Professional Documents
Culture Documents
International
Acquisition
PT Rekadaya
Elektrika Consult
Reorganization
PLNE transforms into
a more agile and is
now ready to develop
104 CoE
Construction Services Expertise
50
Risk
Co
Investment Exposure joined PLNE to its organization and
E Management Certification
Established 1. CNG Plant ANSI/TIA-942 Rated support the National Construction Services (QRMA, QRMP)
people to face the
PLNE was Development 4 Certificate in SEA; Business Process disruptions and • National Agency for
founded to tap 2. Main in cooperation with within the
Development Institute (LPJK)
digitalization Professional Certification
market of Transmission Fichtner, GIZ, and Engineering challenges
56
Engineering in Material STEAG scope (BNSP)
National Manufacturer
Company
• Professional Certification
Electricity CoE Institute Risk
2002 2015 2019 2022 2023 Electrical Engineering Competency Management (LSPMR)
Direktorat Jendral
Ketenagalistrikan
59 CoE
Primary Energy Transmission Line
42 CoE
Engineering Certification
Certification of Competency for
Procurement of Goods/Services PT
PLN (Persero)
Indonesian Engineers Association
(PII) PT PLN (Persero) PUSDIKLAT
Power Generation Power Distribution
40 CoE
1 CoE
Government Goods/Services
Managed Services Business Consultancy OHS Practitioner and Auditor Procurement Competency
Ministry of Employment Republic of Certification National Agency for
Indonesia (Kementrian Professional Certification
Ketenagakerjaan) (BNSP)
www.plne.co.id
|
Prestigious RE Projects
Sumatra Utara Kalimantan Barat Sulawesi Utara
Consultancy Services for Co-firing 1.Consultation Service for Supervisi Desain dan Supervisi
Steam Coal Power Plant (PLTU) Design Supervision and PLTU Konstruksi PLTS Sangihe
Pangkalan Susu 3&4 (2x200) Design Parit Baru 2x50 MW
and Construction Supervision Construction
2. Engineering Design for Bio
Mass Power Plant
Aceh
1.Construction
Consultation and
Supervision Service
and QA/QC Project
PLTMG Arun 184 MW
2. IMIA
Kalimantan Selatan
Sumatra Selatan Survei, Kajian Enjiniring, dan HPE Sulawesi Selatan
1.Supervisi Konstruksi PLTB Tanah Laut Supervisi Desain dan Supervisi
SUTET 275 kV Konstruksi PLTS Selayar
2.Civil Engineering
Improvement of Musi
HEPP Papua
Studi Potensi, Demand Creation,
Jawa Barat dan Video Teaser DAS Mamberamo
Jasa Konsultan Update Desain,
Supevisi Desain dan Supervisi Jawa Barat Jawa Timur NTT
Konstruksi PLTA Upper Cisokan Consultancy Services for Hydro Design Review Proyek Supervisi Desain dan Supervisi
Pumped Storage (4x260 MW) Power Plant (PLTA) Jatigede 2 x 55 Add On Grati Blok II Konstruksi PLTB Timor
MW Design and Construction
Supervision
www.plne.co.id
|
Tantangan dan kondisi Energi Terbarukan di Indonesia
Tahun 2025 bauran 23% Tahun 2022 baru a. Pemanfaatan potensi EBT yang rendah
pada tahun 2025 (PP No mencapai bauran
b. Pendanaan tidak mencukupi
79 Tahun 2014) 14,11%
c. Hambatan peningkatan EBT
Target kapasitas energi terbarukan adalah 12,9 d. Ketergantungan pada bahan bakar fosil
GW pada tahun 2023, 21 GW pada tahun 2030,
dan 45 GW pada tahun 2045
www.plne.co.id
|
Pengembangan
Cluster Industri
berbasis Energi
Hijau
01 DAS Mamberamo
IMIA
Konsep Green Industrial Cluster di Indonesia
SMART Approach
as the accelerator
+
Smart Water Smart Waste Smart Energy
Management Management
Green Industrial Estate
(Mamberamo + 3,000 ha)
Smart
Information
+
Green Integrated
Governance Application
www.plne.co.id
|
IMIA – Green Industrial Cluster
www.plne.co.id
|
PLN siap memanfaatkan potensi energi alam terbesar di Asia Tenggara
24 GW
Potensi energi hijau dari tenaga air
670 km
Estimasi Panjang sungai Mamberamo dari Hulu ke Hilir
5.500 m3/detik
Debit andalan sungai Mamberamo
www.plne.co.id
|
Green Ammonia Hydrogen
Production Plant
Fuel Cell
Manufacture
Port
Hydrogen
Storage Tank
Mamberamo
Technopolis 200 ha
Integrated Hydrogen Industrial Park Pilot Project
Tahap 1-3.000
ha
Mamberamo
Technopolis
Integrated Hydrogen Industrial Park
www.plne.co.id
|
Pengembangan Strategis di Wilayah Papua
• Wilayah Papua terdiri dari 3 Pusat Kegiatan Strategis Nasional (PKSN) yaitu: PKSN
DPP Raja Ampat Jayapura, PKSN Tanah Merah dan PKSN Merauke dimana menjadi prioritas dalam
pengembangan ekonomi kawasan perbatasan berbasis komoditas unggulan.
KPPN Agropolitan
Kota Baru Sidey DPP Biak
Sorong • Berdasarkan RPJMN 2020-2024 proyek prioritas di Wilayah Papua difokuskan pada
pengembangan sektor industri, pariwisata, aksesibilitas antar wilayah dan Kota Baru
KEK Sorong Sorong.
DAS Mamberamo • Dalam pengembangan sektor industri, terdapat rencana pengembangan industri
Raya
PKSN Jayapura pengolahan yang difokuskan di KEK Sorong dan KI Bintuni.
KI Teluk Bintuni
• Pengembangan destinasi pariwisata alam, budaya dan sejarah difokuskan pada
Destinasi Pariwisata Prioritas (DPP) Raja Ampat dan sekitarnya serta DPP Biak –
Teluk Cenderawasih.
• Secara eksisting akses jalan di Wilayah Papua belum saling terhubung. Namun terdapat
rencana pengembangan Jalan Trans Papua yang akan menghubungkan
SKPT Timika pusat-pusat pertumbuhan dari Merauke hingga Sorong. Pengembangan jalan Trans
Papua ini diharapkan dapat mempermudah akses dan meningkatkan pertumbuhan
PKSN Tanah Merah ekonomi.
• Adanya arahan Presiden untuk fokus mengembangkan Energi Baru Terbarukan (EBT) di
DAS Mamberamo Raya yang memiliki potensi supply listrik 24.000 MW. (Sumber:
https://www.pajak.com/ekonomi/jokowi-pengembangan-ebt-fokus-di-dua-proyek-plta/)
LEGENDA
N
0 5
Ulsan Industrial Park, Korea Selatan Pemanfaatan Teknologi Hijau dalam proses produksi
industri seperti sistem pengolahan limbah organik, dan
sistem manajemen energi yang terintegrasi.
N0 2 5 10
www.plne.co.id
|
Pengembangan Mamberamo Technopolis
sebagai Integrated Industrial Park
KONTEKS GOALS
Konteks Nasional & Internasional
www.plne.co.id
|
Pengembangan Mamberamo Technopolis menggunakan ESG Framework
Sebagai bentuk kepatuhan berbasis lingkungan, sosial, dan tata kelola yang baik
www.plne.co.id
|
Usulan Milestone Perencanaan Kawasan
TRANSISI ENERGI
Roadmap Dekarbonisasi PLN
Pembangkit EBT
29%
dari bauran Energi
Tahap
Perencanaan
Tahap
Pembangunan
Tahap
Operasional
Pilot
Project Fase 1 Fase 2 Fase 3 Fase 4
(200 ha) (3000 ha) (7000 ha) (10.000 ha) (10.000 ha)
www.plne.co.id
|
Shifting Kendaraan
berbasis
combustion ke
listrik
02 Anak Bangsa
Kendaraan Listrik Nusantara oleh
Inisiatif PLN untuk Pengembangan EV
Inisiatif No.13
“Electric Vehicle Infrastructure”
www.plne.co.id
|
RIVERA (Electric Vehicle Nusantara)
Project Rivera : Produk Mobil Nasional yang diprakarsai oleh PLN sebagai pihak yang paling tepat untuk mengeksekusi pengembangan EV di
tanah air secara end to end dimana lingkup Enjiniring dan Teknologinya dikerjakan oleh PLNE
Peran PLNE
www.plne.co.id
|
Kajian dan Data Pendukung
www.plne.co.id
|
Kerja Sama dalam Penyediaan SPBKLU dan Battery pada Pilot Project EV
Marine di Cilacap
www.plne.co.id
|
Enjiniring Ketenagalistrikan dalam EV Industry
www.plne.co.id
|
Sekian dan
Terima Kasih!