You are on page 1of 2

127

To
Jelong China Upper Tamakoshi
Legend: Under
INTEGRATED NEPAL POWER SYSTEM Chilime HEP
Bhotekoshi HEP
456MW
Existing Construction Planned Voltage Level
400kV

Nepal Electricity Authority


Chilime
TRANSMISSION/PROJECT MANAGEMENT DIRECTORATE

7X53.33 MVA 22MW


(Existing & Under Construction Transmission Line Projects) 50 MVA
36MW
Singati
Khimti HEP New Khimti
220kV
Samundratar To
30MVA
39km, 150 sq mm

3X66.67 MVA
Trishuli 3A
Lapsiphedi
(Last Revision: July 2019) 60 MVA Ratmate Garjyang 132kV

31km,100 sq mm
30MVA
7X53.33 MVA
66kV
60MW
50 MVA
Dharapani 60MW
Trishuli HEP Devighat HEP Okhaltar Lamosangu
Trishuli 3B HUB
Borang
4.56km,150 sq mm 26.5km, 100 sq mm 2.8km, 500 sq mm
Undgrd Cable 30MVA 33kV
48 km, 250 sq mm
24MW
14.1MW
Barhabise

48km, 250 sq mm
11kV
Chapali
29km, 100 sq mm

Changunarayan Indrawati HEP 4.56km, 0.15 sq in 4.56km, 0.15 sq in 4.56km, 0.15 sq in


Kudi Kritipur New Chabel 3X22.5MVA 5km, 100 sq mm 2X49.5 MVA
30 MVA
Length,Conductor Size
Lapan Bhaktapur 7.5MW
48km, 2XBISON

10 MVA 11km, 250 sq mm


Banepa

2X22.5 MVA
49.5 MVA
11km, 250 sq mm
Dana 12km, 250&100 sq mm
132kV Substation
Udipur
Lainchour 22.5MVA
Indrawati 10 MVA Sunkoshi
To Balaju
2km, 200 sq mm
2X22.5MVA 7.7km, 800 sq mm UG Cable
HEP 220kV Substation
Dada Khet

28km,95 sq mm
Lapsiphedi

8km, 120 sq mm
2X22.5MVA 45 MVA
11km, 120 sq mm 11km, 120 sq mm
New Modi 2.7 km, 120 sq mm 2X18MVA
400kV Substation

7km, 150 sq mm
10.05MW
Lower Modi HEP Modi HEP
7 km,150 sq mm 4X18MVA
Baneshwor

4.9km, 250 sq mm
Upper Mar-A HEP Patan 10MVA
29km, 120 sq mm
NEA's Power Plant
Rahughat Ratmate
20 km, 250 sq mm

From Tanakpur 10MW 14.8MW


Panchkhal

2.8km,XLPE 500 sq mm
Chameliya HEP Nalsing Gadh 4.1 km, 250 sq mm
50MW
Switchatar IPP's Power Plant
37km, 250 sq mm

Mahendranagar 250 MVA


Lahachwok 75 km, 2X BISON
2X15 MVA
2X18MVA 3X37 MVA Tumlingtar
30MVA 2X22.5MVA
7.5 MVA
30MW Kusma 8 MVA
Mid. Sitalpati
7X33.33MVA
2X30MVA
37km, 250 sq mm

45 km, 250 sq mm

29km, 150 sq mm
Bafikot
2X30 MVA
Dhungesangu
7km,150 sq mm

Pokhara Mar. HEP Matatirtha Teku 2X22.5MVA


Burtibang To New Hetauda 30MVA 30MVA Kabeli
131km
30 MVA Birauta 69MW
22.5MVA
K-3 30MVA

Markhi Chowk
Attariya 2X30 MVA 30 MVA
Syaule 30MVA 3 MVA

36km, 250 sq mm
8 MVA 30 MVA
16.6 MVA 22.5MVA
Jumla

84km, 300 sq mm

13.33 km, 250 sq mm


KL-II HEP Tingla
38km, 250 sq mm

45km,150 sq mm
Lekhnath 40 km, 250 sq mm Kabeli HEP
Madichaur KL-I HEP
30 MVA
Syangja 30 MVA
30MVA
8MVA Baneswor
2X30MVA 7X33.33MVA Basantapur 37MW
Pahalmanpur 8 MVA 32MW
30MVA
Paudi Amrai 18km, 250 sq mm
KL-III HEP

A Year Book-Fiscal Year 2018/2019 (2075/2076 BS)


2X30MVA

16km, 150 sq mm
30 MVA Dailekh 48km, 300 sq mm
Damauli (16.6+3)MVA
60MW

8km,250 sq mm
8 MVA
Jhimruk HEP To Ratmate Phidim 20 MVA
35km, 250 sq mm

30 MVA
Marsyangdi HEP 2X100MVA
2X63MVA
3X315MVA
3 MVA
Mai Khola
Tamghash New Damauli Dharan

42.68 km, 250 sq mm


39km, 150 sq mm 69MW 14MW Puwa HEP
Hapure
12MW KG-A HEP 15.6MW

Inaruwa
Surkhet

25km, 300 sq mm
30 MVA Mai Cascade
Sandikharka 8 MVA Ilam
Lamki 2X15 MVA
16.6 MVA
30 MVA 144MW Hongsi
2X100MVA
10 MVA
3X315MVA
6.2MW
8 MVA
Sardi 63MVA
36 km, 250 sq mm

7X33.33MVA
Cement
33km,250 sq mm

50km, 100 sq mm

8MVA
30 MVA 2X30MVA
Purbi 4.2MW
13 km, 250 sq mm

58km, 300 sq mm

20 km, 250 sq mm

34.55 km, 250 sq mm


Hetauda
20 km, 250 sq mm
34km, 200 sq mm 36km, 200 sq mm Chitawan
Ghorahi 3X30 MVA
Nawalpur

New Butwal
2X45MVA 2X160 MVA 3X315MVA

Bharatpur
Pathlaiya
22.5 MVA
30 MVA 12.5 MVA 2X30MVA
8 MVA
16MVA
50km,250 sq mm

Bhurigaon Kusum 30MVA 37km, 250 sq mm 33 km, 250sq mm 30MVA 27 km, 250 sq mm 63 MVA 27 km, 250 sq mm 63 MVA

Dhalkebar
3X63 MVA 63MVA
(30+63)MVA 16.6MVA 22.5MVA 32km, 250 sq mm 2X30MVA 70km,250 sq mm 16MVA 58km, 250 sq mm 2X30 MVA
47km, 250 sq mm 51km, 250 sq mm (30+12.5)MVA 23km, 250 sq mm 30 MVA 38km, 250 sq mm 3X16.6 MVA Hetauda DP 8km, 250 sq mm 16.6 MVA 2X16.6 MVA 3X63MVA 43 km, 250 sq mm 30MVA
16.6MVA 43 km, 250 sq mm 22.5+7.5 MVA 8 MVA 27 km, 250 sq mm
(8+3)MVA 8 MVA 2X16.6 MVA 16.6 MVA 2X16.6 MVA
70km, 200 sq mm
Shivapur Kawasoti
2X10MVA 30MVA 63+30MVA Mirchaiya Lahan Rupni

17km, 250 sq mm
Lamahi Motipur Butwal Cha-pur Anarmani

22 km, 250 sq mm
Bardghat Keruwan Damak
14.4MW

14km, 200 sq mm
16.6 MVA
2X63MVA 22.5 MVA
22.5MVA Duhabi
(30+63)MVA
(3+16.6)MVA
52 km,150 sq mm
Kamane Kusaha
Sunawal
48km, 250 sq mm
Kohalpur Parwanipur
20km,250 sq mm

8+16.6MVA
7.5 MVA 2X15 MVA
3X22.5 MVA
Lumbini 2X4516 MVAMVA Amlekhgunj Simra
2X63MVA 2X63 MVA
16 MVA NEPAL ELECTRICITY AUTHORITY
15MW Gandak HEP Balganga Biratnagar TRANSMISSION DIRECTORATE
GRID DEVELOPMENT
Nepalgunj Birgunj 2X30 MVA
Harniya Salimpur Loharpatti
39MW
Multifuel DP
Hakkui 2X12.5 MVA
12 km,150 sq mm
From Raxual From Muzzaffarpur From Kataiya (Revised Date: JULY 2019)
Sampatiya (India) Gorakhpur From Balmikinagar
Legend: Under
Existing Construction Planned Voltage Level

128
400kV

220kV INTEGRATED NEPAL POWER SYSTEM


132kV (Existing & Under Construction Transmission Line Projects)
66kV
(Last Revision: July 2019)
33kV
To
11kV Jelong China
4.56km, 0.15 sq in 4.56km, 0.15 sq in 4.56km, 0.15 sq in

Length,Conductor Size

132kV Substation

220kV Substation
Chilime Upper Tamakoshi

Nepal Electricity Authority


7X53.33 MVA
Chilime HEP
456MW
400kV Substation 50 MVA
Bhotekoshi HEP
NEA's Power Plant 22MW
Khimti HEP New Khimti
Samundratar 36MW
Singati 30MVA
Trishuli 3A 3X66.67 MVA
60 MVA To
IPP's Power Plant
Ratmate 30MVA
Garjyang
7X53.33 MVA

39km, 150 sq mm
60MW
Trishuli 3B HUB 50 MVA 60MW
Dharapani

31km,100 sq mm
Trishuli HEP Lamosangu

Lapsiphedi
Devighat HEP Okhaltar
26.5km, 100 sq mm 2.8km, 500 sq mm
4.56km,150 sq mm 30MVA
Undgrd Cable
Borang
48 km, 250 sq mm
14.1MW
24MW Barhabise

Chapali Changunarayan Indrawati HEP

48km, 250 sq mm
Kritipur New Chabel 3X22.5MVA 5km, 100 sq mm 2X49.5 MVA
Kudi 30 MVA

11km, 250 sq mm 7.5MW

29km, 100 sq mm
10 MVA 11km, 250 sq mm Bhaktapur
Lapan
From Tanakpur Banepa
12km, 250&100 sq mm

49.5 MVA
Dana

2X22.5 MVA

48km, 2XBISON
Lainchour 22.5MVA 10 MVA
Udipur 2km, 200 sq mm Indrawati Sunkoshi
To 2X22.5MVA 7.7km, 800 sq mm UG Cable
Balaju HEP
Dada Khet Lapsiphedi 45 MVA
2X22.5MVA 11km, 120 sq mm 11km, 120 sq mm
2.7 km, 120 sq mm 2X18MVA
Mahendranagar New Modi 10.05MW
7 km,150 sq mm 4X18MVA
28km,95 sq mm

Modi HEP
8km, 120 sq mm

2X15 MVA Chameliya HEP Lower Modi HEP


7.5 MVA Baneshwor 10MVA
Upper Mar-A HEP Patan 29km, 120 sq mm

7km, 150 sq mm
30MW Rahughat Ratmate
10MW 14.8MW
Panchkhal

4.9km, 250 sq mm
Nalsing Gadh
4.1 km, 250 sq mm
50MW
Switchatar Tumlingtar

37km, 250 sq mm
20 km, 250 sq mm
250 MVA 75 km, 2X BISON
TRANSMISSION/PROJECT MANAGEMENT DIRECTORATE

131km, 250 sq mm Syaule Lahachwok 2X18MVA 3X37 MVA


30MVA 7X33.33MVA
2X22.5MVA Kabeli
30 MVA 8 MVA Sitalpati 2X30MVA
2X30 MVA

37km, 250 sq mm
2.8km,XLPE 500 sq mm
Attariya 16.6 MVA 8 MVA
Kusma Mid. 30MVA
2X30 MVA 3 MVA
Bafikot Pokhara Mar. HEP 2X22.5MVA
Matatirtha Teku
Burtibang To New Hetauda 30MVA Dhungesangu 30MVA
22.5MVA

29km, 150 sq mm

7km,150 sq mm
45 km, 250 sq mm
30 MVA K-3 Kabeli HEP
Birauta 69MW
30MVA 37MW

38km, 250 sq mm
30 MVA
22.5MVA
13.33 km, 250 sq mm

30 MVA
Pahalmanpur Jumla Basantapur
8 MVA KL-II HEP Tingla
Lekhnath 7X33.33MVA 20 MVA
40 km, 250 sq mm 2X30MVA 3 MVA
30MVA

36km, 250 sq mm
30 MVA KL-I HEP 30MVA Baneswor Mai Khola
Madichaur 30 MVA
8MVA

84km, 300 sq mm
Syangja 8 MVA 32MW Phidim

45km,150 sq mm
Paudi Amrai 2X30MVA 18km, 250 sq mm Puwa HEP
KL-III HEP 60MW
15.6MW

Markhi Chowk
Dailekh (16.6+3)MVA
Damauli
Jhimruk HEP 30 MVA To Ratmate 2X100MVA 3X315MVA Ilam 6.2MW
Marsyangdi HEP 2X63MVA

35km, 250 sq mm
42.68 km, 250 sq mm

Tamghash New Damauli 63MVA

16km, 150 sq mm

48km, 300 sq mm
39km, 150 sq mm 69MW 14MW
Dharan

8km,250 sq mm
2X15 MVA 8MVA 4.2MW
Lamki 16.6 MVA 12MW KG-A HEP
Surkhet Hapure 30 MVA
Sandikharka 8 MVA Mai Cascade
30 MVA 2X100MVA 3X315MVA
144MW
8 MVA Hongsi 10 MVA
7X33.33MVA Sardi
Inaruwa

30 MVA 2X30MVA Cement

25km, 300 sq mm
34.55 km, 250 sq mm

20 km, 250 sq mm
Purbi 2X30 MVA

33km,250 sq mm
Damak 30MVA
34km, 200 sq mm 36km, 200 sq mm Chitawan 16.6 MVA 27 km, 250 sq mm 2X16.6 MVA
3X30 MVA
30 MVA 2X45MVA 2X160 MVA 3X315MVA

36 km, 250 sq mm
Ghorahi 22.5 MVA
8 MVA Nawalpur

50km, 100 sq mm
12.5 MVA 2X30MVA
Pathlaiya Anarmani

58km, 300 sq mm

13 km, 250 sq mm
Hetauda

20 km, 250 sq mm
16MVA
30MVA 37km, 250 sq mm 63MVA 33 km, 250sq mm 30MVA 63 MVA
Bhurigaon Kusum (30+63)MVA 3X63 MVA 16.6MVA 27 km, 250 sq mm 27 km, 250 sq mm 63 MVA 58km, 250 sq mm
47km, 250 sq mm 51km, 250 sq mm(30+12.5)MVA23km, 250 sq mm 30 MVA 38km, 250 sq mm Hetauda DP 8km, 250 sq mm 22.5MVA 32km, 250 sq mm 2X30MVA 70km,250 sq mm 16MVA 16.6 MVA 2X16.6 MVA 3X63MVA 43 km, 250 sq mm
16.6MVA 3X16.6 MVA 43 km, 250 sq mm 22.5+7.5 MVA 8 MVA
(8+3)MVA 8 MVA 2X16.6 MVA
70km, 200 sq mm
2X10MVA 30MVA 63+30MVA

Bharatpur
14.4MW Mirchaiya Lahan Rupni
16.6 MVA

50km,250 sq mm
New Butwal
Lamahi Shivapur Motipur Butwal 2X63MVA Bardghat Kawasoti Cha-pur 22.5 MVA Keruwan
22.5MVA 52 km,150 sq mm Duhabi
(30+63)MVA
Dhalkebar

(3+16.6)MVA 48km, 250 sq mm


Kamane Kusaha
17km, 250 sq mm

Sunawal
Kohalpur 8+16.6MVA

22 km, 250 sq mm
7.5 MVA Multifuel DP
Balganga
2X45 MVA 2X63 MVA
Lumbini 16 MVA 16 MVA 39MW

14km, 200 sq mm
Amlekhgunj Salimpur

20km,250 sq mm
Harniya Loharpatti
Biratnagar
2X15 MVA
Hakkui
Gandak HEP Simra
Nepalgunj
From Kataiya
15MW

Sampatiya (India) Parwanipur

A Year Book-Fiscal Year 2018/2019 (2075/2076 BS)


2X63MVA 3X22.5 MVA
Gorakhpur
From Muzzaffarpur

From Balmikinagar
2X30 MVA
Birgunj 12 km,150 sq mm
2X12.5 MVA

NEPAL ELECTRICITY AUTHORITY


From Raxual TRANSMISSION DIRECTORATE
GRID DEVELOPMENT
(Revised Date: JULY 2019)

You might also like