Professional Documents
Culture Documents
WEEK-2
Introduction to IoT, Communication Standards & Protocols
Theory Practical
• What is Industry 4.0 and stages of industrial revolution
• Horizontal and Vertical Deployment across plant and
benefits
• Understanding Hardware Requirement for switchgear
• Understanding on IoT/IIoT with case study
communication
• AR/VR Technologies
• Converter Types- Modbus to Ethernet and Modbus to USB
• Introduction and Types of Industrial Communication
• Understanding Modbus tools – Modscan
• Basics of Serial Communication
• Testing, debugging and understanding wiring requirement
• Standards of communication - Wired RS232, RS485,
Ethernet
• Communication Protocols – Modbus, Profibus
Switchgear Integration
Theory Practical
• Understanding the communication in Switchgear i.e. • Communication with ACB & Releases
ACB, MCCB, Meters, Relays • Communication with MCCB & Releases
• Understanding the communication of Variable • Communication with Final Distribution Devices, i.e. MCB,
Frequency Drive (VFD) Contactor, Energy Meters
• Controlling and setting of various parameters of VFDs
Campus to Corporate program
Overview of Industrial Automation, Smart Switchgear & Integration with HMI
Theory Practical
Automation Overview
• Different Types of Automation • Communication with Protection relays & iMCC
• Advantages and Disadvantages of Automation • Communication with Multifunction Meter
• Automation System Hierarchy & Topologies • HMI Programming & integration with PLC
• Understanding HMI • HMI Integration with smart switchgear (Relay, CBs, Meters)
• Need and Functions of HMI • Remote Operation of Smart Switchgear through HMI and mobile
• Smart Panel
Introduction to group project
Overview of Energy and Power Management Solutions
Theory Practical
• Understanding Energy Management Solutions (EMS) &
• Demo & Hands-on of Energy Management Software
Interfacing of Meter with EMS
• Demo of SmartComm Power Management Software
• Understanding SCADA platforms
• Post Quiz
• Visit to Smart Manufacturing Factory and witnessing the Automatic Processes of Switchgear Manufacturing.
Project Preparation
Project Presentation
Certificate Distribution and Closing Ceremony
Terms & Conditions:
a) Participants will receive written confirmation of their registration, after which they should
plan their journey to the training center.
b) All programs are conducted on a 'best effort' basis.
c) Participants are expected to make their own arrangements for lodging, boarding & Local conveyance.
Contact Details: