DOC NO : GGCP-04-I0-GS-001-KE
CONTRACTOR :
REV :0
DISTRIBUTION ORDER
CONSTRUCTION MANAGER
PROCUREMENT MANAGER
SHE MANAGER
QC MANAGER
CHIEF ENGINEERING
Page :2/7
JOB NO. : 5715
REV :0
TABLE OF CONTENT
Page :3/7
JOB NO. : 5715
REV :0
1. GENERAL
1.1. This project specification establishes the general requirements to be met in the
selection, design and installation of the instrumentation for “Pekerjaan Outside
Battery Limit (OSBL) Gresik Gas Cogeneration Plant” Project PT Pupuk
Indonesia Energi.
1.2. If there are any conflicts or differences between this specification and the
individual instrument data sheet or drawing, the data sheets or drawings shall
have priority.
1.3. If there are any special requirement and/or difference from this specification,
supplement specification will be issued separately.
2.2. Materials
American Society for Testing and Materials (ASTM) and/or equivalent.
Page :4/7
JOB NO. : 5715
REV :0
2.6. Thermowells
Per Attachment-III Fabrication Drawing of Thermo wells.
Page :5/7
JOB NO. : 5715
REV :0
Page :6/7
JOB NO. : 5715
REV :0
Page :7/7