TAKE INTO ACCOUNT THE HORIZONTAL
EITHER WELDED OR INTERLOCKED SEAMS WITH MINIMUM WALL THICKNESS OF 0.60 mm. STABILITY OF THE ELEMENTS. THE FILLING ON THE TWO SIDES OF THE TUNNEL SHALL BE
3) OTHER THAN SAFETY BARRIERS AND RAILINGS (LIFTING LUGS, SPACERS, ETC.) CARRIED OUT IN A BALANCED MANNER. THE DIFFERENCE IN FILLING LEVEL ON THE TWO
POLYETHYLENE OR POLYPROPYLENE DUCTS IF USED MUST HAVE A MINIMUM NOMINAL WALL SIDES OF THE TUNNEL SHALL AT NO STAGE EXCEED 2 m THE PLACING SHALL BE SUCH THAT
THICKNESS OF 2.0 MM. POLYETHYLENE DUCTS SHALL BE FABRICATED FROM RESINS 4) STAINLESS STEEL ACCORDING TO EN 10088. NO DAMAGE IS CAUSED TO THE TUNNEL CONCRETE AND JOINTS.
MEETING OR EXCEEDING THE REQUIREMENTS OF ASTM D3350 WITH A CELL CLASSIFICATION
OF 345364A. 5) UNLESS STATED OTHERWISE ON SPECIFIC DRAWINGS. 14.3.2 REINFORCEMENT
POLYPROPYLENE DUCTS SHALL BE FABRICATED FROM RESINS MEETING OR EXCEEDING THE A GENERAL ALLOWANCE FOR LOCAL SHIFTING AND CUTTING OF REINFORCEMENT IS
REQUIREMENTS OF ASTM D4101 WITH CELL CLASSIFICATION RANGE OF PP0349B44544 TO 9.3 TOLERANCES ACCEPTABLE TO CATER FOR TREMMIE CONCRETING (TYP Ø200), SANDFLOW PIPES (TYP
PP0340B65884. Ø200), LIFTING ANCHORS, MOORING AND BOLLARD ANCHORS, SURVEY TOWER ANCHORS
TOLERANCES IN ACCORDANCE WITH ISO 2768-m AND ACCESS TOWER AND OTHER TEMPORARY INSTALLATIONS PROVIDED THAT
COUPLINGS AND TRANSITION FITTINGS FOR DUCTS SHALL BE OF EITHER FERROUS METAL SUPPLEMENTARY AND COMPENSATING REINFORCEMENT IS INSTALLED IN AGREEMENT
OR POLYETHYLENE. THE MATERIAL SHALL FULFIL THE SPECIFICATION ABOVE. 9.4 WELDING OF STRUCTURAL STEEL WITH THE SITE SUPERVISION TEAM.

WELDING SYMBOLS ARE IN ACCORDANCE WITH EN ISO 2553 SYSTEM A. THE SPACE OF REINFORCEMENT STEEL BAR CAN BE ADJUSTED WHEN INTERFERED WITH
8.4 GROUTING EMBEDDED ITEMS SUCH AS ANCHORS, PIPES AND SMALL RECESSES. HOWEVER, THE NUMBER
DIMENSIONS OF FILLET WELDS ARE THROAT THICKNESS UNLESS NOTED OF TOTAL REINFORCEMENT STEEL BARS SHOULD NOT BE CHANGED; NO OMISSION, NO
ALL POST TENSIONING TENDONS SHALL BE PROTECTED WITH PERMANENT GROUT CAPS OTHERWISE, AND WITH DIMENSION A = 4 mm UNLESS SPECIFIED OTHERWISE.
CUTTING, WHILE THE LOCATION OF THE BAR AND THE LAP SPLICE OF THE BARS CAN BE
AND FILLED WITH GROUT. ADJSUTED TO SECURE THE SPACE FOR EMBEDEDD ITEMS.
BUTT WELDS SHALL BE FULL PENETRATION BUTT WELDS UNLESS SPECIFIED
OTHERWISE.
IN CASE OF CONCRETE-POURING PIPES OR DUCT OF PT, THE CONCEPT INDICATED BELOW CAN
BE APPLIED
10. FASTENERS
STEEL FASTENERS SHALL BE BASED ON THE EUROPEAN TECHNICAL ASSESSMENT OF THE SUPPLIERS IN DETAIL FOR CONCRETE-POURING PIPE OR PT DUCT
AGREEMENT WITH THE CONTRACT REQUIREMENTS.

10.1 BOLTS, NUTS AND WAHSHERS 205

Distribution
Distribution
Bar Lap

Bar Lap
BOLTS SHALL BE HOT DIP GALVANISED HIGH STRENGTH STEEL BOLTS, QUALITY 8.8 ACCORDANCE WITH EN 20898. IF 155
STAINLESS STEEL BOLTS ARE SPECIFIED, THEY SHALL BE DELIVERED IN QUALITY A4-70 (ISO 3506) OR AISI 316L.

BOLTS, NUTS AND WASHERS SHALL COMPLY WITH EN ISO 3506.

180
11. CORROSION PROTECTION Main
Bar Lap General Company for Ports of Iraq (GCPI)
THE STRUCTURAL STEEL ELEMENTS SHALL BE PAINTED ON THE OUTSIDE SURFACES WITH A SYSTEM THAT MEETS THE
REQUIREMENTS WITH ATMOSPHERIC ENVIRONMENT CLASS C5-M VERY HIGH (MARINE) WITH HIGH EXPECTED
DURABILITY. PLEASE ALSO REFER TO TECHNICAL SPECIFICATIONS FOR STEEL WORKS - 3.14.2 COATING SYSTEMS.

214
182

150
ITEMS TO BE HOT DIP GALVANIZED SHALL BE IN ACCORDANCE WITH EN 1461 WITH MINIMUM MEAN ZINC THICKNESS OF
500 MICRON. Ø180mm
CORROSION ALLOWANCE NOT LESS THAN 3.5 mm DURING THE SERVICE LIFE.

12. EXECUTION CLASS TECHNITAL S.p.A


Main
STEEL END FRAMES OF CONCRETE IMMERSED TUNNEL TO BE IN EXECUTION CLASS EXC3.
Bar Lap
ALL OTHER STEEL STRUCTURAL ELEMENTS (E.G. TEMPORARY ELEMENTS SUCH AS BULKHEADS, BALLAST TANKS,
ACCESS SHAFTS AND EMBEDDED PLATES) TO BE IN EXECUTION CLASS EXC2.

13. CONCRETE TOLERANCES DAEWOO ENGINEERING &


IN CASE THE SPACE BETWEEN SHIFTED BARS ARE RELATIVELY LARGE LIKE SAND FLOW
CONSTRUCTION CO., LTD
STRUCTURE TOLERANCE (mm)
PIPES, ADDITIONAL BAR CAN BE CONSIDERED IN THE ENLARGED SPACE AS INDICATED
BOTTOM SLAB, UNDER SIDE +5 mm / -15 mm BELOW DESIGN CONSULTANT

BOTTOM SLAB, UPPER SIDE +15 mm / -5 mm


BOTTOM SLAB, THICKNESS +30 mm / -10 mm
WALLS, INTERNAL AND EXTERNAL +/- 5 mm
PLAN VIEW OF INLET OF SAND FLOW PIPE AT TOE
TOP SLAB, UPPER SIDE +15 mm / -5 mm
TOP SLAB, UNDER SIDE +/- 5 mm
317 3.0 17-02-23 ISSUED FOR REVIEW TBT MCJ VIZE
TOP SLAB, THICKNESS +20 mm / -10 mm
LENGTH OF IMMERSED TUNNEL ELEMENT +/- 20 mm 150 67 30 225 30 66 150 2.0 09-11-22 ISSUED FOR REVIEW TBT MCJ VIZE

REV. DATE REVISION DETAILS DRAWN CHKD. APPD.


LENGTH OF INDIVIDUAL TUNNEL SEGMENT (PRECAST AND CAST-IN- +/- 10 mm
PLACE STRUCTURE
PLACING OF HOLES, BLOCK OUTS, CAST-IN ITEMS ETC. +/- 10 mm 30
CAST-IN ANCHOR BOLTS WITHIN GROUP OF ANCHOR BOLTS +/- 2 mm
THE CONSTRUCTION OF THE KHOR AL ZUBAIR
500

DEVIATION OF SURFACES AND EDGES OVER A LENGTH OF 3m +/- 5 mm


Additional IMMERSED TUNNEL PROJECT
310
225

DEVIATION OF SURFACES AND EDGES OVER A LENGTH OF 10m +/- 10 mm Ø225mm Bar-D20
DEFLECTION OF FORMWORKS BETWEEN SUPPORTS 1/400 OF SPAN
30

FGP/C-08

Distribution Distribution
Bar Lap Bar Lap OPEN CUT
GENERAL NOTES (2)
Bar Lap

Bar Lap
Main

Main
COWI JW HUH

The reinforcement may be shifted Additional


Bar-D20 JW KIM 3.0
where a sand flow pipe is located.

KAZ-CO-DD-OC-DW-5220A
17-02-23
14.3.2 REINFORCEMENT CONT'D 15. ASPHALT NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
PLAN VIEW OF OUTLET SAND FLOW PIPE AT THE BOTTOM SLAB SOFFIT MINIMUM UNIT WEIGHT 22.66 kN/m3 METRES UNLESS SHOWN OTHERWISE.

16. NEW JERSEY BARRIER 2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE
DATUM UNLESS STATED OTHERWISE.

Distribution

Distribution
Bar Lap

Bar Lap
140 55 310 55 140 AVERAGE UNIT WEIGHT 7 kN/m 3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL
Main DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
260 Bar Lap DIMENSIONS ONLY - IF IN DOUBT ASK.
17. CATHODIC PROTECTION
FOR IMPLEMENTATION OF CATHODIC PROTECTION SYSTEM REFER TO 4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT

67 150
SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
285 PREFERENCE AND TO BE INCORPORATED INTO THE
KAZ-SG-DD-MEP-DW-7001-7009 – DRAWINGS OF CATHODIC PROTECTION SYSTEM
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.
18. CONSTRUCTION PROCEDURE
5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED
1. EXCAVATION UNTIL BOTTOM SLAB ELEVATION

253
285

317
Ø225mm Additional 2. FOUNDATION SOIL IMPROVEMENT
AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
Bar-D20 3. LEAN CONCRETE
REINFORCEMENT.
4. CONSTRUCTION OF BOTTOM SLAB. CONSTRUCTION JOINTS SHALL BE RAISED BY A
6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS
KICKER 150 MM ABOVE THE TOP OF THE SLAB
PER SUPPLIER'S RECOMMENDATION.

150 66
5. CONSTRUCTION OF WALLS
6. PLACING OF BACKFILL ABOVE TOES
7. POURING BALLAST CONCRETE OVER BOTTOM SLAB AND INSIDE THE GALLERY

CONTRACTOR SHALL MAINTAIN THE PUMPING UNTIL ALL BACKFILL AND BALLAST
CONCRETE IS PLACED.
Main
Bar Lap

Additional LEGEND
Bar-D20
STRUCTURAL CONCRETE - PRECAST

STRUCTURAL CONCRETE - IN SITU

SIDE VIEW OF SAND FLOW PIPE FOR VERTICAL REBARS OF WALLS


STEEL

WOOD

150 150 150 COMPRESSIBLE MATERIAL

ARMOUR LAYER

QUARRY RUN

BEDDING LAYER

FILTER LAYER

REPLACEMENT FILL

BALLAST CONCRETE General Company for Ports of Iraq (GCPI)

SELECTED FILL

SOIL IMPROVEMENT
400

400

+0.19 (MSL)
MEAN SEA LEVEL
TECHNITAL S.p.A

EXISTING GROUND

MSL

DAEWOO ENGINEERING &


EXCAVATED GROUND LEVEL CONSTRUCTION CO., LTD
75 300 75 SLOPE DESIGN CONSULTANT

GEO TEXTILE

CONSTRUCTION JOINT

3.0 17-02-23 ISSUED FOR REVIEW TBT MCJ VIZE

2.0 09-11-22 ISSUED FOR REVIEW TBT MCJ VIZE

REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT
GENERAL NOTES (3)

COWI JW HUH

JW KIM 3.0

KAZ-CO-DD-OC-DW-5220B
17-02-23
NOTE 1: NOTES:
FOR WALL REINF. REFER
DRAWINGS INDICATED IN NOTE 1 · SECTION A: KAZ-CO-DD-OC-DW-5114 1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
· SECTION B: KAZ-CO-DD-OC-DW-5121 METRES UNLESS SHOWN OTHERWISE.
B ADDITIONAL ø20s140 NF3/FF3
(EXTEND 2m ON EACH SIDE BEYOND OPENINGS) · SECTION C: KAZ-CO-DD-OC-DW-5128

2.000‍
- 2x5ø25 2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE
· SECTION D: KAZ-CO-DD-OC-DW-5134
ø25s150 · SECTION E: KAZ-CO-DD-OC-DW-5140 DATUM UNLESS STATED OTHERWISE.

0.650
(TYP)
0.650
(TYP) · SECTION F: KAZ-CO-DD-OC-DW-5145
3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL
5ø25 5ø25 DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
C DIMENSIONS ONLY - IF IN DOUBT ASK.
5ø16 AT 45⁰ FOR INNER WALL REINF. REFER - 4ø25
5ø16 AT 45⁰
DRAWINGS INDICATED IN NOTE 1 4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT
SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
0.
55 PREFERENCE AND TO BE INCORPORATED INTO THE

ø25s150
0( CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
TYP
) FOR INNER WALL REINF. REFER CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
DRAWINGS INDICATED IN NOTE 1 ENGINEER.

A 5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED

650 (TYP)
- AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
0.400 ø16s100 REINFORCEMENT.
(TYP) 650
ø25s150 ø25s150 (TYP)
4ø25 6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS
5ø25 5ø25 PER SUPPLIER'S RECOMMENDATION.
4ø16 AT 45⁰ 4ø16 AT 45⁰

ø16s100
ø25s150 ø25s150 4ø25 4ø25

ø16s100 ø16s100
5ø16 AT 45⁰ D
5ø16 AT 45⁰ 400
5ø25 (TYP)

ø16s100
5ø25
ø25s150

ADDITIONAL ø20s140 NF3/FF3


LEGEND:
2x5ø25
(EXTEND 2m ON EACH SIDE BEYOND OPENINGS)
4ø16 AT 45⁰ 4ø16 AT 45⁰ STRUCTURAL CONCRETE - PRECAST
4ø25
ø25s150
BALLAST CONCRETE
FOR WALL REINF. REFER
DWG. KAZ-CO-DD-CCT-DW-4614

(TYP)
ø16s100

650
FIRE BOARD

(T 550
WATERSTOP

)
YP
STRUCTURAL CONCRETE - IN SITU

CONSTRUCTION JOINT
4ø25

B SECTION
- SCALE 1:25 C SECTION - TYP. INNER WALL NICHE OPENING - REINFORCEMENT DETAIL
- SCALE 1 : 20 - SCALE 1:20

ø20s150

400 (TYP)
- TYP. WALL OPENING - REINFORCEMENT DETAIL FOR INNER WALL REINF. REFER ø25s150
- SCALE 1:25 DRAWINGS INDICATED IN NOTE 1
General Company for Ports of Iraq (GCPI)
650 (TYP)

650 (TYP)

TECHNITAL S.p.A
FOR WALL REINF. REFER ø25s150 ø25s150
DRAWINGS INDICATED IN NOTE 1 4ø25 4ø25 ø16s100 4ø25 ø25s150 4ø25 ø16s100
5ø25 5ø25 ø20s100

ø25s150 ø25s150 F SECTION D SECTION


- SCALE 1 : 20
- SCALE 1 : 20
DAEWOO ENGINEERING &
CONSTRUCTION CO., LTD
E
DESIGN CONSULTANT
-
4ø25 ø25s150

FOR WALL REINF. REFER FOR WALL REINF. REFER FOR WALL REINF. REFER
DRAWINGS INDICATED IN NOTE 1 DRAWINGS INDICATED IN NOTE 1 DRAWINGS INDICATED IN NOTE 1
FOR WALL REINF. REFER
DRAWINGS INDICATED IN NOTE 1

0.650(TYP)
2.0 03-05-23 FOR APPROVAL TBT MCJ VIZE

A SECTION 4ø25
ø25s150 1.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

- SCALE 1:25 REV. DATE REVISION DETAILS DRAWN CHKD. APPD.


600
(TYP) 4ø25
4ø16 AT 45⁰ 4ø16 AT 45⁰
0.400

ø25s150
(TYP) THE CONSTRUCTION OF THE KHOR AL ZUBAIR
F
ø25s150 ø25s150 ø25s150 IMMERSED TUNNEL PROJECT
4ø25
4ø16 AT 45⁰ 4ø16 AT 45⁰
FGP/C-08
650(TYP)

ø25s150

0
4ø25 55 YP) OPEN CUT AL FAW
(T REINFORCEMENT
OPENING DETAILS
SHEET 1 OF 2

ø25s150 4ø25 COWI JW HUH


0 0.2 0.4 0.6 0.8 1 2

- TYP. OUTER WALL JUNCTION BOX OPENING - REINFORCEMENT DETAIL E SECTION SCALE 1 : 20 METER
JW KIM 2.0

- SCALE 1:20 - SCALE 1 : 20


0 0.25 0.5 1 1.5 2 2.5
KAZ-CO-DD-OC-DW-5148A
03-05-23
SCALE 1 : 25 METER
NOTES:
NOTE 1: 1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.
· SECTION A: KAZ-CO-DD-OC-DW-5114
· SECTION B: KAZ-CO-DD-OC-DW-5121 2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE
· SECTION C: KAZ-CO-DD-OC-DW-5128 DATUM UNLESS STATED OTHERWISE.
· SECTION D: KAZ-CO-DD-OC-DW-5134
· SECTION E: KAZ-CO-DD-OC-DW-5140 3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL
· SECTION F: KAZ-CO-DD-OC-DW-5145 DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.

A 5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


FOR OUTER WALL REINF. REFER 4ø25 AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
-
DRAWINGS INDICATED IN NOTE 1 REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.
FOR OUTER WALL REINF. REFER
DRAWINGS INDICATED IN NOTE 1

1000 (TYP)
ø16s100
1000
(TYP)
4ø25
4ø16 AT 45⁰ 4ø16 AT 45⁰

LEGEND:

ø16s100
ø20s100 4ø25 4ø25
STRUCTURAL CONCRETE - PRECAST

ø16s100 ø16s100 BALLAST CONCRETE


B
400
(TYP)

ø16s100
FIRE BOARD
ø20s140
WATERSTOP

4ø16 AT 45⁰ 4ø16 AT 45⁰ STRUCTURAL CONCRETE - IN SITU


4ø25
CONSTRUCTION JOINT

(TYP)
1000
ø16s100

(T 550
)
YP
4ø25

A SECTION
- SCALE 1:20

- TYP OUTER WALL NICHE OPENING - REINFORCEMENT DETAIL General Company for Ports of Iraq (GCPI)
- SCALE 1:20
NICHE DIM W x H x D = 1500 x 1250 x 400

TECHNITAL S.p.A

FOR INNER WALL REINF. REFER


DRAWINGS INDICATED IN NOTE 1

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT

1000(TYP)
ø25s140
2.0 03-05-23 FOR APPROVAL TBT MCJ VIZE

1.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

ø16s100 4ø25 ø20s140 4ø25 ø16s100

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT
B SECTION
SCALE 1:20 FGP/C-08
-

OPEN CUT AL FAW


REINFORCEMENT
OPENING DETAILS
SHEET 2 OF 2

COWI JW HUH

JW KIM 2.0

0 0.2 0.4 0.6 0.8 1 2


KAZ-CO-DD-OC-DW-5148B
03-05-23
SCALE 1 : 20 METER
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
CUT & COVER OPEN CUT METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


63000 DATUM UNLESS STATED OTHERWISE.
SECTION A
3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL
DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
SEGMENT 1 SEGMENT 2 SEGMENT 3 DIMENSIONS ONLY - IF IN DOUBT ASK.

20 20980 20 20980 20 20980 20 4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT
SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
1 2 PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE

1886

2571
2500

2833 2524

2646 2500
ENGINEER.
1500 10291
5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED

2857
AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

400

900
6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS
PER SUPPLIER'S RECOMMENDATION.
MEP NICHES
7) FOR MEP CUTOUT & NICHES REFER DRAWING NO.

18857
CLOSURE WALL KAZ-CO-DD-MEP-DW-6121 TO KAZ-CO-DD-MEP-DW-6133

11750

11750
WITH DOOR FOUNDATION

14400
2000
SLAB
THK=1750
MEP NICHES 800
CUT AND COVER CUT AND COVER
63000
OPEN CUT IMMERSED TUNNEL OPEN CUT

CUT AND COVER ZONE

650
1750

1750
12000 650

40914

40914

3200

3200
1900
AL-FAW SIDE

400
650 OPEN CUT TUNNEL
UMM-QASR SIDE

1750

1750
1500 10291

400

650
TUNNEL REFERENCE

CLOSURE WALL

14400
11750

11750
FOUNDATION
SLAB

18857
THK=1750
900

3000
800

900

2500 2646
2524 2833

2571
2500

2000

1886
1157

4 3

51+780.870 51+717.870
COORDINATES General Company for Ports of Iraq (GCPI)

OPEN CUT TUNNEL : SECTION A PLAN X Y

1 206109.219 3334120.412

2 206168.220 3334142.443

3 206182.523 3334104.136
TECHNITAL S.p.A
4 206123.523 3334082.105

63000 DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
SECTION A
DESIGN CONSULTANT

SEGMENT 1 SEGMENT 2 SEGMENT 3


LIGHT ATTENUATION STRUCTURE IS ON HOLD
ONLY SHOWN INDICATIVERY 20 20980 20 20980 20 20980 20
500
4.0 03-05-23 FOR APPROVAL TBT MCJ VIZE
3500
SEE BEAM FOR TUNNEL 3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

3000 ARCHITECTURAL PORTAL 2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE
SPACING = 3.00m 1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE
3000 REV. DATE REVISION DETAILS DRAWN CHKD. APPD.
1500

+7.00m
THE CONSTRUCTION OF THE KHOR AL ZUBAIR
OPEN CUT
IMMERSED TUNNEL PROJECT
2000

A B C D E F
+6.00m
1 2 3 1 2 3 1 2 34 1 1 2 3 4 1 2 3 4
FGP/C-08
13322

11187
800
11899
12610

1500 10291
CUT AND
COVER
1500.003

ZONE
OPEN CUT AL FAW SIDE
1250

MEP NICHES TYPICAL SECTION A


1750

HORIZONTAL & LONGITUDINAL SECTION


1750

SECTION REFERENCE -4.188m

-6.322m
COWI JW HUH

JW KIM 4.0
OPEN CUT TUNNEL : LONGITUDINAL SECTION A
KAZ-CO-DD-OC-DW-5112
03-05-23
NOTES:
33600
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

BEAM FOR TUNNEL ARCHITECTURAL PORTAL 2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE
DRAWINGS KAZ-CO-DD-OC-DW-5186 TO KAZ-CO-DD-OC-DW-5191 DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
800 14400 650 1900 650 14400 800 PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.
+7.00 +7.00 +7.00

750
5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED
AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO

1500

1500

1500
REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

2040

2040

2040
+4.10 DHWL CONSTRUCTION JOINT +4.10 DHWL
7) FOR MEP CUTOUT & NICHES REFER DRAWING NO.
GRANULAR FILL KAZ-CO-DD-MEP-DW-6121 TO KAZ-CO-DD-MEP-DW-6133
1 1
OUTER WALL
OUTER WALL
SHEAR KEY SEE
11572 ÷ 9437 10 SHEAR KEY SEE INNER WALL
670 KAZ-CO-DD-OC-DW-5193 10
KAZ-CO-DD-OC-DW-5193

10822 ÷ 8512
SHEAR KEY SEE
13322 ÷ 11187

KAZ-CO-DD-OC-DW-5194 CUT AND COVER CUT AND COVER

400
0.00 (AFGP) 0.00 (AFGP) OPEN CUT IMMERSED TUNNEL OPEN CUT

1250

1250
CONSTRUCTION JOINT WATERPROOFING MEMBRANE

1250
AL-FAW SIDE
CONSTRUCTION JOINT CONSTRUCTION JOINT

3725
UMM-QASR SIDE
-3.30 DLWL 6180 2040 6180 6180 2040 6180 -3.30 DLWL

150

350

150
TUNNEL REFERENCE

175
770

2000

175
450

450
1750

DETAIL -1-

BOTTOM SLAB BOTTOM SLAB


SHEAR KEY SEE SHEAR KEY SEE
LEAN CONCRETE THK KAZ-CO-DD-OC-DW-5192 KAZ-CO-DD-OC-DW-5192
2500 ÷ 2571 900 11750 1750 650 1900 650 1750 11750 900 2500 ÷ 2571
150mm WITH WIRE MESH
Ø5 s200x200 1957 ÷1886 1957 ÷1886

18857 3200 18857


= =
SPRAY TYPE MEMBRANE
40915

TYPICAL SECTION A - SEGMENTS 1-2-3 General Company for Ports of Iraq (GCPI)

OPEN CUT (AT SEGMENT JOINTS L=21m) CONCRETE


A B C D E F

300
1 2 3 1 2 3 1 2 34 1 1 2 3 4 1 2 3 4
SHEET MEMBRANE

100
(THK=3.0)
TECHNITAL S.p.A
DETAIL-1- (NOT TO SCALE)
D E
5206 5206

475
SECTION REFERENCE
475

+6.00 +6.00
DAEWOO ENGINEERING &

735
735

300 300 CONSTRUCTION CO., LTD


FIRE RESISTANT SEAL

FIRE RESISTANT SEAL

FIRE RESISTANT SEAL


WATER PROOFING
235 2240

2240 235
DESIGN CONSULTANT
MEMBRANE
140
140

GRANULAR FILL
3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

LEBORG
650 650 650 2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE
OR SIMILAR BORG

A 1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE


C

EXTERNAL R SIMILAR
SEAL TREL
5206
LE

650 5206 REV. DATE REVISION DETAILS DRAWN CHKD. APPD.


SEAL TREL
VAR.

400 400

VAR.
WATERSTOP PROFILE FOR 400

O
OPENCUT SECTION A+B

ACME 45V
1250

1250

1250
EXTERNAL
ACME 45V

CALAMITY SEAL
B
ROAD PAVING
(100 mm THK) ROAD PAVING THE CONSTRUCTION OF THE KHOR AL ZUBAIR
(100 mm THK)
1164

1164

5206
IMMERSED TUNNEL PROJECT

1164
SPRAYED
F MEMBRANE
CALAMITY SEAL
5207
300

FGP/C-08

1550
1550

1750

550

300

OPEN CUT AL FAW SIDE

300
300

EXTERNAL SEAL
TRELLEBORG AM 350 OR SIMILAR TYPICAL SECTION A
SHEET MEMBRANE
SEGMENTS 1-2-3
2350 9150 1500 3650 3650 1500 9150 2350

COWI JW HUH
TYPICAL SEGMENT JOINT - CROSS SECTION (OPEN CUT SECTION)
JW KIM 3.0

KAZ-CO-DD-OC-DW-5113
17-02-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


Φ DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
Φ DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


HORIZONTAL LINKS AROUND WATERSTOP
SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONNECTION TO ARCHITECTURAL CONNECTION TO ARCHITECTURAL CONNECTION TO ARCHITECTURAL CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
DRAWINGS KAZ-CO-DD-OC-DW-5188 DRAWINGS KAZ-CO-DD-OC-DW-5188 DRAWINGS KAZ-CO-DD-OC-DW-5188 ENGINEER.
TO KAZ-CO-DD-OC-DW-5191 TO KAZ-CO-DD-OC-DW-5191 TO KAZ-CO-DD-OC-DW-5191
5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED
AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.
+7.00 +7.00
6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS
PER SUPPLIER'S RECOMMENDATION.

10

0.00 (AFGP)

GRANULAR FILL
General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
= = DESIGN CONSULTANT

3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE

REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT AL FAW SIDE


TYPICAL SECTION A
REINFORCEMENT SEGMENTS 1-2-3
SHEET 1 OF 3

COWI JW HUH

JW KIM 3.0

KAZ-CO-DD-OC-DW-5114
17-02-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.
Φ
Φ 3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL
DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.
HORIZONTAL LINKS AROUND WATERSTOP

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
CONNECTION TO ARCHITECTURAL CONNECTION TO ARCHITECTURAL CONNECTION TO ARCHITECTURAL PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
DRAWINGS KAZ-CO-DD-OC-DW-5188 DRAWINGS KAZ-CO-DD-OC-DW-5188 DRAWINGS KAZ-CO-DD-OC-DW-5188 CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
TO KAZ-CO-DD-OC-DW-5191 TO KAZ-CO-DD-OC-DW-5191 TO KAZ-CO-DD-OC-DW-5191 ENGINEER.

5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


+7.00 +7.00 AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

10

0.00 (AFGP)

GRANULAR FILL
General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
= =
DESIGN CONSULTANT

3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE

REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT AL FAW SIDE


SECTION A
REINFORCEMENT SEGMENTS 1-2-3
SHEET 2 OF 3

COWI JW HUH

JW KIM 3.0

KAZ-CO-DD-OC-DW-5218A
17-02-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.
Φ
3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL
Φ
DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


HORIZONTAL LINKS AROUND WATERSTOP

SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS


CONNECTION TO ARCHITECTURAL CONNECTION TO ARCHITECTURAL CONNECTION TO ARCHITECTURAL PREFERENCE AND TO BE INCORPORATED INTO THE
DRAWINGS KAZ-CO-DD-OC-DW-5188 DRAWINGS KAZ-CO-DD-OC-DW-5188 DRAWINGS KAZ-CO-DD-OC-DW-5188 CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
TO KAZ-CO-DD-OC-DW-5191 TO KAZ-CO-DD-OC-DW-5191 TO KAZ-CO-DD-OC-DW-5191 ENGINEER.

5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


+7.00 +7.00 AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

10

GRANULAR FILL
0.00 (AFGP)

General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
= =
DESIGN CONSULTANT

2.0 03-05-23 FOR APPROVAL TBT MCJ VIZE

1.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT AL FAW SIDE


SECTION A
REINFORCEMENT SEGMENTS 1-2-3
SHEET 3 OF 3

COWI JW HUH

JW KIM 2.0

KAZ-CO-DD-OC-DW-5218B
03-05-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.

5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

Φ
Φ

HORIZONTAL LINKS AROUND WATERSTOP

General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT

3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE

REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT AL FAW SIDE


LONGITUDINAL SECTION A
REINFORCEMENT SEGMENTS 1-2-3
SHEET 1 OF 4

COWI JW HUH

JW KIM 3.0

KAZ-CO-DD-OC-DW-5115
17-02-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.

5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT

4.0 03-05-23 FOR APPROVAL TBT MCJ VIZE

3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE


REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT AL FAW SIDE


LONGITUDINAL SECTION A
REINFORCEMENT SEGMENTS 1-2-3
SHEET 2 OF 4

COWI JW HUH

JW KIM 4.0

KAZ-CO-DD-OC-DW-5116
03-05-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.

5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.
Φ
Φ 6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS
PER SUPPLIER'S RECOMMENDATION.

HORIZONTAL LINKS AROUND WATERSTOP

General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT

3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE

REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT AL FAW SIDE


LONGITUDINAL SECTION A
REINFORCEMENT SEGMENTS 1-2-3
SHEET 3 OF 4

COWI JW HUH

JW KIM 3.0

KAZ-CO-DD-OC-DW-5117
17-02-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.

5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT

3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE

REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT AL FAW SIDE


LONGITUDINAL SECTION A
REINFORCEMENT SEGMENTS 1-2-3
SHEET 4 OF 4

COWI JW HUH

JW KIM 3.0

KAZ-CO-DD-OC-DW-5118
17-02-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.
63000 3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL
SECTION B DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

SEGMENT 1 SEGMENT 2 SEGMENT 3 4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT
SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
20 20980 20 20980 20 20980 20 PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
5 CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
6
ENGINEER.

2646 2500

2455 2690

2500
5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED
AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

800

900
6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS
PER SUPPLIER'S RECOMMENDATION.

900
7) FOR MEP CUTOUT & NICHES REFER DRAWING NO.
KAZ-CO-DD-MEP-DW-6121 TO KAZ-CO-DD-MEP-DW-6133

FOUNDATION

11750

11750

11750
15200
SLAB

15100
THK=1750
CUT AND COVER CUT AND COVER
CLOSURE WALL
OPEN CUT IMMERSED TUNNEL OPEN CUT

1750

1750

1750
AL-FAW SIDE

40491
3200

3200

3200
UMM-QASR SIDE
OPEN CUT TUNNEL 650

1750

1750

1750
TUNNEL REFERENCE

15100
15200
11750

11750

11750
FOUNDATION
SLAB
THK=1750

MEP NICHES
10654 1500
900

900
2500 2646

2690 2455
800

400

2500
8 7

51+717.870 51+654.870
COORDINATES General Company for Ports of Iraq (GCPI)
X Y
OPEN CUT TUNNEL : SECTION B
5 206168.310 3334142.258

6 206227.311 3334164.289

7 206241.471 3334126.367
TECHNITAL S.p.A
8 206182.470 3334104.336

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT

63000

SECTION B 3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE


SEGMENT 1 SEGMENT 2 SEGMENT 3
REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

20 20980 20 20980 20 20980 20

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


1500

+7.00m 800
OPEN CUT
A B C D E F
IMMERSED TUNNEL PROJECT
1 2 3 1 2 3 1 2 34 1 1 2 3 4 1 2 3 4
1250
+6.00m +6.00m
EXTERNAL 10654 FGP/C-08

9288
WALL
9921
2000
10554
11187

THK=VAR. MEP NICHES


1500
OPEN CUT AL FAW SIDE
TYPICAL SECTION B
1752

HORIZONTAL & LONGITUDINAL SECTION


SECTION REFERENCE -2.289m

-4.188m
COWI JW HUH

JW KIM 3.0
OPEN CUT TUNNEL : LONGITUDINAL SECTION B
KAZ-CO-DD-OC-DW-5119
17-02-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.
33600
3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL
800 14400 650 1900 650 14400 800 DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


+7.00 +7.00 +7.00 SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS

750
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE

1500

1500

1500
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.

5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED

2040

2040

2040
+4.10 DHWL CONSTRUCTION JOINT +4.10 DHWL AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

GRANULAR FILL
1 1
9437 ÷ 7538 OUTER WALL 6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS

9187 ÷ 6538
OUTER WALL SHEAR KEY SEE PER SUPPLIER'S RECOMMENDATION.
11187 ÷ 9288

10 SHEAR KEY SEE INNER WALL KAZ-CO-DD-OC-DW-5193 10


670 7) FOR MEP CUTOUT & NICHES REFER DRAWING NO.
KAZ-CO-DD-OC-DW-5193 SHEAR KEY SEE
KAZ-CO-DD-MEP-DW-6121 TO KAZ-CO-DD-MEP-DW-6133
KAZ-CO-DD-OC-DW-5194

1250
0.00 (AFGP) 0.00 (AFGP)
CONSTRUCTION JOINT CONSTRUCTION JOINT CONSTRUCTION JOINT
6180 2040 6180 6180 2040 6180
CUT AND COVER CUT AND COVER

150

350

150
175
WATERPROOFING MEMBRANE

770
OPEN CUT IMMERSED TUNNEL OPEN CUT

-3.30 DLWL -3.30 DLWL

2000

175
450

450
1750

AL-FAW SIDE

DETAIL -1-
UMM-QASR SIDE

BOTTOM SLAB BOTTOM SLAB


SHEAR KEY SEE SHEAR KEY SEE TUNNEL REFERENCE
LEAN CONCRETE THK. 100mm KAZ-CO-DD-OC-DW-5192 KAZ-CO-DD-OC-DW-5192
2500 ÷ 2690 900 11750 1750 650 1900 650 1750 11750 900 2500 ÷ 2690

1746 ÷1555 1746 ÷1555


18646 3200 18646
= =
40491

TYPICAL SECTION B - SEGMENTS 1-2-3


(AT SEGMENT JOINTS L=21m)

SPRAY TYPE MEMBRANE


General Company for Ports of Iraq (GCPI)
OPEN CUT
A B C D E F

1 2 3 1 2 3 1 2 34 1 1 2 3 4 1 2 3 4

CONCRETE
TECHNITAL S.p.A

300
SHEET MEMBRANE

100
(THK=3.0)
SECTION REFERENCE
DETAIL-1- (NOT TO SCALE) DAEWOO ENGINEERING &
CONSTRUCTION CO., LTD
D E
- -
DESIGN CONSULTANT

465
465

+6.00 +6.00
735

735
300 300
FIRE RESISTANT SEAL

FIRE RESISTANT SEAL

FIRE RESISTANT SEAL


WATER PROOFING 3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE
235 2240

235 2240
MEMBRANE
G

140 2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE


ACME 45V SEAL TRELLEBOR

140 1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE


OR SIMILAR

650 REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

LEBORG
GRANULAR FILL 650 650

EXTERNAL R SIMILAR
EXTERNAL

SEAL TREL
400 WATERSTOP PROFILE FOR 650
OPENCUT SECTION A+B THE CONSTRUCTION OF THE KHOR AL ZUBAIR
VAR.

VAR.
A
1250

O
C
- IMMERSED TUNNEL PROJECT

ACME 45V
ROAD PAVING
B (100 mm THK) - ROAD PAVING
(100 mm THK)
-
1164

F CALAMITY SEAL CALAMITY SEAL


5207 SPRAYED FGP/C-08
MEMBRANE
300
1550

1550
1750

550

300

OPEN CUT AL FAW SIDE


TYPICAL SECTION B
300

300
EXTERNAL SEAL SEGMENTS 1-2-3
TRELLEBORG AM 350 OR SIMILAR
SHEET MEMBRANE
2350 9150 1500 3650 3650 1500 9150 2350

COWI JW HUH

TYPICAL SEGMENT JOINT - CROSS SECTION (OPEN CUT SECTION) JW KIM 3.0

KAZ-CO-DD-OC-DW-5120
17-02-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.
Φ
Φ
3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL
DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


HORIZONTAL LINKS AROUND WATERSTOP

SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS


PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.

5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
+7.00 +7.00 REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

10

GRANULAR FILL
0.00 (AFGP)

General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A
= =

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT

3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE

REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT AL FAW SIDE


TYPICAL SECTION B
REINFORCEMENT SEGMENTS 1-2-3
SHEET 1 OF 2

COWI JW HUH

JW KIM 3.0

KAZ-CO-DD-OC-DW-5121
17-02-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.
Φ
Φ 3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL
DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.
HORIZONTAL LINKS AROUND WATERSTOP

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.

5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


+7.00 +7.00 AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

10

GRANULAR FILL
0.00 (AFGP)

General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A
= =

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT

3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE

REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT AL FAW SIDE


SECTION B
REINFORCEMENT SEGMENTS 1-2-3
SHEET 2 OF 2

COWI JW HUH

JW KIM 3.0

KAZ-CO-DD-OC-DW-5219
17-02-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.

5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

Φ
Φ

HORIZONTAL LINKS AROUND WATERSTOP

General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT

4.0 03-05-23 FOR APPROVAL TBT MCJ VIZE

3.0 17-05-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE


REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT AL FAW SIDE


LONGITUDINAL SECTION B
REINFORCEMENT SEGMENTS 1-2-3
SHEET 1 OF 4

COWI JW HUH

JW KIM 4.0

KAZ-CO-DD-OC-DW-5122
03-05-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.

5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT

4.0 03-05-23 FOR APPROVAL TBT MCJ VIZE

3.0 17-05-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE


REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT AL FAW SIDE


LONGITUDINAL SECTION B
REINFORCEMENT SEGMENTS 1-2-3
SHEET 2 OF 4

COWI JW HUH

JW KIM 4.0

KAZ-CO-DD-OC-DW-5123
03-05-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.

5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

Φ
Φ

HORIZONTAL LINKS AROUND WATERSTOP

General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT

3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE

REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT AL FAW SIDE


LONGITUDINAL SECTION B
REINFORCEMENT SEGMENTS 1-2-3
SHEET 3 OF 4

COWI JW HUH

JW KIM 3.0

KAZ-CO-DD-OC-DW-5124
17-02-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.

5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT

3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE

REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT AL FAW SIDE


LONGITUDINAL SECTION B
REINFORCEMENT SEGMENTS 1-2-3
SHEET 4 OF 4

COWI JW HUH

JW KIM 3.0

KAZ-CO-DD-OC-DW-5125
17-02-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
84000 METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


SECTION C DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


SEGMENT 1 SEGMENT 2 SEGMENT 3 SEGMENT 4 DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.
20 20980 20 20980 20 20980 20 20980 20
4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT
9 SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
10 PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE

1342
2455 2690

2500

2712
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE

3255
9147 1500 ENGINEER.

5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO

400

800
REINFORCEMENT.

1550

1342
900

900
6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS
MEP NICHES PER SUPPLIER'S RECOMMENDATION.

7) FOR MEP CUTOUT & NICHES REFER DRAWING NO.

11750
KAZ-CO-DD-MEP-DW-6121 TO KAZ-CO-DD-MEP-DW-6133

16000
15100
CLOSURE WALL
CUT AND COVER CUT AND COVER

OPEN CUT IMMERSED TUNNEL OPEN CUT

1750

40110

40110
32000

30200

32000

34683
3200
650 AL-FAW SIDE

1750
UMM-QASR SIDE
FOUNDATION
SLAB
THK=1750 TUNNEL REFERENCE

15100

16000
11750

900

900
1550

1342
800
2690 2455

3255

2712
2500

1342
12 11

51+654.870 51+570.870

General Company for Ports of Iraq (GCPI)


COORDINATES
OPEN CUT TUNNEL : SECTION C PLAN
X Y

9 206227.396 3334164.118

10 206306.069 3334193.495
TECHNITAL S.p.A
11 206320.097 3334155.929

12 206241.424 3334126.552

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
84000 DESIGN CONSULTANT

SECTION C

SEGMENT 1 SEGMENT 2 SEGMENT 3 SEGMENT 4


3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE
20 20980 20 20980 20 20980 20 20980 20
2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE

REV. DATE REVISION DETAILS DRAWN CHKD. APPD.


9147 1500
1500

800
+7.00m

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


OPEN CUT
9147 1500 +6.00m +6.00m IMMERSED TUNNEL PROJECT

7167
A B C D E F

7697
8228
1200
8758
1250
9288

1 2 3 1 2 3 1 2 34 1 1 2 3 4 1 2 3 4
MEP NICHES FGP/C-08

-0.169m

1750
OPEN CUT AL FAW SIDE
1750

-2.289m TYPICAL SECTION C


HORIZONTAL & LONGITUDINAL SECTION
SECTION REFERENCE

COWI JW HUH

OPEN CUT TUNNEL : LONGITUDINAL SECTION C JW KIM 3.0

KAZ-CO-DD-OC-DW-5126
17-02-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.
33600
3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL
800 32000 800 DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

+7.00 +7.00 4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT
OUTER WALL SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
OUTER WALL
SHEAR KEY SEE PREFERENCE AND TO BE INCORPORATED INTO THE

1500

1500
SHEAR KEY SEE CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
KAZ-CO-DD-OC-DW-5195

TUNNEL AXIS
KAZ-CO-DD-OC-DW-5195 CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.

1240

1240
+4.10 DHWL +4.10 DHWL 5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED

7538 ÷ 5417
AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.
1 670 1

9288 ÷ 7167
6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS
PER SUPPLIER'S RECOMMENDATION.
10 CONSTRUCTION JOINT 10
CONSTRUCTION JOINT WATERPROOFING MEMBRANE 7) FOR MEP CUTOUT & NICHES REFER DRAWING NO.
6980 2040 6980 6980 2040 6980 KAZ-CO-DD-MEP-DW-6121 TO KAZ-CO-DD-MEP-DW-6133

150

150
0.00 (AFGP) 0.00 (AFGP)

770

770
450

450
1750

CUT AND COVER CUT AND COVER

DETAIL -1- OPEN CUT IMMERSED TUNNEL OPEN CUT

-3.30 DLWL -3.30 DLWL


BOTTOM SLAB BOTTOM SLAB
SHEAR KEY SEE SHEAR KEY SEE
AL-FAW SIDE
2500 ÷ 2712 900 KAZ-CO-DD-OC-DW-5192 30200 KAZ-CO-DD-OC-DW-5192 900 2500 ÷ 2712
LEAN CONCRETE THK UMM-QASR SIDE
150mm WITH WIRE MESH 1555÷1342 1555÷1342
Ø5 s200x200
40110 TUNNEL REFERENCE

TYPICAL SECTION C - SEGMENTS 1-2-3-4


(AT SEGMENT JOINTS L=21m)

SPRAY TYPE MEMBRANE

OPEN CUT
A B C D E F
General Company for Ports of Iraq (GCPI)
1 2 3 1 2 3 1 2 34 1 1 2 3 4 1 2 3 4

CONCRETE

300
SHEET MEMBRANE TECHNITAL S.p.A

100
(THK=3.0)

SECTION REFERENCE
DETAIL-1- (NOT TO SCALE)

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
E DESIGN CONSULTANT
5206

465
465

+6.00
300 +6.00
1440 735

1440 735
300

FIRE RESISTANT SEAL


140 3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

WATER PROOFING 140 D 2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE
MEMBRANE 5206
G

LEBORG
ACME 45V SEAL TRELLEBOR

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE


650
REV. DATE REVISION DETAILS DRAWN CHKD. APPD.
235

235
400
OR SIMILAR

EXTERNAL R SIMILAR
SEAL TREL
A

1250
5206 ROAD PAVING
VAR.

VAR.
O
B ROAD PAVING
EXTERNAL

(100 mm THK)
THE CONSTRUCTION OF THE KHOR AL ZUBAIR

ACME 45V
(100 mm THK)
5206

1164
C 650
F
5207
CALAMITY SEAL 5206 CALAMITY SEAL
SPRAYED IMMERSED TUNNEL PROJECT
MEMBRANE

FGP/C-08
1550

1550
1750

300

300
300

300
EXTERNAL SEAL
TRELLEBORG AM 350 OR SIMILAR OPEN CUT AL FAW SIDE
SHEET MEMBRANE
2350 9150 1500 3650 3650 1500 9150 2350 TYPICAL SECTION C
SEGMENTS 1-2-3-4
WATERSTOP PROFILE FOR
OPENCUT SECTION C+D+E+F

TYPICAL SEGMENT JOINT - CROSS SECTION (OPEN CUT SECTION)


COWI JW HUH

JW KIM 3.0

KAZ-CO-DD-OC-DW-5127
17-02-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.
Φ
Φ
4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT
SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
HORIZONTAL LINKS AROUND WATERSTOP

ENGINEER.

5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

+7.00

10

0.00 (AFGP)

1750
General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT

3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE

REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT AL FAW SIDE


TYPICAL SECTION C
REINFORCEMENT SEGMENTS 1-2-3
SHEET 1 OF 2

COWI JW HUH

JW KIM 3.0

KAZ-CO-DD-OC-DW-5128
17-02-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


Φ DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
Φ
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


HORIZONTAL LINKS AROUND WATERSTOP

SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS


PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.

5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

+7.00 6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

10

0.00 (AFGP)

General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT

3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE

REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT AL FAW SIDE


SECTION C
REINFORCEMENT SEGMENTS 1-2-3
SHEET 2 OF 2

COWI JW HUH

JW KIM 3.0

KAZ-CO-DD-OC-DW-5208
17-02-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.

5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

Φ
Φ

HORIZONTAL LINKS AROUND WATERSTOP

General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT

4.0 03-05-23 FOR APPROVAL TBT MCJ VIZE

3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE


REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT AL FAW SIDE


LONGITUDINAL SECTION C
REINFORCEMENT SEGMENTS 1-2-3-4
SHEET 1 OF 3

COWI JW HUH

JW KIM 4.0

KAZ-CO-DD-OC-DW-5129
03-05-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.
Φ
Φ 5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED
AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.
HORIZONTAL LINKS AROUND WATERSTOP

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT

4.0 03-05-23 FOR APPROVAL TBT MCJ VIZE

3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE


REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT AL FAW SIDE


LONGITUDINAL SECTION C
REINFORCEMENT SEGMENTS 1-2-3-4
SHEET 2 OF 3

COWI JW HUH

JW KIM 4.0

KAZ-CO-DD-OC-DW-5130
03-05-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.

5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT

3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE

REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT AL FAW SIDE


LONGITUDINAL SECTION C
REINFORCEMENT SEGMENTS 1-2-3-4
SHEET 3 OF 3

COWI JW HUH

JW KIM 3.0

KAZ-CO-DD-OC-DW-5131
17-02-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.
SECTION D
3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL
DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
SEGMENT 1 DIMENSIONS ONLY - IF IN DOUBT ASK.

20 20980 20 4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE

1342
ENGINEER.

800

1296
13
14 5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED
AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

1342
6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS

900

900
PER SUPPLIER'S RECOMMENDATION.

7) FOR MEP CUTOUT & NICHES REFER DRAWING NO.


KAZ-CO-DD-MEP-DW-6121 TO KAZ-CO-DD-MEP-DW-6133

CUT AND COVER CUT AND COVER

OPEN CUT IMMERSED TUNNEL OPEN CUT

30200

32000

34683

33492

30900
AL-FAW SIDE

UMM-QASR SIDE

FOUNDATION
SLAB TUNNEL REFERENCE
THK=1750

COORDINATES
X Y

13 206307.036 3334190.963

900
900
14 206326.897 3334197.750

1342
15 206338.615 3334166.366

16 206319.167 3334158.474

1296
800
15

1342
16

51+570.870 51+549.870
General Company for Ports of Iraq (GCPI)

OPEN CUT TUNNEL : SECTION D PLAN

TECHNITAL S.p.A

SECTION D
DAEWOO ENGINEERING &
SEGMENT 1 CONSTRUCTION CO., LTD
20 20980 20 DESIGN CONSULTANT
1500

800 +7.00m 3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE


+6.00m
6161
REV. DATE REVISION DETAILS DRAWN CHKD. APPD.
6711
7167

1200

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


1200
1750

OPEN CUT
A B C D E F -0.169m
+0.287m IMMERSED TUNNEL PROJECT
1 2 3 1 2 3 1 2 34 1 1 2 3 4 1 2 3 4
FGP/C-08

OPEN CUT AL FAW SIDE


TYPICAL SECTION D
OPEN CUT TUNNEL : LONGITUDINAL SECTION D HORIZONTAL & LONGITUDINAL SECTION
SECTION REFERENCE

COWI JW HUH

JW KIM 3.0

KAZ-CO-DD-OC-DW-5132
17-02-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.
33600 ÷ 32500
4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT
SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
800 32000 ÷ 30900 800 PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.
+7.00 +7.00

TUNNEL AXIS
OUTER WALL 5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED
OUTER WALL

1500
SHEAR KEY SEE AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO

1500
KAZ-CO-DD-OC-DW-5195 SHEAR KEY SEE REINFORCEMENT.
KAZ-CO-DD-OC-DW-5195
6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS

5417 ÷ 4961

1240

1240
PER SUPPLIER'S RECOMMENDATION.
+4.10 DHWL +4.10 DHWL

7167 ÷ 6711
CONSTRUCTION JOINT CONSTRUCTION JOINT 7) FOR MEP CUTOUT & NICHES REFER DRAWING NO.
1 1 KAZ-CO-DD-MEP-DW-6121 TO KAZ-CO-DD-MEP-DW-6133
6980 2040 6980 6980 2040 6980

150

150
10 670 670 10

770

770
WATERPROOFING MEMBRANE

CUT AND COVER CUT AND COVER

450

450
1750
0.00 (AFGP) 0.00 (AFGP) OPEN CUT IMMERSED TUNNEL OPEN CUT

DETAIL -2- DETAIL -2-


BOTTOM SLAB BOTTOM SLAB
LEAN CONCRETE THK SHEAR KEY SEE SHEAR KEY SEE AL-FAW SIDE
150mm WITH WIRE MESH KAZ-CO-DD-OC-DW-5192 KAZ-CO-DD-OC-DW-5192
900 30200÷ 29100 900
Ø5 s200x200 UMM-QASR SIDE
-3.30 DLWL 1342 ÷ 1296 -3.30 DLWL
1342 ÷ 1296
TUNNEL REFERENCE
34683 ÷ 33492

TYPICAL SECTION D - SEGMENT 1


(AT SEGMENT JOINTS L=21m)

SPRAY TYPE MEMBRANE

OPEN CUT
A B C D E F

1 2 3 1 2 3 1 2 34 1 1 2 3 4 1 2 3 4

General Company for Ports of Iraq (GCPI)

300
SHEET MEMBRANE

100
SECTION REFERENCE (THK=3.0)

DETAIL-2- (NOT TO SCALE) TECHNITAL S.p.A

E
5206
DAEWOO ENGINEERING &
CONSTRUCTION CO., LTD

465
465

+6.00 +6.00
DESIGN CONSULTANT
1440 735

1440 735
300 D
300
WATER PROOFING 140 5206 140

FIRE RESISTANT SEAL


MEMBRANE

ROAD PAVING
A B (100 mm THK) ROAD PAVING
(100 mm THK)
5206 5206

EXTERNAL SEAL TRELLEBORG


235

235
650 3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE
EXTERNAL SEAL TRELLEBORG

C
VAR.

VAR.
CALAMITY SEAL 5206 CALAMITY SEAL
5207 650 2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

ACME 45V OR SIMILAR


ACME 45V OR SIMILAR

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE

REV. DATE REVISION DETAILS DRAWN CHKD. APPD.


1550

1550
1750

300

300 SPRAYED THE CONSTRUCTION OF THE KHOR AL ZUBAIR


300

300
EXTERNAL SEAL
MEMBRANE
TRELLEBORG AM 350 OR SIMILAR

2350 8600 5700 5700 8600


SHEET MEMBRANE
2350
IMMERSED TUNNEL PROJECT
WATERSTOP PROFILE FOR
OPENCUT SECTION C+D+E+F
FGP/C-08

TYPICAL SEGMENT JOINT - CROSS SECTION (OPEN CUT SECTION)


OPEN CUT AL FAW SIDE
TYPICAL SECTION D
SEGMENT 1

COWI JW HUH

JW KIM 3.0

KAZ-CO-DD-OC-DW-5133
17-02-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
Φ CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
Φ ENGINEER.

5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


HORIZONTAL LINKS AROUND WATERSTOP
AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

+7.00

10

0.00 (AFGP)

General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT

3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE

REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT AL FAW SIDE


TYPICAL SECTION D
REINFORCEMENT SEGMENT 1
SHEET 1 OF 2

COWI JW HUH

JW KIM 3.0

KAZ-CO-DD-OC-DW-5134
17-02-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.
Φ
Φ 4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT
SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
HORIZONTAL LINKS AROUND WATERSTOP
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.

5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

+7.00

10

0.00 (AFGP)

General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT

3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE

REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT AL FAW SIDE


SECTION D
REINFORCEMENT SEGMENT 1
SHEET 2 OF 2

COWI JW HUH

JW KIM 3.0

KAZ-CO-DD-OC-DW-5209
17-02-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.

5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

Φ
Φ

HORIZONTAL LINKS AROUND WATERSTOP

General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT

4.0 03-05-23 FOR APPROVAL TBT MCJ VIZE

3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE


REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT AL FAW SIDE


LONGITUDINAL SECTION D
REINFORCEMENT SEGMENT 1
SHEET 1 OF 3

COWI JW HUH

JW KIM 4.0

KAZ-CO-DD-OC-DW-5135
03-05-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.

5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

Φ
Φ

HORIZONTAL LINKS AROUND WATERSTOP

General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT

4.0 03-05-23 FOR APPROVAL TBT MCJ VIZE

3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE


REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT AL FAW SIDE


LONGITUDINAL SECTION D
REINFORCEMENT SEGMENT 1
SHEET 2 OF 3

COWI JW HUH

JW KIM 4.0

KAZ-CO-DD-OC-DW-5136
03-05-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.

5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT

4.0 03-05-23 FOR APPROVAL TBT MCJ VIZE

3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE


REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT AL FAW SIDE


LONGITUDINAL SECTION D
REINFORCEMENT SEGMENT 1
SHEET 3 OF 3

COWI JW HUH

JW KIM 4.0

KAZ-CO-DD-OC-DW-5137
03-05-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

84000 2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

SECTION E 3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
SEGMENT 1 SEGMENT 2 SEGMENT 3 SEGMENT 4 DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


20 20980 20 20980 20 20980 20 20980 20 SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.

1296

1143
9127 1500 5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED
17 18

800
AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS

400
PER SUPPLIER'S RECOMMENDATION.

900
7) FOR MEP CUTOUT & NICHES REFER DRAWING NO.
MEP NICHES KAZ-CO-DD-MEP-DW-6121 TO KAZ-CO-DD-MEP-DW-6133

CUT AND COVER CUT AND COVER

OPEN CUT IMMERSED TUNNEL OPEN CUT

AL-FAW SIDE

30900

33492

30900
33185
UMM-QASR SIDE

FOUNDATION TUNNEL REFERENCE


SLAB
THK=1200

MEP NICHES

10688 1500

400

800

1143
1296

20 19

51+549.870 51+465.870
General Company for Ports of Iraq (GCPI)

COORDINATES
OPEN CUT TUNNEL : SECTION E
X Y

17 206326.916 3334197.757
TECHNITAL S.p.A
18 206405.646 3334226.984

19 206417.252 3334195.900

20 206338.634 3334166.373

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT
84000

SECTION E

SEGMENT 1 SEGMENT 2 SEGMENT 3 SEGMENT 4 3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE


20 20980 20 20980 20 20980 20 20980 20 1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE

REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

10688 1500 9127 1500


1500

1250

800
1250

+7.00m
THE CONSTRUCTION OF THE KHOR AL ZUBAIR
OPEN CUT
A B C D E F
IMMERSED TUNNEL PROJECT

4628

4628
5011
5394
5778

+6.00m
6161

MEP NICHES
MEP NICHES
1 2 3 1 2 3 1 2 34 1 1 2 3 4 1 2 3 4
1200

FGP/C-08
+2.369m

1200
1200
1200

+0.837m
OPEN CUT AL FAW SIDE
TYPICAL SECTION E
HORIZONTAL & LONGITUDINAL SECTION
SECTION REFERENCE

OPEN CUT TUNNEL : LONGITUDINAL SECTION E COWI JW HUH

JW KIM 3.0

KAZ-CO-DD-OC-DW-5138
17-02-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
32500 ENGINEER.

800 30900 800 5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS

TUNNEL AXIS
+7.00 +7.00 PER SUPPLIER'S RECOMMENDATION.

OUTER WALL 7) FOR MEP CUTOUT & NICHES REFER DRAWING NO.
400 OUTER WALL

1510

1510
KAZ-CO-DD-MEP-DW-6121 TO KAZ-CO-DD-MEP-DW-6133
MET NICHE SHEAR KEY SEE SHEAR KEY SEE 400 MET NICHE
KAZ-CO-DD-OC-DW-5195 KAZ-CO-DD-OC-DW-5195

1250

1250
6161 ÷ 4628
+4.10 DHWL CONSTRUCTION JOINT CONSTRUCTION JOINT +4.10 DHWL

1 6705 2040 6705 6705 2040 6705 1


CUT AND COVER CUT AND COVER

150

150
OPEN CUT IMMERSED TUNNEL OPEN CUT

770

770
10 10
WATERPROOFING MEMBRANE
1200

450

450
AL-FAW SIDE

0.00 (AFGP) DETAIL -2- 0.00 (AFGP)


UMM-QASR SIDE

DETAIL -2- BOTTOM SLAB BOTTOM SLAB


SHEAR KEY SEE SHEAR KEY SEE TUNNEL REFERENCE
LEAN CONCRETE THK. 100mm
900 KAZ-CO-DD-OC-DW-5192 29100 KAZ-CO-DD-OC-DW-5192 900

1296÷1143 1296÷1143
33492 ÷ 33185

TYPICAL SECTION E - SEGMENTS 1-2-3-4


(AT SEGMENT JOINTS L=21m)

SPRAY TYPE MEMBRANE


General Company for Ports of Iraq (GCPI)

OPEN CUT
A B C D E F

1 2 3 1 2 3 1 2 34 1 1 2 3 4 1 2 3 4

TECHNITAL S.p.A

300
SHEET MEMBRANE

100
(THK=3.0)

SECTION REFERENCE
DAEWOO ENGINEERING &
DETAIL-2- (NOT TO SCALE) CONSTRUCTION CO., LTD
DESIGN CONSULTANT

300 3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE


475

475
300 E
5206 2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE
+6.00 +6.00
1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE

735 1440
1440 735

FIRE RESISTANT SEAL


WATER PROOFING 400 REV. DATE REVISION DETAILS DRAWN CHKD. APPD.
MEMBRANE
140 400
1250

1250
ROAD PAVING ROAD PAVING
140
B

EXTERNAL SEAL TRELLEBORG


(100 mm THK) (100 mm THK)
A 5206
1164

1164
5206
VAR.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR

VAR.
EXTERNAL SEAL TRELLEBORG

ACME 45V OR SIMILAR


CALAMITY SEAL CALAMITY SEAL

F IMMERSED TUNNEL PROJECT


ACME 45V OR SIMILAR

5207

1550
1550

300
1200

FGP/C-08
SPRAYED
EXTERNAL SEAL

300
300

MEMBRANE
TRELLEBORG AM 350 OR SIMILAR

2350 8210 5700 5700 8210 2350


WATERSTOP PROFILE FOR
OPEN CUT AL FAW SIDE
OPENCUT SECTION C+D+E+F TYPICAL SECTION E
SEGMENTS 1-2-3-4

TYPICAL SEGMENT JOINT - CROSS SECTION (OPEN CUT SECTION)


COWI JW HUH

JW KIM 3.0

KAZ-CO-DD-OC-DW-5139
17-02-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.
Φ
Φ
5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED
AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.
HORIZONTAL LINKS AROUND WATERSTOP

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

+7.00

10

0.00 (AFGP)

General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT

3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE

REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT AL FAW SIDE


TYPICAL SECTION E
REINFORCEMENT SEGMENT 1-2-3-4
SHEET 1 OF 2

COWI JW HUH

JW KIM 3.0

KAZ-CO-DD-OC-DW-5140
17-02-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


Φ SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
Φ PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
HORIZONTAL LINKS AROUND WATERSTOP

ENGINEER.

5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

+7.00

10

0.00 (AFGP)

General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT

3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE

REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT AL FAW SIDE


SECTION E
REINFORCEMENT SEGMENT 1-2-3-4
SHEET 2 OF 2

COWI JW HUH

JW KIM 3.0

KAZ-CO-DD-OC-DW-5210
17-02-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.

5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

Φ
Φ

HORIZONTAL LINKS AROUND WATERSTOP

General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT

4.0 03-05-23 FOR APPROVAL TBT MCJ VIZE

3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE


REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT AL FAW SIDE


LONGITUDINAL SECTION E
REINFORCEMENT SEGMENTS 1-2-3-4
SHEET 1 OF 3

COWI JW HUH

JW KIM 4.0

KAZ-CO-DD-OC-DW-5141
03-05-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.

5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

Φ
Φ

HORIZONTAL LINKS AROUND WATERSTOP

General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT

4.0 03-05-23 FOR APPROVAL TBT MCJ VIZE

3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE


REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT AL FAW SIDE


LONGITUDINAL SECTION E
REINFORCEMENT SEGMENTS 1-2-3-4
SHEET 2 OF 3

COWI JW HUH

JW KIM 4.0

KAZ-CO-DD-OC-DW-5142
03-05-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.

5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT

2.0 03-05-23 FOR APPROVAL TBT MCJ VIZE

1.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT AL FAW SIDE


LONGITUDINAL SECTION E
REINFORCEMENT SEGMENTS 1-2-3-4
SHEET 3 OF 3

COWI JW HUH

JW KIM 2.0

KAZ-CO-DD-OC-DW-5224
03-05-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.
88000
3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL
SECTION F DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.
SEGMENT 1 SEGMENT 2 SEGMENT 3 SEGMENT 4
4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT
SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
20 20980 20 20980 20 20980 20 25000 PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.

5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED

1143

1143

1143

343

1143
AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
21 22
REINFORCEMENT.

800
6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS
PER SUPPLIER'S RECOMMENDATION.

900
7) FOR MEP CUTOUT & NICHES REFER DRAWING NO.
KAZ-CO-DD-MEP-DW-6121 TO KAZ-CO-DD-MEP-DW-6133
A

CUT AND COVER CUT AND COVER

OPEN CUT IMMERSED TUNNEL OPEN CUT

AL-FAW SIDE

33185

30900

33185

30900

33185

30900
UMM-QASR SIDE

TUNNEL REFERENCE
FOUNDATION FOUNDATION
SLAB SLAB
THK=1200 THK=1200

900

800
1143

1143

1143

1143
343
24 23

51+377.870
51+465.870 General Company for Ports of Iraq (GCPI)

OPEN CUT TUNNEL : SECTION F PLAN


COORDINATES
X Y
TECHNITAL S.p.A
21 206405.664 3334226.991

22 206488.109 3334257.776

23 206499.716 3334226.693

24 206417.271 3334195.907 DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT

88000

SECTION F
4.0 03-05-23 FOR APPROVAL TBT MCJ VIZE

SEGMENT 1 SEGMENT 2 SEGMENT 3 SEGMENT 4 3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE


20 20980 20 20980 20 20980 20 25000 1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE
REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

3428
1500

800 +7.00m THE CONSTRUCTION OF THE KHOR AL ZUBAIR


OPEN CUT
A B C D E F
IMMERSED TUNNEL PROJECT
3428
4628

4628

4628

4628

4628
1 2 3 1 2 3 1 2 34 1 1 2 3 4 1 2 3 4 +6.00m +6.00m +6.00m
FGP/C-08
1200

1200

1200

1200
+2.369m +2.369m
OPEN CUT AL FAW SIDE
TYPICAL SECTION F
HORIZONTAL & LONGITUDINAL SECTION
SECTION REFERENCE
OPEN CUT TUNNEL : LONGITUDINAL SECTION F
COWI JW HUH

JW KIM 4.0

KAZ-CO-DD-OC-DW-5143
03-05-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

32500 4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
800 30900 800 CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
CONSTRUCTION JOINT

TUNNEL
CONSTRUCTION JOINT ENGINEER.

AXIS
+7.00 OUTER WALL OUTER WALL +7.00
5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED
SHEAR KEY SEE SHEAR KEY SEE AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO

1500

1500
KAZ-CO-DD-OC-DW-5195 KAZ-CO-DD-OC-DW-5195 REINFORCEMENT.
+4.10 DHWL +4.10 DHWL
6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS

3428
6705 2040 6705 6705 2040 6705 PER SUPPLIER'S RECOMMENDATION.

1240

1240
1 670 670 1

4628

150

150
7) FOR MEP CUTOUT & NICHES REFER DRAWING NO.

770

770
10 10
KAZ-CO-DD-MEP-DW-6121 TO KAZ-CO-DD-MEP-DW-6133

1200

450

450
0.00 (AFGP) DETAIL -2- 0.00 (AFGP)
CUT AND COVER CUT AND COVER
DETAIL -2- BOTTOM SLAB BOTTOM SLAB
OPEN CUT IMMERSED TUNNEL OPEN CUT
LEAN CONCRETE THK. 100mm SHEAR KEY SEE SHEAR KEY SEE
1143 900 KAZ-CO-DD-OC-DW-5192 29100 KAZ-CO-DD-OC-DW-5192 900 1143 WATERPROOFING MEMBRANE

33185 AL-FAW SIDE

UMM-QASR SIDE

TYPICAL SECTION F - SEGMENTS 1-2-3-4 TUNNEL REFERENCE


(AT SEGMENT JOINTS L=21m)

SPRAY TYPE MEMBRANE

OPEN CUT
A B C D E F

1 2 3 1 2 3 1 2 34 1 1 2 3 4 1 2 3 4

General Company for Ports of Iraq (GCPI)

300
SHEET MEMBRANE

100
(THK=3.0)

SECTION REFERENCE
DETAIL-2- (NOT TO SCALE) TECHNITAL S.p.A

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT

E
5206
3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

FIRE RESISTANT SEAL


2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

465
465

WATER PROOFING 300 300


MEMBRANE 1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE
140
+6.00 140 ROAD PAVING ROAD PAVING
+6.00
REV. DATE REVISION DETAILS DRAWN CHKD. APPD.
1378 735

1378 735
EXTERNAL SEAL TRELLEBORG
(100 mm THK) (100 mm THK)
A 5206
5206
EXTERNAL SEAL TRELLEBORG

ACME 45V OR SIMILAR


CALAMITY SEAL CALAMITY SEAL

F
THE CONSTRUCTION OF THE KHOR AL ZUBAIR
ACME 45V OR SIMILAR

5207
1550

1550
IMMERSED TUNNEL PROJECT
300
1200

300

SPRAYED
EXTERNAL SEAL
300

300
MEMBRANE
TRELLEBORG AM 350 OR SIMILAR FGP/C-08
2350 8210 5700 5700 8210 2350
WATERSTOP PROFILE FOR
OPENCUT SECTION C+D+E+F
OPEN CUT AL FAW SIDE
TYPICAL SECTION F
SEGMENTS 1-2-3-4
TYPICAL SEGMENT JOINT - CROSS SECTION (OPEN CUT SECTION)

COWI JW HUH

JW KIM 3.0

KAZ-CO-DD-OC-DW-5144
17-02-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
Φ ENGINEER.
Φ
5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED
AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
HORIZONTAL LINKS AROUND WATERSTOP

REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

+7.00

10

General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT

3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE

REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT AL FAW SIDE


TYPICAL SECTION F
REINFORCEMENT SEGMENT 1-2-3-4
SHEET 1 OF 2

COWI JW HUH

JW KIM 3.0

KAZ-CO-DD-OC-DW-5145
17-02-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.

5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

Φ 6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


Φ
PER SUPPLIER'S RECOMMENDATION.

HORIZONTAL LINKS AROUND WATERSTOP

+7.00

10

General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT

3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE

REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT AL FAW SIDE


SECTION F
REINFORCEMENT SEGMENT 1-2-3-4
SHEET 2 OF 2

COWI JW HUH

JW KIM 3.0

KAZ-CO-DD-OC-DW-5211
17-02-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
Φ CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
Φ CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.

HORIZONTAL LINKS AROUND WATERSTOP


5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED
AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT

4.0 03-05-23 FOR APPROVAL TBT MCJ VIZE

3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE


REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT AL FAW SIDE


LONGITUDINAL SECTION F
REINFORCEMENT SEGMENTS 1-2-3
SHEET 1 OF 4

COWI JW HUH

JW KIM 4.0

KAZ-CO-DD-OC-DW-5146
03-05-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.

5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


Φ PER SUPPLIER'S RECOMMENDATION.
Φ

HORIZONTAL LINKS AROUND WATERSTOP

General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT

4.0 03-05-23 FOR APPROVAL TBT MCJ VIZE

3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE


REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT AL FAW SIDE


LONGITUDINAL SECTION F
REINFORCEMENT SEGMENTS 1-2-3
SHEET 2 OF 4

COWI JW HUH

JW KIM 4.0

KAZ-CO-DD-OC-DW-5147
03-05-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.

5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT

2.0 03-05-23 ISSUED FOR REVIEW TBT MCJ VIZE

1.0 17-02-23 ISSUED FOR REVIEW TBT MCJ VIZE

REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT AL FAW SIDE


LONGITUDINAL SECTION F
REINFORCEMENT SEGMENT 4
SHEET 3 OF 4

COWI JW HUH

JW KIM 2.0

KAZ-CO-DD-OC-DW-5221
03-05-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.

5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT

2.0 03-05-23 FOR APPROVAL TBT MCJ VIZE

1.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT AL FAW SIDE


LONGITUDINAL SECTION F
REINFORCEMENT SEGMENT 4
SHEET 4 OF 4

COWI JW HUH

JW KIM 2.0

KAZ-CO-DD-OC-DW-5227
03-05-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.
PLAN VIEW 2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE
DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.

5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

1 6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


- PER SUPPLIER'S RECOMMENDATION.

DETAIL-1

A
- CUT AND COVER CUT AND COVER

OPEN CUT IMMERSED TUNNEL OPEN CUT

AL-FAW SIDE

UMM-QASR SIDE

TUNNEL REFERENCE

1900

2000
CL OF TUNNEL

B
-

General Company for Ports of Iraq (GCPI)


800 20

TECHNITAL S.p.A

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT
STEEL BEARING PLATE
SECTION B

3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

SECTION A 65 65 1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE

REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

100
20 800
100
THE CONSTRUCTION OF THE KHOR AL ZUBAIR

550
750
IMMERSED TUNNEL PROJECT
100
750

FGP/C-08

OPEN CUT AL FAW SIDE


1750

100
125 550 125 SECTION A, B, C, D, E & F
20

SHEAR KEYS
800 BOTTOM SLAB
1000

20
COWI JW HUH
STEEL PLATE 10 THK, BLACK STEEL WITH CORROSION PROTECTION

HEADED STUDS ø16, L = 100mm JW KIM 3.0


SLIDING SURFACE AGAINST OPPOSITE STEEL PLATE
TO BE SURFACED WITH BITUMEN
KAZ-CO-DD-OC-DW-5192
17-02-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.
ELEVATION
DETAIL-1 5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED
AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

1500
1
-

CUT AND COVER CUT AND COVER

OPEN CUT IMMERSED TUNNEL OPEN CUT


A
-

AL-FAW SIDE

UMM-QASR SIDE

1900

2000
TUNNEL REFERENCE

B
-

800 20

General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A

STEEL BEARING PLATE


DAEWOO ENGINEERING &
SECTION B CONSTRUCTION CO., LTD
300 ÷ 500

SECTION A
DESIGN CONSULTANT

65 65

125
100
3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

20 2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE


950 ÷ 1150

400
650
1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE

REV. DATE REVISION DETAILS DRAWN CHKD. APPD.


100
20

650

THE CONSTRUCTION OF THE KHOR AL ZUBAIR

125
IMMERSED TUNNEL PROJECT
125 550 125
20 800 FGP/C-08
800

STEEL PLATE 10 THK, BLACK STEEL WITH CORROSION PROTECTION OPEN CUT AL FAW SIDE
SECTION A & B
HEADED STUDS ø16, L = 100mm
SLIDING SURFACE AGAINST OPPOSITE STEEL PLATE SHEAR KEYS
TO BE SURFACED WITH BITUMEN OUTER WALL

COWI JW HUH

JW KIM 3.0

KAZ-CO-DD-OC-DW-5193
17-02-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
ELEVATION CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.
DETAIL-1
5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED
AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

1500
1
-

A
-

1900

2000
B
-

800 20

General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A

STEEL BEARING PLATE DAEWOO ENGINEERING &


SECTION B CONSTRUCTION CO., LTD
DESIGN CONSULTANT

SECTION A 65 65

125
3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

100
2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE

400
650
REV. DATE REVISION DETAILS DRAWN CHKD. APPD.
650

100

THE CONSTRUCTION OF THE KHOR AL ZUBAIR

125
IMMERSED TUNNEL PROJECT
20 800
125 550 125 FGP/C-08
800

OPEN CUT AL FAW SIDE


STEEL PLATE 10 THK, BLACK STEEL WITH CORROSION PROTECTION SECTION A & B
HEADED STUDS ø16, L = 100mm SHEAR KEYS
SLIDING SURFACE AGAINST OPPOSITE STEEL PLATE INNER WALL
TO BE SURFACED WITH BITUMEN

COWI JW HUH

JW KIM 3.0

KAZ-CO-DD-OC-DW-5194
17-02-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.
ELEVATION DETAIL-1
5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED
AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

1500
1
-

A
-

1100

1200
B
-

800 20

General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A

STEEL BEARING PLATE


SECTION B DAEWOO ENGINEERING &
CONSTRUCTION CO., LTD
300 ÷ 500

SECTION A DESIGN CONSULTANT

65 65

125
100
3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

400
650
20 1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE
950 ÷ 1150

REV. DATE REVISION DETAILS DRAWN CHKD. APPD.


100
20

125
THE CONSTRUCTION OF THE KHOR AL ZUBAIR
650

IMMERSED TUNNEL PROJECT


125 550 125
800 FGP/C-08
20 800

STEEL PLATE 10 THK, BLACK STEEL WITH CORROSION PROTECTION OPEN CUT AL FAW SIDE
HEADED STUDS ø16, L = 100mm SECTION C, D, E & F
SLIDING SURFACE AGAINST OPPOSITE STEEL PLATE SHEAR KEYS
TO BE SURFACED WITH BITUMEN
OUTER WALL

COWI JW HUH

JW KIM 3.0

KAZ-CO-DD-OC-DW-5195
17-02-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

REINFORCEMENT MALE REINFORCEMENT FEMALE 4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT
SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.

5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

ø16s200

12ø16

12ø16

2x8ø25 2x8ø25

ø20s200

12ø16 SECTION A
12ø16
12ø16 ø16s200 ø20s200
ø16s200
A A
12ø16
- 12ø16 -
General Company for Ports of Iraq (GCPI)

2x8ø25

TECHNITAL S.p.A
ø16s200

12ø16

12ø16
DAEWOO ENGINEERING &
CONSTRUCTION CO., LTD
ø16s200
DESIGN CONSULTANT

3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE

REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

CL OF TUNNEL CL OF TUNNEL THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT AL FAW SIDE


SECTION A, B, C, D, E & F
REINFORCEMENT SHEAR KEYS
BOTTOM SLAB

COWI JW HUH

JW KIM 3.0

KAZ-CO-DD-OC-DW-5196
17-02-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.

5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

PRIMARY END. SECTION A


OUTER WALL CUT AND COVER CUT AND COVER

REINFORCEMENT MALE REINFORCEMENT FEMALE OPEN CUT IMMERSED TUNNEL OPEN CUT

AL-FAW SIDE

UMM-QASR SIDE

ø16s200
TUNNEL REFERENCE
10ø16

ø16s200 10ø16

ø16s200 2x8ø25

10ø16
ø16s200
A A
10ø16
- - 10ø16
ø16s200 ø16s200
10ø16 ø16s200 ø16s200
10ø16

10ø16

10ø16
2x8ø25 2x8ø25 General Company for Ports of Iraq (GCPI)
ø16s200
PRIMARY END. SECTION A
INNER WALL

ø16s200 TECHNITAL S.p.A

2x8ø25
DAEWOO ENGINEERING &
CONSTRUCTION CO., LTD
10ø16 DESIGN CONSULTANT

10ø16 ø16s200 ø16s200

3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE

REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT AL FAW SIDE


SECTION A & B
REINFORCEMENT SHEAR KEYS
OUTER & INNER WALL

COWI JW HUH

JW KIM 3.0

KAZ-CO-DD-OC-DW-5197
17-02-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.

5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

CUT AND COVER CUT AND COVER

OPEN CUT IMMERSED TUNNEL OPEN CUT

REINFORCEMENT MALE REINFORCEMENT FEMALE


AL-FAW SIDE

UMM-QASR SIDE

TUNNEL REFERENCE

10ø16

ø16s200 10ø16

ø16s200
PRIMARY END. SECTION A
10ø16
A 10ø16 A
- -
ø16s200

10ø16

ø16s200
10ø16

2x8ø20 2x8ø20
ø16s200
General Company for Ports of Iraq (GCPI)
2x8ø20

10ø16

10ø16 ø16s200 ø16s200 TECHNITAL S.p.A

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT

3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE

REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT AL FAW SIDE


SECTION C, D, E & F
REINFORCEMENT SHEAR KEYS
OUTER WALL

COWI JW HUH

JW KIM 3.0

KAZ-CO-DD-OC-DW-5198
17-02-23
NOTE 1:
NOTES:
FOR WALL REINF. REFER
· SECTION A: KAZ-CO-DD-OC-DW-5151 1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
DRAWINGS INDICATED IN NOTE 1
· SECTION B: KAZ-CO-DD-OC-DW-5158 METRES UNLESS SHOWN OTHERWISE.
B ADDITIONAL ø20s140 NF3/FF3 · SECTION C: KAZ-CO-DD-OC-DW-5165
(EXTEND 2m ON EACH SIDE BEYOND OPENINGS) · SECTION D: KAZ-CO-DD-OC-DW-5171

2.000
- 2x5ø25 2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE
ø25s150 · SECTION E: KAZ-CO-DD-OC-DW-5177 DATUM UNLESS STATED OTHERWISE.

0.650
0.650

(TYP)
· SECTION F: KAZ-CO-DD-OC-DW-5182
(TYP)
3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL
5ø25 5ø25 DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
C DIMENSIONS ONLY - IF IN DOUBT ASK.
5ø16 AT 45⁰ FOR INNER WALL REINF. REFER - 4ø25
5ø16 AT 45⁰
DRAWINGS INDICATED IN NOTE 1 4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT
SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE

ø25s150

0.
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE

55
0
FOR INNER WALL REINF. REFER CONSTRUCTION DRAWINGS TO BE APPROVED BY THE

(T
YP
DRAWINGS INDICATED IN NOTE 1 ENGINEER.

)
A 5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED

650 (TYP)
- AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
0.400 ø16s100 REINFORCEMENT.
(TYP) 650
ø25s150 ø25s150 (TYP)
4ø25 6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS
5ø25 5ø25 PER SUPPLIER'S RECOMMENDATION.
4ø16 AT 45⁰ 4ø16 AT 45⁰

ø16s100
ø25s150 ø20s100 4ø25 4ø250

ø16s100 ø16s100
5ø16 AT 45⁰ D
5ø16 AT 45⁰ 400
5ø25 (TYP)

ø16s100
5ø25
ø20s150

ADDITIONAL ø20s140 NF3/FF3 LEGEND:


2x5ø25
(EXTEND 2m ON EACH SIDE BEYOND OPENINGS)
4ø16 AT 45⁰ 4ø16 AT 45⁰ STRUCTURAL CONCRETE - PRECAST
4ø25
ø25s150
BALLAST CONCRETE
FOR WALL REINF. REFER
DRAWINGS INDICATED IN NOTE 1

(TYP)
ø16s100

650
FIRE BOARD

(T 550
)
WATERSTOP

YP
STRUCTURAL CONCRETE - IN SITU

CONSTRUCTION JOINT
4ø25

B SECTION
- SCALE 1:25 C SECTION - TYP. INNER WALL NICHE OPENING - REINFORCEMENT DETAIL
- SCALE 1 : 20 - SCALE 1:20

ø25s150

400 (TYP)
- TYP. WALL OPENING - REINFORCEMENT DETAIL FOR INNER WALL REINF. REFER ø20s150
- SCALE 1:25 DRAWINGS INDICATED IN NOTE 1
General Company for Ports of Iraq (GCPI)
650 (TYP)

650 (TYP)

TECHNITAL S.p.A
FOR WALL REINF. REFER ø25s150 ø25s150
DRAWINGS INDICATED IN NOTE 1 4ø25 4ø25 ø16s100 4ø25 ø20s100 4ø25 ø16s100
5ø25 5ø25 ø20s100

ø25s150 ø25s150 F SECTION D SECTION


- SCALE 1 : 20
- SCALE 1 : 20
DAEWOO ENGINEERING &
CONSTRUCTION CO., LTD
E
DESIGN CONSULTANT
-
4ø25 ø25s150

FOR WALL REINF. REFER FOR WALL REINF. REFER FOR WALL REINF. REFER
DRAWINGS INDICATED IN NOTE 1 DRAWINGS INDICATED IN NOTE 1 DRAWINGS INDICATED IN NOTE 1
FOR WALL REINF. REFER

0.650 (TYP)
DRAWINGS INDICATED IN NOTE 1 2.0 03-05-23 FOR APPROVAL TBT MCJ VIZE

A SECTION 4ø25
ø25s150 1.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

- SCALE 1:25 REV. DATE REVISION DETAILS DRAWN CHKD. APPD.


600
(TYP) 4ø25
4ø16 AT 45⁰ 4ø16 AT 45⁰
0.400

ø20s100
(TYP) THE CONSTRUCTION OF THE KHOR AL ZUBAIR
F
ø25s150 ø25s150 ø20s150 IMMERSED TUNNEL PROJECT
4ø25
4ø16 AT 45⁰ 4ø16 AT 45⁰
FGP/C-08
650(TYP)

ø25s150
(T 550

4ø25 OPEN CUT UMM QASR


)
YP

REINFORCEMENT
OPENING DETAILS
SHEET 1 OF 2

ø25s150 4ø25 COWI JW HUH


0 0.2 0.4 0.6 0.8 1 2

- TYP. OUTER WALL JUNCTION BOX OPENING - REINFORCEMENT DETAIL E SECTION SCALE 1 : 20 METER
JW KIM 2.0

- SCALE 1:20 - SCALE 1 : 20


0 0.25 0.5 1 1.5 2 2.5
KAZ-CO-DD-OC-DW-5185A
03-05-23
SCALE 1 : 25 METER
NOTE 1: NOTES:
· SECTION A: KAZ-CO-DD-OC-DW-5151 1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
· SECTION B: KAZ-CO-DD-OC-DW-5158 METRES UNLESS SHOWN OTHERWISE.
· SECTION C: KAZ-CO-DD-OC-DW-5165
· SECTION D: KAZ-CO-DD-OC-DW-5171 2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE
· SECTION E: KAZ-CO-DD-OC-DW-5177 DATUM UNLESS STATED OTHERWISE.
· SECTION F: KAZ-CO-DD-OC-DW-5182
3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL
DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.

A 5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


FOR OUTER WALL REINF. REFER 4ø25 AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
-
DRAWINGS INDICATED IN NOTE 1 REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.
FOR OUTER WALL REINF. REFER
DRAWINGS INDICATED IN NOTE 1

1000 (TYP)
ø16s100
1000
(TYP)
4ø25
4ø16 AT 45⁰ 4ø16 AT 45⁰

LEGEND:

ø16s100
ø20s100 4ø25 4ø25
STRUCTURAL CONCRETE - PRECAST

ø16s100 ø16s100 BALLAST CONCRETE


D
400
(TYP)

ø16s100
FIRE BOARD
ø25s150
WATERSTOP

4ø16 AT 45⁰ 4ø16 AT 45⁰ STRUCTURAL CONCRETE - IN SITU


4ø25
CONSTRUCTION JOINT

(TYP)
1000
ø16s100

(T 550
)
YP
4ø25

A SECTION
- SCALE 1:20

- TYP OUTER WALL NICHE OPENING - REINFORCEMENT DETAIL General Company for Ports of Iraq (GCPI)
- SCALE 1:20
NICHE DIM W x H x D = 1500 x 1250 x 400

TECHNITAL S.p.A

FOR INNER WALL REINF. REFER


DRAWINGS INDICATED IN NOTE 1

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT

1000(TYP)
ø25s150
2.0 03-05-23 FOR APPROVAL TBT MCJ VIZE

1.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

ø16s100 4ø25 ø20s100 4ø25 ø16s100

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT
B SECTION
SCALE 1:20 FGP/C-08
-

OPEN CUT UMM QASR


REINFORCEMENT
OPENING DETAILS
SHEET 2 OF 2

COWI JW HUH

JW KIM 2.0

0 0.2 0.4 0.6 0.8 1 2


KAZ-CO-DD-OC-DW-5185B
03-05-23
SCALE 1 : 20 METER
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.
OPEN CUT CUT & COVER
3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL
DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
63000 DIMENSIONS ONLY - IF IN DOUBT ASK.
SECTION A
4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT
SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
SEGMENT 3 SEGMENT 2 SEGMENT 1 PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
20 20980 20 20980 20 20980 20 CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.
2 1 5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED
AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO

1886
2571

2500
2833 2524
2646 2500
REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS

2857
PER SUPPLIER'S RECOMMENDATION.

7) FOR MEP CUTOUT & NICHES REFER DRAWING NO.

900
KAZ-CO-DD-MEP-DW-6121 TO KAZ-CO-DD-MEP-DW-6133

18857
FOUNDATION

11750

11750
CLOSURE WALL

14400

2000
CUT AND COVER CUT AND COVER
SLAB WITH DOOR
THK=1750 OPEN CUT IMMERSED TUNNEL OPEN CUT

800

63000
10240 1500

CUT AND COVER ZONE


400
AL-FAW SIDE

650
1750

1750
650 12000
UMM-QASR SIDE

40914

40914
3200

3200
1900
OPEN CUT TUNNEL 650 TUNNEL REFERENCE
1750

1750
650
10000

400
CLOSURE WALL
MEP NICHES

14400
11750

11750
FOUNDATION (TYP)
SLAB

18857
THK=1750

3000

900

800
11655 1500

400
900
2500 2646

2524 2833
2571

2500
1886

1157
2000

3 4
COORDINATES General Company for Ports of Iraq (GCPI)
53+482.130 53+419.130 X Y

OPEN CUT TUNNEL : SECTION A PLAN 1 204574.445 3333547.319

2 204515.444 3333525.288

3 204529.748 3333486.981
TECHNITAL S.p.A
4 204588.749 3333509.013

63000

SECTION A DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
SEGMENT 3 SEGMENT 2 SEGMENT 1 DESIGN CONSULTANT

20 20980 20 20980 20 20980 20

500 3500
LIGHT ATTENUATION STRUCTURE IS ON HOLD 3000 4.0 03-05-23 FOR APPROVAL TBT MCJ VIZE
ONLY SHOWN INDICATIVERY 3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

SEE BEAM FOR TUNNEL 2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE
3000
ARCHITECTURAL PORTAL 1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE
SPACING = 3.00m REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


1500

+7.00m IMMERSED TUNNEL PROJECT


OPEN CUT
F E D C B A
2000

+6.00m FGP/C-08
4 3 2 1 4 3 2 1 1 43 2 1 3 2 1 3 2 1
13322
11187

800
11899

10240
12610

1500
CUT AND
OPEN CUT UMM QASR SIDE
COVER
ZONE TYPICAL SECTION A
HORIZONTAL & LONGITUDINAL SECTION
1250

MEP NICHES
1752

SECTION REFERENCE
1750

-4.187m
COWI JW HUH

-6.322m JW KIM 4.0

OPEN CUT TUNNEL : LONGITUDINAL SECTION A KAZ-CO-DD-OC-DW-5149


03-05-23
NOTES:
33600
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

BEAM FOR TUNNEL ARCHITECTURAL PORTAL 2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE
DRAWINGS KAZ-CO-DD-OC-DW-5186 TO KAZ-CO-DD-OC-DW-5187 DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
800 14400 650 1900 650 14400 800 CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.
+7.00 +7.00 +7.00

750
5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED
AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO

1500

1500

1500
REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

2040

2040

2040
+4.10 DHWL CONSTRUCTION JOINT +4.10 DHWL
7) FOR MEP CUTOUT & NICHES REFER DRAWING NO.
KAZ-CO-DD-MEP-DW-6121 TO KAZ-CO-DD-MEP-DW-6133
1 GRANULAR FILL 1
OUTER WALL
OUTER WALL
SHEAR KEY SEE
11572 ÷ 9437 10 SHEAR KEY SEE INNER WALL
670 KAZ-CO-DD-OC-DW-5200 10
KAZ-CO-DD-OC-DW-5200

10822 ÷ 8512
SHEAR KEY SEE
13322 ÷ 11187

KAZ-CO-DD-OC-DW-5201 CUT AND COVER CUT AND COVER

400
0.00 (AFGP) 0.00 (AFGP) OPEN CUT IMMERSED TUNNEL OPEN CUT

1250
AL-FAW SIDE
WATERPROOFING MEMBRANE

1250
CONSTRUCTION JOINT CONSTRUCTION JOINT CONSTRUCTION JOINT

3725
UMM-QASR SIDE
-3.30 DLWL 6180 2040 6180 6180 2040 6180 -3.30 DLWL

150

350

150
TUNNEL REFERENCE

175
770

2000

175
450

450
DETAIL -1-

BOTTOM SLAB BOTTOM SLAB


SHEAR KEY SEE SHEAR KEY SEE
LEAN CONCRETE THK KAZ-CO-DD-OC-DW-5199 KAZ-CO-DD-OC-DW-5199
150mm WITH WIRE MESH 2500 ÷ 2571 900 11750 1750 650 1900 650 1750 11750 900 2500 ÷ 2571
Ø5 s200x200 1957 ÷1886 1957 ÷1886

18857 3200 18857


= =

40915

SPRAY TYPE MEMBRANE


OPEN CUT
F E D C B A General Company for Ports of Iraq (GCPI)
TYPICAL SECTION A - SEGMENTS 1-2-3
4 3 2 1 4 3 2 1 1 43 2 1 3 2 1 3 2 1
(AT SEGMENT JOINTS L=21m)
CONCRETE

300
TECHNITAL S.p.A
SHEET MEMBRANE

100
SECTION REFERENCE (THK=3.0)

DETAIL-1- (NOT TO SCALE)


D E
5206 5206 DAEWOO ENGINEERING &

475
CONSTRUCTION CO., LTD
475

+6.00 +6.00
DESIGN CONSULTANT

735
735

300 300
FIRE RESISTANT SEAL

FIRE RESISTANT SEAL

FIRE RESISTANT SEAL


WATER PROOFING

2240 235
235 2240

MEMBRANE
140
140
3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE


GRANULAR FILL 1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE

REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

LEBORG
650 650 650
OR SIMILAR BORG

A
C

EXTERNAL R SIMILAR
SEAL TREL
5206
LE

5206
650
THE CONSTRUCTION OF THE KHOR AL ZUBAIR
SEAL TREL
VAR.

MEP NICHES 400 400 MEP NICHES

VAR.
MEP NICHES 400

O
IMMERSED TUNNEL PROJECT

V
1250

1250

ACME 45
1250
EXTERNAL
ACME 45V

ROAD PAVING
B (100 mm THK) WATERSTOP PROFILE FOR ROAD PAVING
CALAMITY SEAL OPENCUT SECTION A+B (100 mm THK)
1164

1164

5206
FGP/C-08

1164
SPRAYED
F MEMBRANE
CALAMITY SEAL
5207
300

OPEN CUT UMM QASR SIDE

1550
1550

1750

550

TYPICAL SECTION A
300

SEGMENTS 1-2-3

300
300

EXTERNAL SEAL
TRELLEBORG AM 350 OR SIMILAR
SHEET MEMBRANE
2350 9150 1500 3650 3650 1500 9150 2350
COWI JW HUH

JW KIM 3.0

TYPICAL SEGMENT JOINT - CROSS SECTION (OPEN CUT SECTION)


KAZ-CO-DD-OC-DW-5150
17-02-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


Φ
DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
Φ DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


HORIZONTAL LINKS AROUND WATERSTOP
SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONNECTION TO ARCHITECTURAL CONNECTION TO ARCHITECTURAL CONNECTION TO ARCHITECTURAL CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
DRAWINGS KAZ-CO-DD-OC-DW-5188 DRAWINGS KAZ-CO-DD-OC-DW-5188 DRAWINGS KAZ-CO-DD-OC-DW-5188 ENGINEER.
TO KAZ-CO-DD-OC-DW-5191 TO KAZ-CO-DD-OC-DW-5191 TO KAZ-CO-DD-OC-DW-5191
5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED
AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.
+7.00 +7.00
6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS
PER SUPPLIER'S RECOMMENDATION.

10

0.00 (AFGP)

GRANULAR FILL
General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
= = DESIGN CONSULTANT

3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE

REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT UMM QASR SIDE


TYPICAL SECTION A
REINFORCEMENT SEGMENTS 1-2-3
SHEET 1 OF 3

COWI JW HUH

JW KIM 3.0

KAZ-CO-DD-OC-DW-5151
17-02-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

Φ 3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


Φ
DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


HORIZONTAL LINKS AROUND WATERSTOP

SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS


CONNECTION TO ARCHITECTURAL CONNECTION TO ARCHITECTURAL CONNECTION TO ARCHITECTURAL PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
DRAWINGS KAZ-CO-DD-OC-DW-5188 DRAWINGS KAZ-CO-DD-OC-DW-5188 DRAWINGS KAZ-CO-DD-OC-DW-5188 CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
TO KAZ-CO-DD-OC-DW-5191 TO KAZ-CO-DD-OC-DW-5191 TO KAZ-CO-DD-OC-DW-5191 ENGINEER.

5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


+7.00 +7.00 AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

10

0.00 (AFGP)

GRANULAR FILL
General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
= =
DESIGN CONSULTANT

3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE

REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT UMM QASR SIDE


SECTION A
REINFORCEMENT SEGMENTS 1-2-3
SHEET 2 OF 3

COWI JW HUH

JW KIM 3.0

KAZ-CO-DD-OC-DW-5212A
17-02-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

Φ 3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


Φ DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

HORIZONTAL LINKS AROUND WATERSTOP

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
CONNECTION TO ARCHITECTURAL CONNECTION TO ARCHITECTURAL CONNECTION TO ARCHITECTURAL PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
DRAWINGS KAZ-CO-DD-OC-DW-5188 DRAWINGS KAZ-CO-DD-OC-DW-5188 DRAWINGS KAZ-CO-DD-OC-DW-5188 CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
TO KAZ-CO-DD-OC-DW-5191 TO KAZ-CO-DD-OC-DW-5191 TO KAZ-CO-DD-OC-DW-5191 ENGINEER.

5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


+7.00 +7.00 AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

10

GRANULAR FILL
0.00 (AFGP)

General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
= =
DESIGN CONSULTANT

2.0 03-05-23 FOR APPROVAL TBT MCJ VIZE

1.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT UMM QASR SIDE


SECTION A
REINFORCEMENT SEGMENTS 1-2-3
SHEET 3 OF 3

COWI JW HUH

JW KIM 2.0

KAZ-CO-DD-OC-DW-5212B
03-05-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.

5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

Φ
Φ

HORIZONTAL LINKS AROUND WATERSTOP

General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT

4.0 03-05-23 FOR APPROVAL TBT MCJ VIZE

3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE


REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT UMM QASR SIDE


LONGITUDINAL SECTION A
REINFORCEMENT SEGMENTS 1-2-3
SHEET 1 OF 4

COWI JW HUH

JW KIM 4.0

KAZ-CO-DD-OC-DW-5152
03-05-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.

5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

Φ
Φ

HORIZONTAL LINKS AROUND WATERSTOP

General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT

4.0 03-05-23 FOR APPROVAL TBT MCJ VIZE

3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE


REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT UMM QASR SIDE


LONGITUDINAL SECTION A
REINFORCEMENT SEGMENTS 1-2-3
SHEET 2 OF 4

COWI JW HUH

JW KIM 4.0

KAZ-CO-DD-OC-DW-5153
03-05-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.

5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

Φ
Φ

HORIZONTAL LINKS AROUND WATERSTOP

General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT

4.0 03-05-23 FOR APPROVAL TBT MCJ VIZE

3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE


REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT UMM QASR SIDE


LONGITUDINAL SECTION A
REINFORCEMENT SEGMENTS 1-2-3
SHEET 3 OF 4

COWI JW HUH

JW KIM 4.0

KAZ-CO-DD-OC-DW-5154
03-05-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.

5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT

4.0 03-05-23 FOR APPROVAL TBT MCJ VIZE

3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE


REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT UMM QASR SIDE


LONGITUDINAL SECTION A
REINFORCEMENT SEGMENTS 1-2-3
SHEET 4 OF 4

COWI JW HUH

JW KIM 4.0

KAZ-CO-DD-OC-DW-5155
03-05-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


63000 DATUM UNLESS STATED OTHERWISE.

SECTION B 3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.
SEGMENT 3 SEGMENT 2 SEGMENT 1
4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT
20 20980 20 20980 20 20980 20 SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
6 5 CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.

2646 2500
2455 2690
2500
1500 11126
5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED
AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO

800
REINFORCEMENT.

900
400
6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS

1550

900
PER SUPPLIER'S RECOMMENDATION.

900
7) FOR MEP CUTOUT & NICHES REFER DRAWING NO.
MEP NICHES KAZ-CO-DD-MEP-DW-6121 TO KAZ-CO-DD-MEP-DW-6133
(TYP)
FOUNDATION

11750

11750

11750
15200
SLAB

15100
THK=1750
CLOSURE WALL CUT AND COVER CUT AND COVER

OPEN CUT IMMERSED TUNNEL OPEN CUT

1750

1750

1750
AL-FAW SIDE

40491
3200

3200

3200
650 OPEN CUT TUNNEL
UMM-QASR SIDE

1750

1750

1750
TUNNEL REFERENCE
15100

15200
11750

11750

11750
FOUNDATION
SLAB
THK=1750
900
1550

900

900
2690 2455

2500 2646
800
2500

7 8

53+545.130 53+482.130
COORDINATES General Company for Ports of Iraq (GCPI)
X Y

5 204515.497 3333525.089
OPEN CUT TUNNEL : SECTION B 6 204456.496 3333503.058

7 204470.657 3333465.135
TECHNITAL S.p.A
8 204529.658 3333487.167

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
63000
DESIGN CONSULTANT

SECTION B

SEGMENT 3 SEGMENT 2 SEGMENT 1


3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE
20 20980 20 20980 20 20980 20
2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE


1500

800 +7.00m REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

+6.00m +6.00m THE CONSTRUCTION OF THE KHOR AL ZUBAIR


1250

OPEN CUT
11126 EXTERNAL
IMMERSED TUNNEL PROJECT
9288

WALL
9921

2000
10554

11187
F E D C B
MEP NICHES THK=VAR.
4 3 2 1 4 3 2 1 1 43 2 1 3 2 1 3 2 1 1500
FGP/C-08
1752

-2.288m
OPEN CUT UMM QASR SIDE
-4.187m TYPICAL SECTION B
HORIZONTAL & LONGITUDINAL SECTION
SECTION REFERENCE

OPEN CUT TUNNEL : LONGITUDINAL SECTION B COWI JW HUH

JW KIM 3.0

KAZ-CO-DD-OC-DW-5156
17-02-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

33600 2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

800 14400 650 1900 650 14400 800 3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL
DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.
+7.00 +7.00 +7.00

750
4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT
SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS

1500

1500

1500
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.

2040

2040

2040
+4.10 DHWL CONSTRUCTION JOINT +4.10 DHWL
5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED
AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO

GRANULAR FILL
1 1 REINFORCEMENT.

9437 ÷ 7538
OUTER WALL

9187 ÷ 6538
OUTER WALL SHEAR KEY SEE 6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS
11187 ÷ 9288 INNER WALL PER SUPPLIER'S RECOMMENDATION.
10 670 SHEAR KEY SEE KAZ-CO-DD-OC-DW-5200 10
KAZ-CO-DD-OC-DW-5200 SHEAR KEY SEE
KAZ-CO-DD-OC-DW-5201 7) FOR MEP CUTOUT & NICHES REFER DRAWING NO.
KAZ-CO-DD-MEP-DW-6121 TO KAZ-CO-DD-MEP-DW-6133

1250
0.00 (AFGP) CONSTRUCTION JOINT 0.00 (AFGP)
CONSTRUCTION JOINT
CONSTRUCTION JOINT
6180 2040 6180 6180 2040 6180

150

350

150
175
WATERPROOFING MEMBRANE CUT AND COVER CUT AND COVER

770
OPEN CUT IMMERSED TUNNEL OPEN CUT
-3.30 DLWL -3.30 DLWL

2000

175
450

450
1750

AL-FAW SIDE
DETAIL -1-

BOTTOM SLAB BOTTOM SLAB UMM-QASR SIDE

SHEAR KEY SEE SHEAR KEY SEE


LEAN CONCRETE THK KAZ-CO-DD-OC-DW-5199 KAZ-CO-DD-OC-DW-5199 TUNNEL REFERENCE
2500 ÷ 2690 900 11750 1750 650 1900 650 1750 11750 900 2500 ÷ 2690
150mm WITH WIRE MESH
Ø5 s200x200 1746 ÷1555 1746 ÷1555
18646 3200 18646
= =
40491

TYPICAL SECTION B - SEGMENTS 1-2-3


(AT SEGMENT JOINTS L=21m)

SPRAY TYPE MEMBRANE


OPEN CUT
F E D C B A
General Company for Ports of Iraq (GCPI)
4 3 2 1 4 3 2 1 1 43 2 1 3 2 1 3 2 1

CONCRETE

300
TECHNITAL S.p.A
SHEET MEMBRANE
SECTION REFERENCE

100
(THK=3.0)

DETAIL-1- (NOT TO SCALE)


DAEWOO ENGINEERING &
CONSTRUCTION CO., LTD
DESIGN CONSULTANT
D E
- -

465
465

+6.00 +6.00
735

735
300 300
FIRE RESISTANT SEAL

FIRE RESISTANT SEAL

3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

FIRE RESISTANT SEAL


WATER PROOFING
235 2240

235 2240
MEMBRANE 1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE
G

140
ACME 45V SEAL TRELLEBOR

REV. DATE REVISION DETAILS DRAWN CHKD. APPD.


140
OR SIMILAR

LEBORG
650
650 GRANULAR FILL
650
THE CONSTRUCTION OF THE KHOR AL ZUBAIR

EXTERNAL R SIMILAR
EXTERNAL

SEAL TREL
400 MEP NICHES
650
IMMERSED TUNNEL PROJECT
VAR.

VAR.
A
1250

O
C WATERSTOP PROFILE FOR
-

ACME 45V
ROAD PAVING
B (100 mm THK) - OPENCUT SECTION A+B ROAD PAVING
(100 mm THK)
- FGP/C-08
1164

F CALAMITY SEAL CALAMITY SEAL


5207 SPRAYED
MEMBRANE
300

OPEN CUT UMM QASR SIDE


1550

1550
1750

TYPICAL SECTION B
550

300

SEGMENTS 1-2-3
300

300
EXTERNAL SEAL
TRELLEBORG AM 350 OR SIMILAR
SHEET MEMBRANE
2350 9150 1500 3650 3650 1500 9150 2350
COWI JW HUH

JW KIM 3.0

TYPICAL SEGMENT JOINT - CROSS SECTION (OPEN CUT SECTION)


KAZ-CO-DD-OC-DW-5157
17-02-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


HORIZONTAL LINKS AROUND WATERSTOP

SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS


PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.

5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
+7.00 +7.00 REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

10

GRANULAR FILL
0.00 (AFGP)

General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A
= =

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT

3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE

REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT UMM QASR SIDE


TYPICAL SECTION B
REINFORCEMENT SEGMENTS 1-2-3
SHEET 1 OF 2

COWI JW HUH

JW KIM 3.0

KAZ-CO-DD-OC-DW-5158
17-02-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

HORIZONTAL LINKS AROUND WATERSTOP

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.

5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
+7.00 +7.00 REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

10

GRANULAR FILL
0.00 (AFGP)

General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A
= =

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT

3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE

REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT UMM QASR SIDE


SECTION B
REINFORCEMENT SEGMENTS 1-2-3
SHEET 2 OF 2

COWI JW HUH

JW KIM 3.0

KAZ-CO-DD-OC-DW-5213
17-02-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.

5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

Φ
Φ

HORIZONTAL LINKS AROUND WATERSTOP

General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT

4.0 03-05-23 FOR APPROVAL TBT MCJ VIZE

3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE


REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT UMM QASR SIDE


LONGITUDINAL SECTION B
REINFORCEMENT SEGMENTS 1-2-3
SHEET 1 OF 4

COWI JW HUH

JW KIM 4.0

KAZ-CO-DD-OC-DW-5159
03-05-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.

5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

Φ
Φ

HORIZONTAL LINKS AROUND WATERSTOP

General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT

4.0 03-05-23 FOR APPROVAL TBT MCJ VIZE

3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE


REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT UMM QASR SIDE


LONGITUDINAL SECTION B
REINFORCEMENT SEGMENTS 1-2-3
SHEET 2 OF 4

COWI JW HUH

JW KIM 4.0

KAZ-CO-DD-OC-DW-5160
03-05-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.

5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

Φ
Φ

HORIZONTAL LINKS AROUND WATERSTOP

General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT

3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE

REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT UMM QASR SIDE


LONGITUDINAL SECTION B
REINFORCEMENT SEGMENTS 1-2-3
SHEET 3 OF 4

COWI JW HUH

JW KIM 3.0

KAZ-CO-DD-OC-DW-5161
17-02-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.

5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT

3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE

REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT UMM QASR SIDE


LONGITUDINAL SECTION B
REINFORCEMENT SEGMENTS 1-2-3
SHEET 4 OF 4

COWI JW HUH

JW KIM 3.0

KAZ-CO-DD-OC-DW-5162
17-02-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.
84000
2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE
DATUM UNLESS STATED OTHERWISE.
SECTION C
3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL
DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
SEGMENT 4 SEGMENT 3 SEGMENT 2 SEGMENT 1 DIMENSIONS ONLY - IF IN DOUBT ASK.

20 20980 20 20980 20 20980 20 20980 20 4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT
SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
9 PREFERENCE AND TO BE INCORPORATED INTO THE
10 CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE

1342

2455 2690
2500
2712
ENGINEER.

3255
5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED
AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

800
1342

1550
6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS

900

900
PER SUPPLIER'S RECOMMENDATION.

7) FOR MEP CUTOUT & NICHES REFER DRAWING NO.


KAZ-CO-DD-MEP-DW-6121 TO KAZ-CO-DD-MEP-DW-6133

11750
16000

15100
CLOSURE WALL
CUT AND COVER CUT AND COVER

OPEN CUT IMMERSED TUNNEL OPEN CUT

1750
40110

40110
32000

30200

32000

3200
AL-FAW SIDE
650
UMM-QASR SIDE

1750
FOUNDATION
SLAB TUNNEL REFERENCE
THK=1750

15100
16000

11750
MEP NICHES
(TYP)
900

900
1342

1550
800

400
1500 7805

2690 2455
3255
2712

2500
1342

11 12

53+629.130 53+545.130
General Company for Ports of Iraq (GCPI)

OPEN CUT TUNNEL : SECTION C PLAN COORDINATES


X Y

9 204456.544 3333502.873

10 204377.870 3333473.496 TECHNITAL S.p.A


11 204391.897 3333435.929

12 204470.572 3333465.307

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT
84000

SECTION C

SEGMENT 4 SEGMENT 3 SEGMENT 2 SEGMENT 1


3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

20 20980 20 20980 20 20980 20 20980 20 2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE

REV. DATE REVISION DETAILS DRAWN CHKD. APPD.


1500

800 +7.00m
THE CONSTRUCTION OF THE KHOR AL ZUBAIR
OPEN CUT
IMMERSED TUNNEL PROJECT

1250
F E D C B A +6.00m 1500
7805
7167

7697

8228

1200

8758
4 3 2 1 4 3 2 1 1 43 2 1 3 2 1 3 2 1

9288
FGP/C-08
MEP NICHES

-0.167m
OPEN CUT UMM QASR SIDE
1750

TYPICAL SECTION C
1750

-2.288m
HORIZONTAL & LONGITUDINAL SECTION
SECTION REFERENCE

OPEN CUT TUNNEL : LONGITUDINAL SECTION C COWI JW HUH

JW KIM 3.0

KAZ-CO-DD-OC-DW-5163
17-02-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.
33600 2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE
DATUM UNLESS STATED OTHERWISE.
800 32000 800
3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL
DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
+7.00 +7.00 DIMENSIONS ONLY - IF IN DOUBT ASK.
OUTER WALL
OUTER WALL
SHEAR KEY SEE 4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT

1500

1500
SHEAR KEY SEE
KAZ-CO-DD-OC-DW-5202 SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS

TUNNEL AXIS
KAZ-CO-DD-OC-DW-5202 PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE

1240

1240
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
+4.10 DHWL +4.10 DHWL ENGINEER.

7538 ÷ 5417
1 1 5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED
670

9288 ÷ 7167
AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

1250
10 CONSTRUCTION JOINT 10 6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS
CONSTRUCTION JOINT WATERPROOFING MEMBRANE PER SUPPLIER'S RECOMMENDATION.
6980 2040 6980 6980 2040 6980

150
7) FOR MEP CUTOUT & NICHES REFER DRAWING NO.

150
0.00 (AFGP) 0.00 (AFGP)
KAZ-CO-DD-MEP-DW-6121 TO KAZ-CO-DD-MEP-DW-6133

770

770
450

450
1750
DETAIL -1- CUT AND COVER CUT AND COVER

-3.30 DLWL -3.30 DLWL OPEN CUT IMMERSED TUNNEL OPEN CUT
BOTTOM SLAB BOTTOM SLAB
SHEAR KEY SEE SHEAR KEY SEE
2500 ÷ 2712 900 KAZ-CO-DD-OC-DW-5199 30200 KAZ-CO-DD-OC-DW-5199 900 2500 ÷ 2712
LEAN CONCRETE THK AL-FAW SIDE
150mm WITH WIRE MESH 1555÷1342 1555÷1342
Ø5 s200x200 UMM-QASR SIDE
40110

TUNNEL REFERENCE
TYPICAL SECTION C - SEGMENTS 1-2-3-4
(AT SEGMENT JOINTS L=21m)

SPRAY TYPE MEMBRANE


OPEN CUT
F E D C B A

4 3 2 1 4 3 2 1 1 43 2 1 3 2 1 3 2 1

CONCRETE
General Company for Ports of Iraq (GCPI)

300
SHEET MEMBRANE
SECTION REFERENCE

100
(THK=3.0)

DETAIL-1- (NOT TO SCALE)

TECHNITAL S.p.A

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
E
5206 DESIGN CONSULTANT

465
465

300
+6.00 +6.00
1440 735

1440 735
FIRE RESISTANT SEAL
300
140 140 3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE
WATER PROOFING D 2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE
MEMBRANE 5206
G

BORG
ACME 45V SEAL TRELLEBOR

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE


400

LE
235

235
MEP NICHES REV. DATE REVISION DETAILS DRAWN CHKD. APPD.
OR SIMILAR

EXTERNAL R SIMILAR
SEAL TREL
650
A

1164 1250
5206 ROAD PAVING
VAR.

VAR.
O
B ROAD PAVING
EXTERNAL

(100 mm THK)

V
(100 mm THK)
5206
THE CONSTRUCTION OF THE KHOR AL ZUBAIR

45
C 650

ACM E
F CALAMITY SEAL 5206 CALAMITY SEAL
5207 SPRAYED
MEMBRANE
IMMERSED TUNNEL PROJECT

FGP/C-08
1550

1550
1750

300

300
300

300
EXTERNAL SEAL
TRELLEBORG AM 350 OR SIMILAR
SHEET MEMBRANE OPEN CUT UMM QASR SIDE
2350 9150 1500 3650 3650 1500 9150 2350 TYPICAL SECTION C
WATERSTOP PROFILE FOR SEGMENTS 1-2-3-4
OPENCUT SECTION C+D+E+F

TYPICAL SEGMENT JOINT - CROSS SECTION (OPEN CUT SECTION)


COWI JW HUH

JW KIM 3.0

KAZ-CO-DD-OC-DW-5164
17-02-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


Φ
DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
Φ
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
HORIZONTAL LINKS AROUND WATERSTOP

PREFERENCE AND TO BE INCORPORATED INTO THE


CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.

5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

+7.00

10

0.00 (AFGP)

General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT

3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE

REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT UMM QASR SIDE


TYPICAL SECTION C
REINFORCEMENT SEGMENTS 1-2-3
SHEET 1 OF 2

COWI JW HUH

JW KIM 3.0

KAZ-CO-DD-OC-DW-5165
17-02-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

Φ 3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


Φ DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

HORIZONTAL LINKS AROUND WATERSTOP


4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT
SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.

5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.
+7.00

10

0.00 (AFGP)

General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT

3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE

REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT UMM QASR SIDE


SECTION C
REINFORCEMENT SEGMENTS 1-2-3
SHEET 2 OF 2

COWI JW HUH

JW KIM 3.0

KAZ-CO-DD-OC-DW-5214
17-02-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.

5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

Φ
Φ

HORIZONTAL LINKS AROUND WATERSTOP

General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT

4.0 03-05-23 FOR APPROVAL TBT MCJ VIZE

3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE


REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT UMM QASR SIDE


LONGITUDINAL SECTION C
REINFORCEMENT SEGMENTS 1-2-3-4
SHEET 1 OF 3

COWI JW HUH

JW KIM 4.0

KAZ-CO-DD-OC-DW-5166
03-05-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
Φ CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
Φ ENGINEER.

5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


HORIZONTAL LINKS AROUND WATERSTOP

AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO


REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT

4.0 03-05-23 FOR APPROVAL TBT MCJ VIZE

3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE


REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT UMM QASR SIDE


LONGITUDINAL SECTION C
REINFORCEMENT SEGMENTS 1-2-3-4
SHEET 2 OF 3

COWI JW HUH

JW KIM 4.0

KAZ-CO-DD-OC-DW-5167
03-05-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.

5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT

3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE

REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT UMM QASR SIDE


LONGITUDINAL SECTION C
REINFORCEMENT SEGMENTS 1-2-3-4
SHEET 3 OF 3

COWI JW HUH

JW KIM 3.0

KAZ-CO-DD-OC-DW-5168
17-02-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

SECTION D 2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

SEGMENT 1 3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
20 20980 20 DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE

1342
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE

800
1296
13 CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
14 ENGINEER.

5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO

1342
REINFORCEMENT.

900
900
6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS
PER SUPPLIER'S RECOMMENDATION.

7) FOR MEP CUTOUT & NICHES REFER DRAWING NO.


KAZ-CO-DD-MEP-DW-6121 TO KAZ-CO-DD-MEP-DW-6133

CUT AND COVER CUT AND COVER

OPEN CUT IMMERSED TUNNEL OPEN CUT

33492

30900

33492

34683

32000

30200
AL-FAW SIDE

FOUNDATION UMM-QASR SIDE


SLAB
THK=1750
TUNNEL REFERENCE

COORDINATES
X Y

900
13 204378.799 3333470.950

900

1342
14 204359.352 3333463.059

15 204371.070 3333431.675

1296

800
15 16 204390.930 3333438.461

1342
16

53+650.130 53+629.130

General Company for Ports of Iraq (GCPI)

OPEN CUT TUNNEL : SECTION D PLAN

TECHNITAL S.p.A

DAEWOO ENGINEERING &


SECTION D CONSTRUCTION CO., LTD
SEGMENT 1 DESIGN CONSULTANT

20 20980 20

3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

1500
2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE
+7.00m 800
1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE

REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

+6.00m
6161

6711

7167
1200
THE CONSTRUCTION OF THE KHOR AL ZUBAIR
OPEN CUT
F E D C B A
IMMERSED TUNNEL PROJECT
1200

1750

+0.289m
4 3 2 1 4 3 2 1 1 43 2 1 3 2 1 3 2 1 -0.167m
FGP/C-08

OPEN CUT UMM QASR SIDE


TYPICAL SECTION D
OPEN CUT TUNNEL : LONGITUDINAL SECTION D HORIZONTAL & LONGITUDINAL SECTION
SECTION REFERENCE

COWI JW HUH

JW KIM 3.0

KAZ-CO-DD-OC-DW-5169
17-02-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
33600 ÷ 32500
DIMENSIONS ONLY - IF IN DOUBT ASK.

800 32000 ÷ 30900 800 4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT
SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
+7.00 +7.00 CONSTRUCTION DRAWINGS TO BE APPROVED BY THE

TUNNEL AXIS
OUTER WALL ENGINEER.
OUTER WALL

1500
SHEAR KEY SEE

1500
SHEAR KEY SEE 5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED
KAZ-CO-DD-OC-DW-5202 AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
KAZ-CO-DD-OC-DW-5202
REINFORCEMENT.

5417 ÷ 4961

1240

1240
+4.10 DHWL +4.10 DHWL 6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS

7167 ÷ 6711
CONSTRUCTION JOINT CONSTRUCTION JOINT PER SUPPLIER'S RECOMMENDATION.
1 1
6980 2040 6980 6980 2040 6980 7) FOR MEP CUTOUT & NICHES REFER DRAWING NO.
KAZ-CO-DD-MEP-DW-6121 TO KAZ-CO-DD-MEP-DW-6133

150

150
10 670 670 10

770

770
WATERPROOFING MEMBRANE

450

450
1750
0.00 (AFGP) 0.00 (AFGP) CUT AND COVER CUT AND COVER

OPEN CUT IMMERSED TUNNEL OPEN CUT

DETAIL -2- DETAIL -2-


BOTTOM SLAB BOTTOM SLAB
LEAN CONCRETE THK SHEAR KEY SEE SHEAR KEY SEE
150mm WITH WIRE MESH 900 KAZ-CO-DD-OC-DW-5199 30200÷ 29100 KAZ-CO-DD-OC-DW-5199 900 AL-FAW SIDE
Ø5 s200x200 -3.30 DLWL 1342 ÷ 1296 -3.30 DLWL
1342 ÷ 1296 UMM-QASR SIDE

34683 ÷ 33492
TUNNEL REFERENCE

TYPICAL SECTION D - SEGMENT 1


(AT SEGMENT JOINTS L=21m)

SPRAY TYPE MEMBRANE

OPEN CUT
F E D C B A

4 3 2 1 4 3 2 1 1 43 2 1 3 2 1 3 2 1

General Company for Ports of Iraq (GCPI)

300
SHEET MEMBRANE

100
SECTION REFERENCE (THK=3.0)

DETAIL-2- (NOT TO SCALE) TECHNITAL S.p.A

E
5206
DAEWOO ENGINEERING &

465
CONSTRUCTION CO., LTD
465

+6.00 +6.00
DESIGN CONSULTANT
1440 735

1440 735
300 D
300
WATER PROOFING 140 5206 140

FIRE RESISTANT SEAL


MEMBRANE

ROAD PAVING
A B (100 mm THK) ROAD PAVING
(100 mm THK)
5206 5206

EXTERNAL SEAL TRELLEBORG


235

235
650
EXTERNAL SEAL TRELLEBORG

C 3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE


VAR.

VAR.
CALAMITY SEAL 5206 CALAMITY SEAL
5207 650 2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

ACME 45V OR SIMILAR


ACME 45V OR SIMILAR

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE

REV. DATE REVISION DETAILS DRAWN CHKD. APPD.


1550

1550
1750

300

300 SPRAYED
THE CONSTRUCTION OF THE KHOR AL ZUBAIR
300

300
EXTERNAL SEAL
TRELLEBORG AM 350 OR SIMILAR MEMBRANE

2350 8600 5700 5700 8600


SHEET MEMBRANE
2350
IMMERSED TUNNEL PROJECT
WATERSTOP PROFILE FOR
OPENCUT SECTION C+D+E+F
FGP/C-08

TYPICAL SEGMENT JOINT - CROSS SECTION (OPEN CUT SECTION)


OPEN CUT UMM QASR SIDE
TYPICAL SECTION D
SEGMENT 1

COWI JW HUH

JW KIM 3.0

KAZ-CO-DD-OC-DW-5170
17-02-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
Φ
Φ CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.
HORIZONTAL LINKS AROUND WATERSTOP

5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

+7.00

10

0.00 (AFGP)

General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT

3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE

REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT UMM QASR SIDE


TYPICAL SECTION D
REINFORCEMENT SEGMENT 1
SHEET 1 OF 2

COWI JW HUH

JW KIM 3.0

KAZ-CO-DD-OC-DW-5171
17-02-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

Φ 4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


Φ SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
HORIZONTAL LINKS AROUND WATERSTOP
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.

5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

+7.00

10

0.00 (AFGP)

General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT

3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE

REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT UMM QASR SIDE


SECTION D
REINFORCEMENT SEGMENT 1
SHEET 2 OF 2

COWI JW HUH

JW KIM 3.0

KAZ-CO-DD-OC-DW-5215
17-02-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.

5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

Φ
Φ

HORIZONTAL LINKS AROUND WATERSTOP

General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT

4.0 03-05-23 FOR APPROVAL TBT MCJ VIZE

3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE


REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT UMM QASR SIDE


LONGITUDINAL SECTION D
REINFORCEMENT SEGMENT 1
SHEET 1 OF 3

COWI JW HUH

JW KIM 4.0

KAZ-CO-DD-OC-DW-5172
03-05-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.

5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

Φ
Φ

HORIZONTAL LINKS AROUND WATERSTOP

General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT

4.0 03-05-23 FOR APPROVAL TBT MCJ VIZE

3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE


REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT UMM QASR SIDE


LONGITUDINAL SECTION D
REINFORCEMENT SEGMENT 1
SHEET 2 OF 3

COWI JW HUH

JW KIM 4.0

KAZ-CO-DD-OC-DW-5173
03-05-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.

5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT

4.0 03-05-23 FOR APPROVAL TBT MCJ VIZE

3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE


REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT UMM QASR SIDE


LONGITUDINAL SECTION D
REINFORCEMENT SEGMENT 1
SHEET 3 OF 3

COWI JW HUH

JW KIM 4.0

KAZ-CO-DD-OC-DW-5174
03-05-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.
84000
3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL
DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
SECTION E DIMENSIONS ONLY - IF IN DOUBT ASK.

SEGMENT 4 SEGMENT 3 SEGMENT 2 SEGMENT 1 4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT
SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
20 20980 20 20980 20 20980 20 20980 20
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.

1296
5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED
AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO

1143
1500 11122 17 REINFORCEMENT.
18

800
6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS
PER SUPPLIER'S RECOMMENDATION.

400
7) FOR MEP CUTOUT & NICHES REFER DRAWING NO.

900
KAZ-CO-DD-MEP-DW-6121 TO KAZ-CO-DD-MEP-DW-6133
MEP NICHES
(TYP)

CUT AND COVER CUT AND COVER

OPEN CUT IMMERSED TUNNEL OPEN CUT

AL-FAW SIDE

30900

33492

30900
33185
UMM-QASR SIDE

TUNNEL REFERENCE
FOUNDATION
SLAB
THK=1200

MEP NICHES
(TYP)

900

800
1500 7847

400
1143

1296
19 20

General Company for Ports of Iraq (GCPI)


53+734.130 53+650.130

OPEN CUT TUNNEL : SECTION E


X Y

17 204359.332 3333463.051
TECHNITAL S.p.A
18 204280.714 3333433.524

19 204292.321 3333402.440

20 204371.051 3333431.668

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT

84000

SECTION E
3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

SEGMENT 4 SEGMENT 3 SEGMENT 2 SEGMENT 1 2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE


20 20980 20 20980 20 20980 20 20980 20 REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


1500

1500
800 +7.00m 800
OPEN CUT
F E D C B A
IMMERSED TUNNEL PROJECT
1500 7847 1500 11122
4628

4628

4 3 2 1 4 3 2 1 1 43 2 1 3 2 1 3 2 1
5011

5394

MEP NICHES

5778
+6.00m

6161
1250
MEP NICHES FGP/C-08

1250
1200

1200
+2.372m
1200

1200
OPEN CUT UMM QASR SIDE

1200
+0.839m
TYPICAL SECTION E
HORIZONTAL & LONGITUDINAL SECTION
SECTION REFERENCE

OPEN CUT TUNNEL : LONGITUDINAL SECTION E COWI JW HUH

JW KIM 3.0

KAZ-CO-DD-OC-DW-5175
17-02-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
32500
DIMENSIONS ONLY - IF IN DOUBT ASK.

800 30900 800 4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT
SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE

TUNNEL AXIS
MET NICHE +7.00 +7.00 ENGINEER.

OUTER WALL OUTER WALL 5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED

1510

1510
SHEAR KEY SEE SHEAR KEY SEE 400 AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
400 MET NICHE REINFORCEMENT.
KAZ-CO-DD-OC-DW-5202 KAZ-CO-DD-OC-DW-5202

1250

1250
6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS

6161 ÷ 4628
+4.10 DHWL CONSTRUCTION JOINT CONSTRUCTION JOINT +4.10 DHWL PER SUPPLIER'S RECOMMENDATION.

1 6705 2040 6705 6705 2040 6705 1 7) FOR MEP CUTOUT & NICHES REFER DRAWING NO.
KAZ-CO-DD-MEP-DW-6121 TO KAZ-CO-DD-MEP-DW-6133

150

150
770

770
10 10
WATERPROOFING MEMBRANE

1200

450

450
CUT AND COVER CUT AND COVER
0.00 (AFGP) DETAIL -2- 0.00 (AFGP)
OPEN CUT IMMERSED TUNNEL OPEN CUT

DETAIL -2- BOTTOM SLAB BOTTOM SLAB


SHEAR KEY SEE SHEAR KEY SEE
LEAN CONCRETE THK
900 KAZ-CO-DD-OC-DW-5199 29100 KAZ-CO-DD-OC-DW-5199 900
150mm WITH WIRE MESH AL-FAW SIDE
Ø5 s200x200
UMM-QASR SIDE
1296÷1143 1296÷1143
33492 ÷ 33185
TUNNEL REFERENCE

TYPICAL SECTION E - SEGMENTS 1-2-3-4


(AT SEGMENT JOINTS L=21m)

SPRAY TYPE MEMBRANE

OPEN CUT
F E D C B A

4 3 2 1 4 3 2 1 1 43 2 1 3 2 1 3 2 1
General Company for Ports of Iraq (GCPI)

300
SHEET MEMBRANE

100
(THK=3.0)

SECTION REFERENCE
DETAIL-2- (NOT TO SCALE) TECHNITAL S.p.A

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT

3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE


E 2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE
5206 300
475

475
300 1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE
+6.00 400 +6.00 REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

735 1440
1440 735

FIRE RESISTANT SEAL


400
140 140
WATER PROOFING
1250

1250
MEMBRANE MEP NICHES MEP NICHES
ROAD PAVING
B

EXTERNAL SEAL TRELLEBORG


(100 mm THK)
A 5206
ROAD PAVING
(100 mm THK) THE CONSTRUCTION OF THE KHOR AL ZUBAIR
1164

1164
5206
VAR.

VAR.
EXTERNAL SEAL TRELLEBORG

IMMERSED TUNNEL PROJECT

ACME 45V OR SIMILAR


CALAMITY SEAL CALAMITY SEAL

F
ACME 45V OR SIMILAR

5207 NITRILE RUBBER SEAL

1550
1550

FGP/C-08
300
1200

SPRAYED
EXTERNAL SEAL

300
300

MEMBRANE
TRELLEBORG AM 350 OR SIMILAR
OPEN CUT UMM QASR SIDE
2350 8210 5700 5700 8210 2350
TYPICAL SECTION E
WATERSTOP PROFILE FOR
OPENCUT SECTION C+D+E+F SEGMENTS 1-2-3-4

TYPICAL SEGMENT JOINT - CROSS SECTION (OPEN CUT SECTION) COWI JW HUH

JW KIM 3.0

KAZ-CO-DD-OC-DW-5176
17-02-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
Φ CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
Φ
ENGINEER.

5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


HORIZONTAL LINKS AROUND WATERSTOP

AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO


REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

+7.00

10

0.00 (AFGP)

General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT

3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE

REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT UMM QASR SIDE


TYPICAL SECTION E
REINFORCEMENT SEGMENT 1-2-3-4
SHEET 1 OF 2

COWI JW HUH

JW KIM 3.0

KAZ-CO-DD-OC-DW-5177
17-02-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
Φ ENGINEER.
Φ
5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED
AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
HORIZONTAL LINKS AROUND WATERSTOP
REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

+7.00

10

0.00 (AFGP)

General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT

3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE

REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT UMM QASR SIDE


SECTION E
REINFORCEMENT SEGMENT 1-2-3-4
SHEET 2 OF 2

COWI JW HUH

JW KIM 3.0

KAZ-CO-DD-OC-DW-5216
17-02-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.

5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

Φ
Φ

HORIZONTAL LINKS AROUND WATERSTOP

General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT

4.0 03-05-23 FOR APPROVAL TBT MCJ VIZE

3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE


REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT UMM QASR SIDE


LONGITUDINAL SECTION E
REINFORCEMENT SEGMENTS 1-2-3-4
SHEET 1 OF 3

COWI JW HUH

JW KIM 4.0

KAZ-CO-DD-OC-DW-5178
03-05-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.

5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


Φ PER SUPPLIER'S RECOMMENDATION.
Φ

HORIZONTAL LINKS AROUND WATERSTOP

General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT

4.0 03-05-23 FOR APPROVAL TBT MCJ VIZE

3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE


REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT UMM QASR SIDE


LONGITUDINAL SECTION E
REINFORCEMENT SEGMENTS 1-2-3-4
SHEET 2 OF 3

COWI JW HUH

JW KIM 4.0

KAZ-CO-DD-OC-DW-5179
03-05-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.

5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT

2.0 03-05-23 FOR APPROVAL TBT MCJ VIZE

1.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT UMM QASR SIDE


LONGITUDINAL SECTION E
REINFORCEMENT SEGMENTS 1-2-3-4
SHEET 3 OF 3

COWI JW HUH

JW KIM 2.0

KAZ-CO-DD-OC-DW-5226
03-05-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

88000 3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
SECTION F DIMENSIONS ONLY - IF IN DOUBT ASK.

SEGMENT 4 SEGMENT 3 SEGMENT 2 SEGMENT 1 4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT
SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
25000 20 20980 20 20980 20 20980 20 CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.

5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO

1143

1143

1143

1143
343
REINFORCEMENT.
22 21
6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS
PER SUPPLIER'S RECOMMENDATION.

800
7) FOR MEP CUTOUT & NICHES REFER DRAWING NO.

900
KAZ-CO-DD-MEP-DW-6121 TO KAZ-CO-DD-MEP-DW-6133

CUT AND COVER CUT AND COVER

OPEN CUT IMMERSED TUNNEL OPEN CUT

AL-FAW SIDE

30900

33185

30900

33185

30900

33185
UMM-QASR SIDE

TUNNEL REFERENCE
FOUNDATION FOUNDATION
SLAB SLAB
THK=1200 THK=1200

900
800
1143

1143

1143

1143
343

23 24

51+377.870 General Company for Ports of Iraq (GCPI)


51+465.870

OPEN CUT TUNNEL : SECTION F PLAN COORDINATES


X Y
TECHNITAL S.p.A
21 204280.695 3333433.517

22 204198.251 3333402.732

23 204209.857 3333371.648

24 204292.302 3333402.433 DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT

88000

SECTION F 4.0 03-05-23 FOR APPROVAL TBT MCJ VIZE

3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE


SEGMENT 4 SEGMENT 3 SEGMENT 2 SEGMENT 1 2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE


25000 20 20980 20 20980 20 20980 20 REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


3428

1500
OPEN CUT +7.00m 800
F E D C B A
IMMERSED TUNNEL PROJECT

3428
4 3 2 1 4 3 2 1 1 43 2 1 3 2 1 3 2 1
4628

4628

4628

4628

4628
+6.00m +6.00m +6.00m FGP/C-08

1200
1200

1200
1200

+2.369m +2.369m
OPEN CUT UMM QASR SIDE
TYPICAL SECTION F
HORIZONTAL & LONGITUDINAL SECTION
SECTION REFERENCE

OPEN CUT TUNNEL : LONGITUDINAL SECTION F COWI JW HUH

JW KIM 4.0

KAZ-CO-DD-OC-DW-5180
03-05-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

32500 4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
800 30900 800 CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
CONSTRUCTION JOINT

TUNNEL
CONSTRUCTION JOINT ENGINEER.

AXIS
+7.00 OUTER WALL OUTER WALL +7.00 5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED
SHEAR KEY SEE SHEAR KEY SEE AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

1500

1500
KAZ-CO-DD-OC-DW-5202 KAZ-CO-DD-OC-DW-5202
+4.10 DHWL +4.10 DHWL
6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS

3428
6705 2040 6705 6705 2040 6705 PER SUPPLIER'S RECOMMENDATION.

1240

1240
1 670 670 1

4628

150

150
7) FOR MEP CUTOUT & NICHES REFER DRAWING NO.

770

770
10 10
KAZ-CO-DD-MEP-DW-6121 TO KAZ-CO-DD-MEP-DW-6133

1200

450

450
0.00 (AFGP) DETAIL -2- 0.00 (AFGP)
CUT AND COVER CUT AND COVER

DETAIL -2- BOTTOM SLAB BOTTOM SLAB OPEN CUT IMMERSED TUNNEL OPEN CUT

LEAN CONCRETE THK SHEAR KEY SEE SHEAR KEY SEE


150mm WITH WIRE MESH 1143 900 KAZ-CO-DD-OC-DW-5199 29100 KAZ-CO-DD-OC-DW-5199 900 1143 WATERPROOFING MEMBRANE
Ø5 s200x200
33185 AL-FAW SIDE

UMM-QASR SIDE

TUNNEL REFERENCE
TYPICAL SECTION F - SEGMENTS 1-2-3-4
(AT SEGMENT JOINTS L=21m)

SPRAY TYPE MEMBRANE

OPEN CUT
F E D C B A

4 3 2 1 4 3 2 1 1 43 2 1 3 2 1 3 2 1

General Company for Ports of Iraq (GCPI)

300
SHEET MEMBRANE

100
(THK=3.0)

SECTION REFERENCE
DETAIL-2- (NOT TO SCALE)
TECHNITAL S.p.A

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT
E
5206

FIRE RESISTANT SEAL

465
465

WATER PROOFING 300 300


MEMBRANE
140
+6.00 140 ROAD PAVING ROAD PAVING
+6.00
3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE
1378 735

1378 735
B

EXTERNAL SEAL TRELLEBORG


(100 mm THK) (100 mm THK)
A 5206 2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE
5206
EXTERNAL SEAL TRELLEBORG

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE

ACME 45V OR SIMILAR


CALAMITY SEAL CALAMITY SEAL

F REV. DATE REVISION DETAILS DRAWN CHKD. APPD.


ACME 45V OR SIMILAR

5207
1550

1550
300
1200

300
EXTERNAL SEAL
SPRAYED THE CONSTRUCTION OF THE KHOR AL ZUBAIR
300

300
MEMBRANE
TRELLEBORG AM 350 OR SIMILAR
IMMERSED TUNNEL PROJECT
2350 8210 5700 5700 8210 2350
WATERSTOP PROFILE FOR
OPENCUT SECTION C+D+E+F FGP/C-08

TYPICAL SEGMENT JOINT - CROSS SECTION (OPEN CUT SECTION) OPEN CUT UMM QASR SIDE
TYPICAL SECTION F
SEGMENTS 1-2-3-4

COWI JW HUH

JW KIM 3.0

KAZ-CO-DD-OC-DW-5181
17-02-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


Φ SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
Φ PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
HORIZONTAL LINKS AROUND WATERSTOP

ENGINEER.

5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

+7.00

10

General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT

3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE

REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT UMM QASR SIDE


TYPICAL SECTION F
REINFORCEMENT SEGMENT 1-2-3-4
SHEET 1 OF 2

COWI JW HUH

JW KIM 3.0

KAZ-CO-DD-OC-DW-5182
17-02-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.
Φ
Φ
5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED
AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.
HORIZONTAL LINKS AROUND WATERSTOP

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

+7.00

10

General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT

3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE

REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT UMM QASR SIDE


SECTION F
REINFORCEMENT SEGMENT 1-2-3-4
SHEET 2 OF 2

COWI JW HUH

JW KIM 3.0

KAZ-CO-DD-OC-DW-5217
17-02-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


Φ SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
Φ PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
HORIZONTAL LINKS AROUND WATERSTOP

ENGINEER.

5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT

3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE

REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT UMM QASR SIDE


LONGITUDINAL SECTION F
REINFORCEMENT SEGMENTS 1-2-3
SHEET 1 OF 4

COWI JW HUH

JW KIM 3.0

KAZ-CO-DD-OC-DW-5183
03-05-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.

5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

Φ
Φ

HORIZONTAL LINKS AROUND WATERSTOP

General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT

3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE

REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT UMM QASR SIDE


LONGITUDINAL SECTION F
REINFORCEMENT SEGMENTS 1-2-3
SHEET 2 OF 4

COWI JW HUH

JW KIM 3.0

KAZ-CO-DD-OC-DW-5184
17-02-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.

5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

Φ
Φ

HORIZONTAL LINKS AROUND WATERSTOP

General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT

3.0 03-05-23 ISSUED FOR REVIEW TBT MCJ VIZE

2.0 17-02-23 ISSUED FOR REVIEW TBT MCJ VIZE

1.0 12-09-22 ISSUED FOR REVIEW TBT MCJ VIZE

REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT UMM QASR SIDE


LONGITUDINAL SECTION F
REINFORCEMENT SEGMENTS 4
SHEET 3 OF 4

COWI JW HUH

JW KIM 3.0

KAZ-CO-DD-OC-DW-5222
03-05-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.

5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT

2.0 03-05-23 FOR APPROVAL TBT MCJ VIZE

1.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT UMM QASR SIDE


LONGITUDINAL SECTION F
REINFORCEMENT SEGMENTS 4
SHEET 4 OF 4

COWI JW HUH

JW KIM 2.0

KAZ-CO-DD-OC-DW-5228
03-05-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.
PLAN VIEW 2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE
DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.

5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

1 6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


- PER SUPPLIER'S RECOMMENDATION.

DETAIL-1

A
- CUT AND COVER CUT AND COVER

OPEN CUT IMMERSED TUNNEL OPEN CUT

AL-FAW SIDE

UMM-QASR SIDE

TUNNEL REFERENCE

CL OF TUNNEL

1900

2000
B
-

General Company for Ports of Iraq (GCPI)


800 20

TECHNITAL S.p.A

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT

STEEL BEARING PLATE


SECTION B
3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

SECTION A 1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE

65 65 REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

100
100
20 800
THE CONSTRUCTION OF THE KHOR AL ZUBAIR
IMMERSED TUNNEL PROJECT

550

750
FGP/C-08
750

100

OPEN CUT UMM QASR SIDE

100
1750

SECTION A, B, C, D, E & F
20

SHEAR KEYS
125 550 125 BOTTOM SLAB
1000

20 800
COWI JW HUH

JW KIM 3.0
STEEL PLATE 10 THK, BLACK STEEL WITH CORROSION PROTECTION

HEADED STUDS ø16, L = 100mm


SLIDING SURFACE AGAINST OPPOSITE STEEL PLATE KAZ-CO-DD-OC-DW-5199
TO BE SURFACED WITH BITUMEN 17-02-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
ELEVATION CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.
DETAIL-1
5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED
AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

1500
-

CUT AND COVER CUT AND COVER

A OPEN CUT IMMERSED TUNNEL OPEN CUT


-

AL-FAW SIDE

UMM-QASR SIDE

1900

2000
TUNNEL REFERENCE

B
-

800 20

General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A

STEEL BEARING PLATE


SECTION B DAEWOO ENGINEERING &
CONSTRUCTION CO., LTD
SECTION A DESIGN CONSULTANT

65 65

125
100

3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE


300 ÷ 500

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE


20

400

650
1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE
950 ÷ 1150

REV. DATE REVISION DETAILS DRAWN CHKD. APPD.


100
20

650

THE CONSTRUCTION OF THE KHOR AL ZUBAIR

125
IMMERSED TUNNEL PROJECT
125 550 125

20 800 800 FGP/C-08

STEEL PLATE 10 THK, BLACK STEEL WITH CORROSION PROTECTION


OPEN CUT UMM QASR SIDE
HEADED STUDS ø16, L = 100mm SECTION A & B
SLIDING SURFACE AGAINST OPPOSITE STEEL PLATE
TO BE SURFACED WITH BITUMEN
SHEAR KEYS
OUTER WALL

COWI JW HUH

JW KIM 3.0

KAZ-CO-DD-OC-DW-5200
17-02-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
ELEVATION CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.
DETAIL-1 5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED
AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

1500
-

CUT AND COVER CUT AND COVER


A
OPEN CUT IMMERSED TUNNEL OPEN CUT
-

AL-FAW SIDE

UMM-QASR SIDE

1900

2000
TUNNEL REFERENCE

B
-

800 20

General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD

STEEL BEARING PLATE DESIGN CONSULTANT

SECTION B

SECTION A 3.0

2.0
17-02-23

08-12-22
FOR APPROVAL

FOR APPROVAL
TBT

TBT
MCJ

MCJ
VIZE

VIZE
65 65

125
1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE

REV. DATE REVISION DETAILS DRAWN CHKD. APPD.


100

400

650
THE CONSTRUCTION OF THE KHOR AL ZUBAIR
650

IMMERSED TUNNEL PROJECT


100

FGP/C-08

125
20 800

125 550 125


OPEN CUT UMM QASR SIDE
800 SECTION A & B
SHEAR KEYS
INNER WALL
STEEL PLATE 10 THK, BLACK STEEL WITH CORROSION PROTECTION

HEADED STUDS ø16, L = 100mm


SLIDING SURFACE AGAINST OPPOSITE STEEL PLATE COWI JW HUH
TO BE SURFACED WITH BITUMEN
JW KIM 3.0

KAZ-CO-DD-OC-DW-5201
17-02-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ELEVATION ENGINEER.

5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

1500
-

CUT AND COVER CUT AND COVER

A OPEN CUT IMMERSED TUNNEL OPEN CUT


-

1100

1200
AL-FAW SIDE

UMM-QASR SIDE

B
- TUNNEL REFERENCE

800 20

General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A

STEEL BEARING PLATE


SECTION B
DAEWOO ENGINEERING &
SECTION A CONSTRUCTION CO., LTD
65 65

125
DESIGN CONSULTANT

100
300 ÷ 500

400
20

650
3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE
950 ÷ 1150

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE


100
20

REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

125
650

125 550 125


THE CONSTRUCTION OF THE KHOR AL ZUBAIR
IMMERSED TUNNEL PROJECT
20 800 800

FGP/C-08
STEEL PLATE 10 THK, BLACK STEEL WITH CORROSION PROTECTION

HEADED STUDS ø16, L = 100mm


SLIDING SURFACE AGAINST OPPOSITE STEEL PLATE
TO BE SURFACED WITH BITUMEN OPEN CUT UMM QASR SIDE
SECTION C, D, E & F
SHEAR KEYS
OUTER WALL

COWI JW HUH

JW KIM 3.0

KAZ-CO-DD-OC-DW-5202
17-02-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

REINFORCEMENT MALE REINFORCEMENT FEMALE 4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT
SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.

5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

CUT AND COVER CUT AND COVER

OPEN CUT IMMERSED TUNNEL OPEN CUT

AL-FAW SIDE

ø16s200
UMM-QASR SIDE

12ø16 TUNNEL REFERENCE

12ø16

2x8ø25 2x8ø25 SECTION A


12ø16 ø16s200 ø20s200

ø20s200
12ø16

12ø16
2x8ø25
12ø16

ø16s200
A A
- 12ø16 -
General Company for Ports of Iraq (GCPI)
ø16s200

TECHNITAL S.p.A

12ø16

12ø16 DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
ø16s200
DESIGN CONSULTANT

3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE

REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


CL OF TUNNEL CL OF TUNNEL
IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT UMM QASR SIDE


SECTION A, B, C, D, E & F
REINFORCEMENT SHEAR KEYS
BOTTOM SLAB

COWI JW HUH

JW KIM 3.0

KAZ-CO-DD-OC-DW-5203
17-02-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.

5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

PRIMARY END. SECTION A


OUTER WALL CUT AND COVER CUT AND COVER

REINFORCEMENT MALE REINFORCEMENT FEMALE OPEN CUT IMMERSED TUNNEL OPEN CUT

AL-FAW SIDE

UMM-QASR SIDE

ø16s200
TUNNEL REFERENCE
10ø16

ø16s200 10ø16

ø16s200 2x8ø25

10ø16
ø16s200
A A
10ø16
- - 10ø16
ø16s200 ø16s200
10ø16 ø16s200 ø16s200
10ø16

10ø16

10ø16
2x8ø25 2x8ø25 General Company for Ports of Iraq (GCPI)
ø16s200
PRIMARY END. SECTION A
INNER WALL

ø16s200 TECHNITAL S.p.A

2x8ø25
DAEWOO ENGINEERING &
CONSTRUCTION CO., LTD
10ø16 DESIGN CONSULTANT

10ø16 ø16s200 ø16s200

3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE

REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT UMM QASR SIDE


SECTION A & B
REINFORCEMENT SHEAR KEYS
OUTER & INNER WALL

COWI JW HUH

JW KIM 3.0

KAZ-CO-DD-OC-DW-5204
17-02-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.

5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

CUT AND COVER CUT AND COVER

OPEN CUT IMMERSED TUNNEL OPEN CUT

REINFORCEMENT MALE REINFORCEMENT FEMALE


AL-FAW SIDE

UMM-QASR SIDE

TUNNEL REFERENCE

10ø16

ø16s200 10ø16

ø16s200
PRIMARY END. SECTION A
10ø16
A 10ø16 A
- -
ø16s200

10ø16

ø16s200
10ø16

2x8ø20 2x8ø20
ø16s200
General Company for Ports of Iraq (GCPI)
2x8ø20

10ø16

10ø16 ø16s200 ø16s200 TECHNITAL S.p.A

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT

3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE

REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT UMM QASR SIDE


SECTION C, D, E & F
REINFORCEMENT SHEAR KEYS
OUTER WALL

COWI JW HUH

JW KIM 3.0

KAZ-CO-DD-OC-DW-5205
17-02-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


CUT & COVER OPEN CUT DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


63000 DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.
SECTION A
4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT
SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
SEGMENT 1 SEGMENT 2 SEGMENT 3 COLUMNS 1000x800 PREFERENCE AND TO BE INCORPORATED INTO THE
SPACING = 3.00m CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
21000 21000 21000 CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
PRECAST BEAM ENGINEER.
SPACING = 3.00m
5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED
AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO

800

800
2000 3000 3000 1000 REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

900
11750
14400
CUT AND COVER CUT AND COVER

OPEN CUT IMMERSED TUNNEL OPEN CUT

CUT AND COVER ZONE


AL-FAW SIDE

650

1750
UMM-QASR SIDE

33600
1900
OPEN CUT TUNNEL
TUNNEL REFERENCE

1750
650
COLUMNS 1000x650
SPACING = 3.00m

14400

11850
900
800

800
2000 3000 3000 1000

PRECAST BEAM 20mm EXPANSION COLUMNS 1000x800 General Company for Ports of Iraq (GCPI)
SPACING = 3.00m JOINT SPACING = 3.00m
51+780.870 51+717.870

OPEN CUT TUNNEL : SECTION A PLAN


ARCHITECTURAL PORTAL AL-FAW SIDE TECHNITAL S.p.A

63000

SECTION A DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
SEGMENT 1 SEGMENT 2 SEGMENT 3 DESIGN CONSULTANT

21000 21000 21000


500
3500
PRECAST BEAM
3000 SPACING = 3.00m 3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE
CAST IN PLACE 3000 3000 2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE
COLUMNS 3000

2000
1900

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE

1700
1600
1300

1200
1100
4700

3800

900
REV. DATE REVISION DETAILS DRAWN CHKD. APPD.
700
200

200

200
600

500

500
2800

400
300

2300

2300

2100
+7.00m

OPEN CUT THE CONSTRUCTION OF THE KHOR AL ZUBAIR


A B C D E F
IMMERSED TUNNEL PROJECT
1 2 3 1 2 3 1 2 34 1 1 2 3 4 1 2 3 4
OPEN CUT TUNNEL
CUT AND FGP/C-08
COVER
ZONE

OPEN CUT AL FAW SIDE


SECTION A - ARCHITECTURAL PORTAL
SECTION REFERENCE HORIZONTAL & LONGITUDINAL SECTION

COWI JW HUH

OPEN CUT TUNNEL : LONGITUDINAL SECTION A JW KIM 3.0

ARCHITECTURAL PORTAL AL-FAW SIDE


KAZ-CO-DD-OC-DW-5186
17-02-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
OPEN CUT CUT & COVER METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


63000 DATUM UNLESS STATED OTHERWISE.

SECTION A 3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.
SEGMENT 3 SEGMENT 2 SEGMENT 1
COLUMNS 1000x800
SPACING = 3.00m 4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT
21000 21000 21000 SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PRECAST BEAM PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
SPACING = 3.00m CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.

800
800
1000 3000 3000 2000
5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED
AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

14400
CUT AND COVER CUT AND COVER

OPEN CUT IMMERSED TUNNEL OPEN CUT

CUT AND COVER ZONE


650
AL-FAW SIDE

33600

1900
OPEN CUT TUNNEL
UMM-QASR SIDE

650
TUNNEL REFERENCE

COLUMNS 1000x650
SPACING = 3.00m

14400

800
800

1000 3000 3000 2000

COLUMNS 1000x800 20mm EXPANSION PRECAST BEAM


SPACING = 3.00m JOINT SPACING = 3.00m
53+482.130 53+419.130
General Company for Ports of Iraq (GCPI)

OPEN CUT TUNNEL : SECTION A PLAN


ARCHITECTURAL PORTAL UMM-QASR SIDE

TECHNITAL S.p.A

63000

SECTION A
DAEWOO ENGINEERING &
SEGMENT 3 SEGMENT 2 SEGMENT 1 CONSTRUCTION CO., LTD
21000 21000 21000 DESIGN CONSULTANT
500
3500
3000
CAST IN PLACE
PRECAST BEAM COLUMNS
3000 3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE
SPACING = 3.00m
2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE
3000 3000
1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE

9650
8800
REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

7950
7000
2000

1900
1700

1700

6100
1500

1500

5150
4700
4400

4300

4200
3800
3700

3200
3000
2700

2400
2300

+7.00m
OPEN CUT THE CONSTRUCTION OF THE KHOR AL ZUBAIR
F E D C B A IMMERSED TUNNEL PROJECT
4 3 2 1 4 3 2 1 1 43 2 1 3 2 1 3 2 1
FGP/C-08
OPEN CUT TUNNEL
CUT AND
COVER
ZONE
OPEN CUT UMM QASR SIDE
SECTION A - ARCHITECTURAL PORTAL
SECTION REFERENCE HORIZONTAL & LONGITUDINAL SECTION

COWI JW HUH

OPEN CUT TUNNEL : LONGITUDINAL SECTION A JW KIM 3.0

ARCHITECTURAL PORTAL UMM-QASR SIDE


KAZ-CO-DD-OC-DW-5187
17-02-23
NOTES:
SECTION A - ARCHITECTURAL PORTAL. PLAN VIEW 1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

WINDOWS 925x1250 TO BE SEALED ONCE WINDOWS 925x1250 TO BE SEALED ONCE 2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE
THE CONSTRUCTION IS FINISHED. SEE THE CONSTRUCTION IS FINISHED. SEE DATUM UNLESS STATED OTHERWISE.
COLUMNS AND BEAMS CONNECTION SEE COLUMNS AND BEAMS COLUMNS AND BEAMS CONNECTION
20mm EXPANSION JOINT 3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL
DETAIL. CONNECTION DETAIL. DETAIL.
20 DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
16790 16790 DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


925 14150 900 1650 900 14150 925 SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE

800 1000 800


675 CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.

2600

1250
500
500 5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED
AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
675 REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


WINDOWS 900x1250 TO BE SEALED ONCE PER SUPPLIER'S RECOMMENDATION.
THE CONSTRUCTION IS FINISHED. SEE
DETAIL -1- COLUMNS AND BEAMS CONNECTION DETAIL -1- 7) TO SEE THE PLAN VIEW OF ARCHITECTURAL PORTAL ON TOP
DETAIL. OF SEGMENT 9 REFER TO DRAWINGS
DETAIL -2- KAZ-CO-DD-CCT-DW-4560 AND AZ-CO-DD-CCT-DW-4566

SECTION A - ARCHITECTURAL PORTAL. CROSS SECTION CUT AND COVER CUT AND COVER

OPEN CUT IMMERSED TUNNEL OPEN CUT

WINDOWS 900x1250 TO BE SEALED ONCE


WINDOWS 925x1250 TO BE SEALED ONCE THE CONSTRUCTION IS FINISHED. SEE WINDOWS 925x1250 TO BE SEALED ONCE AL-FAW SIDE
THE CONSTRUCTION IS FINISHED. SEE COLUMNS AND BEAMS CONNECTION THE CONSTRUCTION IS FINISHED. SEE
COLUMNS AND BEAMS CONNECTION DETAIL. 20mm EXPANSION JOINT PRECAST BEAMS COLUMNS AND BEAMS CONNECTION UMM-QASR SIDE
DETAIL. DETAIL.
33600
20 TUNNEL REFERENCE
16790 16790
1700

20 mm HIGH-STRENGTH 20 mm HIGH-STRENGTH 20 mm HIGH-STRENGTH

VAR: 1900 to 11350


MORTAR PLATFORM MORTAR PLATFORM MORTAR PLATFORM
VAR: 200 to 9650

CAST IN PLACE
COLUMN 1000x800 COLUMN 1000x650 COLUMN 1000x650 COLUMN 1000x800

CONSTRUCTION JOINT
800 14400 650 1900 650 14400 800

+7.00 +7.00 +7.00

General Company for Ports of Iraq (GCPI)

CONSTRUCTION JOINT
+4.10 DHWL +4.10 DHWL

TECHNITAL S.p.A

CUT & COVER - ARCHITECTURAL PORTAL. CROSS SECTION


DAEWOO ENGINEERING &
CONSTRUCTION CO., LTD
WINDOWS 900x1250 TO BE SEALED ONCE DESIGN CONSULTANT
WINDOWS 925x1250 TO BE SEALED ONCE THE CONSTRUCTION IS FINISHED. SEE WINDOWS 925x1250 TO BE SEALED ONCE
THE CONSTRUCTION IS FINISHED. SEE COLUMNS AND BEAMS CONNECTION THE CONSTRUCTION IS FINISHED. SEE
COLUMNS AND BEAMS CONNECTION DETAIL. 20mm EXPANSION JOINT PRECAST BEAMS COLUMNS AND BEAMS CONNECTION
DETAIL. DETAIL.
33600
4.0 03-05-23 FOR APPROVAL TBT MCJ VIZE
20
3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE
16790 16790
2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE


1700

REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

20 mm HIGH-STRENGTH 20 mm HIGH-STRENGTH 20 mm HIGH-STRENGTH THE CONSTRUCTION OF THE KHOR AL ZUBAIR


VAR: 8730 to 15960

MORTAR PLATFORM MORTAR PLATFORM MORTAR PLATFORM


IMMERSED TUNNEL PROJECT
CAST IN PLACE
COLUMN 1000x800 COLUMN 1000x650 COLUMN 1000x650 COLUMN 1000x800
VAR: 9210 to 16440

FGP/C-08

OPEN CUT
800 14400 650 1900 650 14400 800
SECTION A - ARCHITECTURAL PORTAL
CONSTRUCTION JOINT CROSS SECTION & PLAN VIEW
+7.00 +7.00 +7.00

COWI JW HUH

CONSTRUCTION JOINT
+4.10 DHWL +4.10 DHWL JW KIM 4.0

KAZ-CO-DD-OC-DW-5188
03-05-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.
DETAIL 1. PLAN VIEW INTERNAL COLUMNS CONNECTIONS TO BEAM. DETAIL 1
TYPICAL PRECAST BEAM. GEOMETRY 2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE
DATUM UNLESS STATED OTHERWISE.

2x4 PRESTRESSING THREADED BARS 3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL
Ø47 (1735mm2) EMBEDDED ON CAST IN DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
675 1250 675 PLACE COLUMNS DIMENSIONS ONLY - IF IN DOUBT ASK.

2600 4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
1300 1300 265 240 240 240 265 PREFERENCE AND TO BE INCORPORATED INTO THE

130
265 240 240 240 265 CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
WINDOW TO BE SEALED ONCE THE CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
CONSTRUCTION IS FINISHED ENGINEER.

Ø50

850

540

409
5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED

925
1700

DUCTS ON PRECAST BEAMS TO AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO


ACTIVE ANCHOR

500
REINFORCEMENT.
ARRANGE THE PRESTRESSING BARS

255
TO BE GROUTED AFTER PRESTRESSING 6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS
PER SUPPLIER'S RECOMMENDATION.
PRECAST BEAM

350

1291
WINDOW TO BE SEALED ONCE
THE CONSTRUCTION IS FINISHED
20 mm HIGH-STRENGTH PRECAST BEAM
MORTAR PLATFORM 2x4 PRESTRESSING THREADED BARS
Ø47 (1735mm2) EMBEDDED ON CAST IN
800 1000 800 PLACE COLUMNS OR WALLS

20
CAST IN PLACE COLUMN STEEL GRADE 950/1050 MPa CUT AND COVER CUT AND COVER

HIGH-STRENGTH MORTAR PLATFORM DUCT OUTSIDE DIAMETER: 67mm OPEN CUT IMMERSED TUNNEL OPEN CUT
PLATE DIMENSIONS: 210x235x40 mm
2600
PLATE STEEL GRADE: S355 J0
VAR: 1900 to 11350

INITIAL STRESSING FORCE: 1,457 kN

(SEE NOTE 1)
AL-FAW SIDE

2280
VAR: 200 to 9650

UMM-QASR SIDE

DETAIL 2. PLAN VIEW TUNNEL REFERENCE


CAST IN PLACE COLUMN
1000

675 1250 675

2x3 PRESTRESSING THREADED BARS


Ø47 (1735mm2) EMBEDDED ON CAST IN
PLACE COLUMNS

255 370 370 255

NOTE 1-ANCHORAGE LENGTH:

255 390 255


LENGTH TO BE CONFIRMED WITH THE PRESTREESING

900
+7.00
BARS SUPPLIER.

PRECAST BEAM General Company for Ports of Iraq (GCPI)


WINDOW TO BE SEALED ONCE
THE CONSTRUCTION IS FINISHED INTERNAL COLUMNS CONNECTIONS TO BEAM. DETAIL 2

800 1000 800


TECHNITAL S.p.A
675 1250 675

2600
255 370 370 255
WINDOW TO BE SEALED ONCE THE
CONSTRUCTION IS FINISHED
BEAM-COLUMN CONNECTION DETAIL DAEWOO ENGINEERING &

409
ACTIVE ANCHOR DUCTS ON PRECAST BEAMS TO CONSTRUCTION CO., LTD
ARRANGE THE PRESTRESSING BARS
SEE BEAM SEE BEAM TO BE GROUTED AFTER PRESTRESSING DESIGN CONSULTANT
REINFORCEMENT REINFORCEMENT
WINDOWS TO BE SEALED ONCE THE WINDOWS TO BE SEALED ONCE THE

1291
CONSTRUCTION IS FINISHED CONSTRUCTION IS FINISHED

PRECAST BEAM 3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE


2x3 PRESTRESSING THREADED BARS
Ø47 (1735mm2) EMBEDDED ON CAST IN 2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE
409

409

PLACE COLUMNS OR WALLS 1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE

20
STEEL GRADE 950/1050 MPa REV. DATE REVISION DETAILS DRAWN CHKD. APPD.
HIGH-STRENGTH MORTAR PLATFORM DUCT OUTSIDE DIAMETER: 67mm
PLATE DIMENSIONS: 210x235x40 mm
SEE ADDITIONAL REINFORCEMENT
PLATE STEEL GRADE: S355 J0
UNDER ACTIVE ANCHORS
SEE ADDITIONAL REINFORCEMENT INITIAL STRESSING FORCE: 1,457 kN THE CONSTRUCTION OF THE KHOR AL ZUBAIR

(SEE NOTE 1)
UNDER ACTIVE ANCHORS
IMMERSED TUNNEL PROJECT

2280
FGP/C-08
CAST IN PLACE COLUMN

SEE COLUMN SEE COLUMN OPEN CUT


PRESTRESSING THREADED BARS
REINFORCEMENT REINFORCEMENT SECTION A - ARCHITECTURAL PORTAL
Ø47 (1735mm2) EMBEDDED ON CAST IN
PLACE COLUMNS DETAILS

PRESTRESSING THREADED BARS


Ø47 (1735mm2) EMBEDDED ON CAST IN
PLACE COLUMNS
COWI JW HUH

JW KIM 3.0

NOTE:
REINFORCEMENT IS NOT SHOWN 17-02-23
KAZ-CO-DD-OC-DW-5189
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.

5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


SEE BEAM PER SUPPLIER'S RECOMMENDATION.
SEE BEAM
REINFORCEMENT
REINFORCEMENT

CUT AND COVER CUT AND COVER


SEE BEAM
SEE BEAM
REINFORCEMENT OPEN CUT IMMERSED TUNNEL OPEN CUT
REINFORCEMENT

AL-FAW SIDE

UMM-QASR SIDE

TUNNEL REFERENCE

+7.00 +7.00 +7.00 +7.00

SEE INTERNAL WALL SEE INTERNAL WALL SEE INTERNAL WALL SEE INTERNAL WALL
REINFORCEMENT REINFORCEMENT REINFORCEMENT REINFORCEMENT

General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT

3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE

REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT
SECTION A - ARCHITECTURAL PORTAL
COLUMN REINFORCEMENT

COWI JW HUH

JW KIM 3.0

KAZ-CO-DD-OC-DW-5190
17-02-23
NOTES:
1) ALL DIMENSIONS IN MILLIMETRES AND ALL LEVELS IN
METRES UNLESS SHOWN OTHERWISE.

2) ALL LEVELS ARE IN METRES AND RELATE TO ORDNANCE


DATUM UNLESS STATED OTHERWISE.

3) DO NOT SCALE FROM THIS DRAWING. DO NOT TAKE DIGITAL


WINDOWS TO BE SEALED ONCE THE DIMENSIONS OFF THIS DRAWING. WORK TO FIGURED
CONSTRUCTION IS FINISHED DIMENSIONS ONLY - IF IN DOUBT ASK.

4) THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT


SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS
PREFERENCE AND TO BE INCORPORATED INTO THE
CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.

5) REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED


AT SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
REINFORCEMENT.

6) FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS


PER SUPPLIER'S RECOMMENDATION.

SEE COLUMN 1000x650mm


SEE COLUMN 1000x800mm REINFORCEMENT CUT AND COVER CUT AND COVER
REINFORCEMENT
OPEN CUT IMMERSED TUNNEL OPEN CUT

AL-FAW SIDE

UMM-QASR SIDE

TUNNEL REFERENCE

General Company for Ports of Iraq (GCPI)

TECHNITAL S.p.A

DAEWOO ENGINEERING &


CONSTRUCTION CO., LTD
DESIGN CONSULTANT

3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE

2.0 08-12-22 FOR APPROVAL TBT MCJ VIZE

1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE

REV. DATE REVISION DETAILS DRAWN CHKD. APPD.

THE CONSTRUCTION OF THE KHOR AL ZUBAIR


IMMERSED TUNNEL PROJECT

FGP/C-08

OPEN CUT
SECTION A - ARCHITECTURAL PORTAL
SEE BEAM SEE BEAM
BEAM REINFORCEMENT
REINFORCEMENT REINFORCEMENT

COWI JW HUH

JW KIM 3.0

KAZ-CO-DD-OC-DW-5191
17-02-23
NOTES:
0.475 D E COMPRESSIBLE MATERIAL (CLOSED CELL
- POLYETHYLENE FOAM MIERS MIOTHENE 30 OR SIMILAR)

0.475
- 1. DIMENSIONS ARE IN METERS UNLESS OTHERWISE INDICATED.

2. NO DIMENSION SHOULD BE SCALED FROM THE DRAWING.


+6.00
3. 200 mm GAP ASSUMED FOR GINA JOINT BETWEEN ELEMENTS.
0.735

0.735
0.300

FIRE RESISTANT SEAL

FIRE RESISTANT SEAL


4. THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT
0.300
SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS

FIRE RESISTANT SEAL


PREFERENCE AND TO BE INCORPORATED INTO THE
WATER PROOFING

FIRE RESISTANT SEAL


CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
2.220

2.220
MEMBRANE
0.140 CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.
0.140
5. REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED AT
0.235

0.235

GALLERY SIDE
SITE TO MAINTAIN REQUIRED CONCRETE COVER TO

ROAD SIDE
0.650 0.650 REINFORCEMENT.
GRANULAR FILL 0.650 6. FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS
PER SUPPLIER'S RECOMMENDATION.

0.020
C

LEBORG
A 7. WATERPROOFING SYSTEM FOR BOTTOM SLAB SOFFIT SHALL
- - BE SHEET MEMBRANE AND FOR WALLS & BOTTOM SLAB SIDES
ACME 45V EAL TRELLEBORG

SHALL BE SPRAYED MEMBRANE.

R
SEAL TREL
OR SIMILA
R
6.900

6.900
FIRE RESISTANT SEAL EMSEAL
OR SIMILA

0.650 DFR/WFR CE 50 OR SIMILAR


WATERSTOP PROFILE FOR d=100mm, t=65mm
OPENCUT SECTION A+B RECESS FOR SEAL

L
ACME 45V
ROAD PAVING

A
S

ROAD PAVING d=120mm, w=55mm


B

N
(100 mm THK)
EXTERNAL

(100 mm THK)

R
-

XT E
CALAMITY SEAL CALAMITY SEAL

E
SPRAYED SECTION C

0.300
F MEMBRANE
LEGEND:
5207
RUBBER SEAL RUBBER SEAL
2.0
2.0 STRUCTURAL CONCRETE - PRECAST

0.550
1.550

1.550
7 BALLAST CONCRETE

0.300
1.750
0.300

-
INJECTION POINT
WATERSTOP
0.300

STRUCTURAL CONCRETE - IN SITU

0.300
EXTERNAL SEAL
TRELLEBORG AM 350 OR SIMILAR
CONSTRUCTION JOINT
2.350 9.150 1.500 3.650 3.650 1.500 9.150 2.350 K
WATERSTOP PROFILE FOR 5207
OPENCUT SECTION C+D+E+F SHEET MEMBRANE
VARIABLE **)NOTE
**) NOTE: VARIABLE-PLEAS REFER TO:
TYPICAL SEGMENT JOINT - CROSS SECTION (OPEN CUT SECTION) AL FAW SIDE DW 5113,5120,5127,5133,5139,5244
SINGLE INJECTABLE WATERSTOP
UMMQASR SIDE DW 5120,5157,5164,5170,5176,5181
ROAD PAVEMENT TRELLEBORG W9U-I OR SIMILAR.
INTERNAL SIDE ALIGNED WITH WATERSTOP
AROUND SEGMENT END.
CALAMITY SEAL OIL AND FUEL RESISTANT
ECS-45/45 CJ FIRE RESISTANT SEAL FIRE RESISTANT SEAL
d

RECESS FOR SEAL DFR/WFR CE 50 OR SIMILAR DFR/WFR CE 50 OR SIMILAR


w
w=30mm, d=100mm 0.020
0.020
BALLAST CONCRETE DETAIL 7
2.0
INJECTION POINT RUBBER SEAL 2.0
REFER NOTE 6 TRELLEBORG ACME 45V OR SIMILAR RUBBER SEAL
RECESS FOR SEAL TRELLEBORG ACME 45V OR SIMILAR

2.000
1.900‎
2.000
INJECTION POINT
1.900‎
w=70mm, d=100mm RECESS FOR SEAL
REFER NOTE 6 INJECTION POINT
w=70mm, d=100mm
INJECTION POINT REFER NOTE 6
w REFER NOTE 6
0.800 General Company for Ports of Iraq (GCPI)
0.800

d
d

COMPRESSIBLE MATERIAL (CLOSED CELL 3


POLYETHYLENE FOAM MIERS MIOTHENE 30 OR SIMILAR)
5207
- w
4
0.750

5207
-
DOUBLE INJECTABLE WATERSTOP
TRELLEBORG W29Ui OR SIMILAR
0.020‎

TECHNITAL S.p.A

SECOND CAST FIRST CAST DAEWOO ENGINEERING &


COMPRESSIBLE MATERIAL IN GAP CONSTRUCTION CO., LTD
CLOSED CELL POLYETHYLENE FOAM COMPRESSIBLE MATERIAL
MIERS MIOTHENE 30 OR SIMILAR (CLOSED CELL POLYTHYLENE FOAM
COMPRESSIBLE MATERIAL IN GAP DESIGN CONSULTANT
MIERS MIOTHENE 30 OR SIMILAR)
CLOSED CELL POLYETHYLENE FOAM
BLINDING CONCRETE – NO SOIL MIERS MIOTHENE 30 OR SIMILAR
DOUBLE INJECTABLE WATERSTOP INGRESS FROM BELOW
TRELLEBORG W29Ui OR SIMILAR
CALAMITY SEAL
SECTION B EXTERNAL SIDE OIL AND FUEL RESISTANT CALAMITY SEAL
ECS-45/45 CJ OIL AND FUEL RESISTANT
ECS-45/45 CJ 3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE
RECESS FOR SEAL
w=30mm, d=100mm RECESS FOR SEAL 2.0 28-10-22 FOR APPROVAL TBT MCJ VIZE
EXTERNAL SIDE w=30mm, d=100mm
1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE
d

EXTERNAL SEAL

d
DOUBLE INJECTABLE WATERSTOP w
TRELLEBORG ACME 45V OR SIMILAR ROAD PAVEMENT w REV. DATE REVISION DETAILS DRAWN CHKD. APPD.
TRELLEBORG W29Ui OR SIMILAR RECESS FOR SEAL ROAD PAVEMENT
w=70mm, d=100mm
BALLAST CONCRETE
BALLAST CONCRETE
d

d

SECOND CAST w FIRST CAST


RUBBER SEAL
2.0
w
2.0 THE CONSTRUCTION OF THE KHOR AL ZUBAIR
RUBBER SEAL
TRELLEBORG ACME 45V OR SIMILAR
RECESS FOR SEAL TRELLEBORG ACME 45V OR SIMILAR IMMERSED TUNNEL PROJECT
w=70mm, d=100mm RECESS FOR SEAL
w=70mm, d=100mm BLINDING CONCRETE – NO SOIL
INGRESS FROM BELOW
FGP/C-08
0.020

0.650

OPEN CUT,
BLINDING CONCRETE – NO SOIL 1 BLINDING CONCRETE – NO SOIL
INGRESS FROM BELOW
2 TYPICAL SECTION AT SEGMENT JOINT
INGRESS FROM BELOW
-
5207
- AND SHEAR KEYS OUTLINE

INJECTION POINT
REFER NOTE 6
SECTION D SECTION E DETAIL 1 - SEALS
COMPRESSIBLE MATERIAL
INJECTION POINT
CLOSED CELL POLYETHYLENE FOAM MIERS MIOTHENE 30 OR SIMILAR
REFER NOTE 6 COWI JW HUH
0 0.5 1 2 3 4 5
FIRE RESISTANT SEAL EMSEAL *) NOTE: WHERE THE BOTTOM SLAB SOFFITS ARE NOT
INTERNAL SIDE DFR/WFR CE 50 OR SIMILAR JW KIM 3.0
d=100mm, t=65mm FLUSH A SPECIAL SEAL TYPE "SIKA TRICOSAL SCALE 1 : 50 METER
RECESS FOR SEAL AA320-EDGE-A-TRICOMAR” OR SIMILAR MAY BE APPLIED. 0 0
SECTION A d=120mm, w=55mm 0.2 0.4 0.6 0.8 1 2 0.75 1.5 2.25 3 3.75 7.5
KAZ- CO- DD- OC- DW- 5206
17-02-23
SCALE 1 : 20 METER SCALE 1 : 75 METER
NOTES:
1. DIMENSIONS ARE IN METERS UNLESS OTHERWISE INDICATED.

0.020 2. NO DIMENSION SHOULD BE SCALED FROM THE DRAWING.


0.020 5
STEEL PLATE STEEL PLATE 3. 200 mm GAP ASSUMED FOR GINA JOINT BETWEEN ELEMENTS.
5 10 mm THK -
10 mm THK
- 4. THE MALE AND FEMALE POSITIONS OF THE SEGMENT JOINT
SHEAR KEYS MAY BE ADJUSTED AS PER THE CONTRACTORS

0.010
0.010
APPROVED SEALANT ROAD PAVEMENT PREFERENCE AND TO BE INCORPORATED INTO THE
FOR ROAD (25 mm THK) G H CONTRACTOR'S SITE CONSTRUCTION DRAWINGS. THE SITE
- - CONSTRUCTION DRAWINGS TO BE APPROVED BY THE
ENGINEER.

0.010

0.010
d
5. REINFORCEMENT AT RECESS LOCATIONS TO BE ADJUSTED AT
SEALANT + CALAMITY SEAL w SITE TO MAINTAIN REQUIRED CONCRETE COVER TO
OIL AND FUEL RESISTANT STEEL PLATE STEEL PLATE REINFORCEMENT.
ECS-45/45 CJ 10 mm THK 10 mm THK
RECESS FOR SEAL 6. FINAL POSITION OF INJECTION POINTS TO BE PROVIDED AS
w=30mm, d=100mm PER SUPPLIER'S RECOMMENDATION.
DETAIL 3 - BEARING PLATES DETAIL 4 - BEARING PLATES
BALLAST CONCRETE 7. WATERPROOFING SYSTEM FOR BOTTOM SLAB SOFFIT SHALL
PRINCIPLE APPLICABLE FOR ALL SHEAR KEYS PRINCIPLE APPLICABLE FOR ALL SHEAR KEYS BE SHEET MEMBRANE AND FOR WALLS & BOTTOM SLAB SIDES
INJECTION POINT w SHALL BE SPRAYED MEMBRANE.
REFER NOTE 6

d
2.0 COMPRESSIBLE MATERIAL (CLOSED CELL
RUBBER SEAL POLYTHYLENE FOAM MIERS MIOTHENE 30 OR SIMILAR )
0.800
TRELLEBORG ACME 45V OR SIMILAR
RECESS FOR SEAL 0.020 0.020 0.125 0.550 0.105 0.020
w=70mm, d=100mm STEEL PLATE
BITUMEN SHEET 10 mm THK
COMPRESSIBLE MATERIAL (CLOSED CELL
POLYTHYLENE FOAM MIERS MIOTHENE 30 OR SIMILAR )

0.125
LEGEND:

0.010
0.004

0.024
STRUCTURAL CONCRETE - PRECAST

0.100
BALLAST CONCRETE

0.400

0.650
WATERSTOP

0.002

0.010
SECOND CAST FIRST CAST
STRUCTURAL CONCRETE - IN SITU

0.100
CONSTRUCTION JOINT

0.125
DOUBLE INJECTABLE WATERSTOP 0.065 0.065
TRELLEBORG W29Ui OR SIMILAR
DETAIL 2 BLINDING CONCRETE – NO SOIL
INGRESS FROM BELOW DETAIL 5 - BITUMEN MEMBRANE STEEL PLATE 10 THK, BLACK STEEL WITH CORROSION PROTECTION
HEADED STUDS ø16, L = 100mm
PRINCIPLE APPLICABLE FOR ALL SHEAR KEYS
EXTERNAL SEAL SLIDING SURFACE AGAINST OPPOSITE STEEL PLATE
TRELLEBORG ACME 45V OR SIMILAR TO BE SURFACED WITH BITUMEN SHEET OF 2mm
2.0 THICKNESS (BITUMEN WATERPROOFING MEMBRANE)
RUBBER SEAL COMPRESSIBLE MATERIAL IN GAP
TRELLEBORG ACME 45V OR SIMILAR CLOSED CELL POLYETHYLENE FOAM MIERS MIOTHENE 30 OR SIMILAR
EXTERNAL SEAL
6 TRELLEBORG ACME 45V OR SIMILAR SECTION G
-
0.800 0.020

0.800 0.020
HAUNCH 1.900 1.900 HAUNCH DOUBLE INJECTABLE WATERSTOP
TRELLEBORG W29Ui OR SIMILAR

SINGLE INJECTABLE WATERSTOP


TRELLEBORG W9U-I OR SIMILAR
2.000 7.800 7.800 2.000

HAUNCH HAUNCH
General Company for Ports of Iraq (GCPI)
2.0 2.0
STANDING CROSS CONNECTION BETWEEN
WATERSTOPS IN CONSTRUCTION JOINT
RUBBER SEAL RUBBER SEAL AND SEGMENT JONT
TRELLEBORG ACME 45V OR SIMILAR TRELLEBORG ACME 45V OR SIMILAR

SECTION F
COMPRESSIBLE MATERIAL (CLOSED CELL POLYTHYLENE
FOAM MIERS MIOTHENE 30 OR SIMILAR ) TECHNITAL S.p.A

0.065 0.065
SECTION K
0.100

SOFT BOARD OF 20MM


DAEWOO ENGINEERING &
0.100

CONSTRUCTION CO., LTD


DESIGN CONSULTANT
0.750

0.550

0.020 0.125 0.550 0.105 0.020


J
0.020

3.0 17-02-23 FOR APPROVAL TBT MCJ VIZE


-
0.100

2.0 28-10-22 FOR APPROVAL TBT MCJ VIZE


90°
BOND BREAKER 1.0 12-09-22 FOR APPROVAL TBT MCJ VIZE
0.125

0.065 0.065
0.101

REV. DATE REVISION DETAILS DRAWN CHKD. APPD.


0.100

0.125‎ 0.550 0.125


THE CONSTRUCTION OF THE KHOR AL ZUBAIR
0.400
0.020

0.650

IMMERSED TUNNEL PROJECT


0.100

DETAIL OF DIFFERENT THICKNESS SLABS FGP/C-08


0.125

STEEL PLATE STEEL PLATE


10 mm THK 10 mm THK STEEL PLATE *) NOTE
BETWEEN SEG D-1 and SEG E-1 WHERE THE C&C SLAB MEETS THE RAMP SUMP WALL, A SPECIAL SEAL OPEN CUT,
10 mm THK
TYPE "CLAMPED TYPE SIKA TRICOSAL AA-EDGE-A-TRICOMAR" OR SIMILAR MAY BE APPLIED TYPICAL SECTION AT SEGMENT JOINT
AND SHEAR KEYS DETAILS
COMPRESSIBLE MATERIAL (CLOSED CELL
POLYETHYLENE FOAM MIERS MIOTHENE 30 OR SIMILAR) 0 0.02 0.04 0.06 0.08 0.1 0.2
BITUMEN SHEET
STEEL PLATE 10 THK, BLACK STEEL WITH CORROSION PROTECTION
HEADED STUDS ø16, L = 100mm SCALE 1 : 2 METER
SLIDING SURFACE AGAINST OPPOSITE STEEL PLATE 0 0.2 0.4 0.6 0.8 1 2 COWI JW HUH
TO BE SURFACED WITH BITUMEN SHEET OF 2mm
THICKNESS (BITUMEN WATERPROOFING MEMBRANE) JW KIM 3.0
SCALE 1 : 20 METER
0 0.1 0.2 0.3 0.4 0.5 1
DETAIL 6 SECTION H SECTION J KAZ- CO- DD- OC- DW- 5207
17-02-23
SCALE 1 : 10 METER

You might also like