You are on page 1of 1

Title: Revision No: Doc.

No: Date Effective:


1 REL-HSEQ-GS-001 6TH January, 2020
WORKSHOP INSPECTION Prepared By: Approved by: Page:
CHECKLIST HSEQ MANAGING DIRECTOR 3 of 3

Is the immediate surrounding free of debris


and dirts?

Are waste generated properly segregated and


disposed?

Is workers cloak room well ventilated and


lighted?

ELECTRICAL
Electrical equipment tested, tagged and in
date?

All power leads, outlets and switches are in


good condition(not broken)

Extension leads/power boards are used as


designed(no makeshift, overloading)

OTHER COMMENTS

You might also like