You are on page 1of 6

TECHNICAL REPORTS :

S. No. Publication No. Title Month &


Year
1. TM-1 Evaluation of standard deviation based on TGI Feb -1994
2. TM-2 Dynamic testing of PSC sleeper of new design to Drg No. T-5475 Dec -1994
3. TM-3 Dynamic testing of track panel comprising of PRC sleeper to Drg No. Jan -1995
T-5475 on 60kg rail.
4. TM-4 Track tolerance for 160 kmph passenger train operation. May -1995
5. TM-5 Testing of sleeper assembly of ballastless track for Konkan railway May- 1995
with reference to project scheme no. TM- TL-12 dt. 04-03-1994
6. TM-6 Dynamic testing of combination GFN liner in drg no. RDSO-T-3707 Dec -1996
7. TM-7 Catalogue of approved small track machines on IR. Mar -1997
8. TM-8 Testing of ERC- mk-II to drg. no. RDSO-T-4054 Mar -1997
9. TM-9 Manual of inspection for maintenance of measuring frame of TRC. Mar -1997
(BG)
10. TM-10 Manual for inspection for maintenance of testing trolley of spurt car. Mar -1997
11. TM-11 Booklet of instruction for implementation of standard deviation based Mar -1997
assessment of Track Geometry using TGI
12. TM-12 Dynamic testing of shallow PSC sleeper to drg. no. T-4852 on 60kg Mar -1998
rail.
13. TM-13 Determining the limiting TGI value on various routes of IR. Mar -1998
14. TM-14 Determination of limiting values on various routes of IR based on ride May -1998
criteria.
15. TM-15 Determination of limiting uneven mass & alignment index values on Nov- 1998
various routes of IR based
16. TM-16 Performance of carbide tip tamping tool. Mar -1999
17. TM-17 Study of alignment parameters under floating & loaded conditions Oct- 1999
18. TM-18 Criteria for selection of test stretches for oscillation trial on BG. Jan -2000
19. TM-18A Maintenance schedule of spurt car Feb -2000
20. TM-31 Fatigue testing of 75mm wide gap AT weld samples for 52 kg / 90UTS Sep- 2000
rail section.
21. TM-32 Static & fatigue testing of PSC sleeper of new design drg no. T-5476 Sep -2000
on conventional pulsator machine.
22. TM-33 Study of alignment parameter under floating & loaded conditions. Dec- 2000
23. TM-34 Maintenance schedule BRM-66-4 & 56-3 Feb- 2001
24. TM-36 Deputation report of training & inspection of optical rail inspection & May- 2001
analysis system 12-02-2001 to 10-03-2001
25. TM-37 Project report on production & transportation of long rail. Jul- 2001
26. TM-38 Maintenance schedule for P & Xing changing machine (Ameca T -28). Aug- 2001
27. TM-40 Study on effectiveness & efficacy of design mode tamping of track. Jan- 2002
28. TM-42 Trouble shooting guide for BCM RM-80 Jan -2002
29. TM-43 Inspection check list for P & Xing changing machine (Ameca T -28). Jan- 2002
30. TM-44 Study of testing of rail by spurt car. Jan -2002
31. TM-45 Trouble shooting manual for P & Xing changing machine (Ameca T - Feb -2002
28).
LIST OF TECHNICAL REPORTS :

Page 1 of 6
S. No. Publication No. Title Month &
Year
32. TM-46 Trouble shooting manual of BCM (66-4 & 56-3) May- 2002
33. TM-48 A case study for relaxation of speed restriction at mechanized deep Jul -2002
screening work site.
34. TM-49 Deputation report of training of high speed Track recording system. Sep- 2002
35. TM-50 Study of track performance of NDLS-MGS section of NR. Oct- 2002
36. TM-55 Study of track performance of MTJ-BCT section of WR Jul- 2003
37. TM-59 Deputation report of Inspection and Lab validation of high speed track Jan-2004
recording system from 10.8.2003 to 22.8.2003 at M/S ENSCO, Ins.
5400 Port Royal Road, Virginia USA.
38. TM-62 Trouble Shooting Manual of Continuous Tamping Machine ( 09-32 Mar-2004
CSM).
39. TM-65 Trouble Shooting Manual for Duomatic. Mar-2004
40. TM-66 Installation and commissioning report of optical rail profile Mar-2004
measurement and analysis system.
41. TM-67 Lab validation report of upgraded track recording system ( TRC-7966). Apr-2004
42. TM-68 Report of complete for movement of track maintenance vehicles over Jul-2004
sections provided with track circuit/axle counter.
43. TM-69,Rev.01 Maintenance schedule for continuous tamping machine (09-32 CSM) Jul-2016
44. TM-70 Trouble Shooting Manual for Ballast Regulating Machine (66-4) Jul-2004
45. TM-71 Checklist for inspection of point & Point & Crossing Tamping Sept- 2004
machine (UNIMAT)
46. TM-72 Study of ultrasonic testing of rail by Spurt car Sept- 2004
47. TM-73 Inspection Checklist for Ballast Cleaning Machine (RM-80) Nov- 2004
48. TM-74, Inspection Checklist of CSM Octoober
Rev.01 2014
49. TM-75 Study of axlebox mounted Accelerometer on Bhopal division of West Dec-2004
Central Railway
50. TM-76 Inspection Checklist of UNOMATIC Dec- 2004
51. TM-77 Maintenance Schedule for Ballast Cleaning Machine ( RM-80) Jan-2005
52. TM-78 Lab Validation Report of Upgraded Track Recording System ( Feb-2005
TRC-7965)
53. TM-79 Maintenance Schedule of Shoulder Ballast Cleaning Machine ( Feb-2005
FRM-80)
54. TM-82 Trouble Shooting manual of Work site tamper 08-32 (Plasser) Mar-2005
55. TM-83 Maintenance Schedule for Unomatic Tie Tamping Machine (08-16) May -2005
56. TM-84 Maintenance Schedule for Duomatic Tie Tamping Machine (08-32) May -2005
57. TM-85,Rev.- Maintenance Schedule for Tamping Expess Machine (09-3x) Mar- 2017
01
58. TM-86 Deputation Report of Training & Inspection of Two new SPURT Cars Jun- 2005
59. TM-87 Maintenance Schedule Manual for Ballast Regulating Machine (BRM Jun-2005
66-4)
60. TM-88 Trouble Shooting Manual of Unomatic Tie Tamping Machine (08-16) Jul-2005
61. TM-89 Trouble Shooting Manual of Duomatic Tie Tamping Jul- 2005

LIST OF TECHNICAL REPORTS :

Page 2 of 6
S. No. Publication No. Title Month &
Year
62. TM-90 Maintenance Schedule Manual for Dynamic Track Stabiliser (DGS- Aug-2005
62N)
63. TM-91 Inspection Checklist for Shoulder Ballast Cleaning Machine (FRM-80) Sept-2005
64. TM-92 Inspection Checklist for Dynamic Track Stabilizer (DGS-62N) Oct- 2005
65. TM-93 Troubleshooting Manual of Track Relaying Train (P811S) Nov-2005
66. TM-95 Training report and Lab validation of PTGMS Jan-2006
67. TM-96 Inspection Checklist of Ballast Regulating Machine Feb- 2006
68. TM-97 Track Geometry Standard for Busy Routes of Indian Railways for Jan-2006
different speed bands
69. TM-99 Trouble Shooting Manual of Point and Crossing Tamping Machine Mar-2006
70. TM-100 Maintenance schedules for multipurpose track tamping machine Jun.-2006
(unimat compact-m)
71. TM-101,Rev.- Maintenance Schedules for Plasser’s Quick Relaying System (PQRS) Mar-2015
01
72. TM-102 Maintenance Schedules for Point and Crossing Changing Machine Aug.-2006
(AMECA-T-28)
73. TM-103 Inspection check List of Point & Crossing Changing Machine (T-28) Oct-2006
74. TM-104 Maintenance Schedules for Track Relaying Train (TRT) Nov- 2006
75. TM-105 Inspection Check List for Multipurpose Track Tamping Machine Dec-2006
(UNIMAT Compact-M)
76. TM-106 Lab and Field validation of PC based Route Data file preparation Dec-2006
system
77. TM- Check List for Inspection of Tamping Express Machine (09-3x) Dec,2014
106,rev.01
78. TM-107 Inspection Check List of Track Relaying Train (TRT) Feb.-2007
79. TM-108, Inspection Check List of PQRS Machine Mar-2007
Rev.01
80. TM-109 Track Geometry Standard for B.G.routes of Indian Railways (for Mar-2007
different speed bands ) to facilitate Predictive maintenance
81. TM-110 Trouble Shooting Manual of T-28 Machine Mar-2007
82. TM-111 Inspection check list of Duomatic Machine . Jun- 2007
83. TM-112 Report of Study Team on Ultrasonic testing of rails. May-2007
84. TM-113 Deputation Report of Inspection & Training of Electronic Rail Aug-2007
Corrugation and weld measurement system.
85. TM-114 Field validation Report of Upgraded Track Recording System (TRC- Aug-2007
7965 & 7966).
86. TM-115 Planning for Through Tamping on the basis of TGI . Oct-2007
87. TM-117 Trouble Shooting Manual of Plasser make Worksite Tamper (08-32). Feb-2008
88. TM-119 Maintenance Schedules for Shoulder Ballast Cleaning Machine (FRM- Mar-2008
85F).
89. TM-120 Frame Resistance of Track Frame consisting of 52 Kg. Rail on 60 Kg. May-2008
PSC sleepers with ERC MK-III
90. TM- Maintenance Schedules for Utility Track Vehicle (Phootas Make ). Oct.2017
121,Rev.01

LIST OF TECHNICAL REPORTS :

Page 3 of 6
S. No. Publication No. Title Month &
Year
91. TM-122 Fatigue Testing of B.G. Monoblock Prestressed Concrete Sleepers to Jul-2008
Drg. No. EDO/T-2255 for Dedicated Freight Corridor (DFC).
92. TM-123 Review Paper on Global Test Tracks with special reference to Heavy Aug-2008
Haul Train Operation.
93. TM-124 Criteria for selection of Test Stretches for Oscillation Trials on B.G. Sept-2008
routes of Indian Rlys.
94. TM-125 Maintenance Schedules for Shoulder Ballast Cleaning Machine (FRM- Nov- 2008
85F).
95. TM-126 Check list for Inspection of Shoulder Ballast Cleaning Machine (FRM- Nov- 2008
85F) Provisional.
96. TM-127 Provisional. Inspection check list for Utility Track Vehicle (Phootas Feb-2009
Make ).
97. TM-128 Trouble Shooting Manual of Plasser Quick Relaying System (PQRS). Feb- 2009
98. TM-129,Rev.- Checklist for Inspection of Plasser makes Worksite Tamping Machine Mar-2017
01 (8049-onwords).
99. TM- Maintenance Schedules Manual for Worksite Tamping Machine Mar-2017
130,Rev.01 (Plasser Make).
100. TM-131 Frame Resistance of Track Frame consisting of 60 Kg. Rail on 60 Kg. Mar-2009
PSC sleepers.
101. TM-132 Inspection check list for Utility Track Vehicle (Phootas Make ). Jun-2009
102. TM-133 Lab Validation Report of Track Recording System (TRC-7967). Jun.-2009
103. TM-134 Report on track geometry measuring system playing on European Nov-2009
railway identification of suitable method of recording/system for
Indian Railway.
104. TM-135 Study visit for test track at TTCI/UK, Siemens / Germany, Old Dalby/ Jun.-2009
UK
105. TM-136 Check list for inspection of SBCM (FRM-85F) Dec.-2009
106. TM-138 Field validation report of track recording system. TRC-7967 Mar-2010
107. TM-139 Trouble Shooting Manual of SBCM(FRM-85F) Mar-2010
108. TM-141 Maintenance Schedules Manual for Worksite Tamping Machine Jun-2010
(Metex Make).
109. TM-142 Fatigue testing of mono block PSC sleeper to Drg No. RDSO/T-7008 May -2010
capacity 25T
110. TM-143 Fatigue testing of mono block PSC sleeper to Drg No. RDSO/T-7013 Jun-2010
capacity 25T
111. TM-144 Check list for inspection of Worksite Tamping Machine (Metex Make) Apr-2010
112. TM-145 Identification of section of Group A & B routes where consistent Aug-2010
maintenance inputs are required.
113. TM-148 Trouble shooting manual of DTS (DGS-62N) Sept-2010
114. TM-149 Fatigue testing (Pulsator testing of ERC-MK-III Assembly for 20.31T, Oct-2010
22.32T & 22.82 T axle load)
115. TM-150 The effect of increased axle loads on track maintenance & wear on iron Sept-2010
ore routes.
116. TM-151 Fatigue testing of composite bridge sleepers. Oct-2010

LIST OF TECHNICAL REPORTS :

Page 4 of 6
S. No. Publication No. Title Month &
Year
117. TM-152 Identification of section of Group A & B routes where consistent Oct-2010
maintenance inputs are required based on track recording Apr 2010 to
Jun 2010
118. TM- 153 Maintenance Schedules Manual for BRM (PBR 400R) Dec -2010
119. TM-154 Deputation report, visit to LORAM Maintenance of way, Minneapolis, Dec -2010
USA for RGM, by Tushar Kant Pandey
120. TM-155 Study of track performance of HWH-NDLS section Apr -2011
121. TM-156 Inspection check list for BRM (PBR 400R) Feb -2011
122. TM-159 Maintenance Schedules Manual for TLE (Simplex) July-2011
123. TM-160 Inspection check list for TLE (Simplex) July-2011
124. TM-161 Core Group report on RGM Jul -2011
125. TM-162 Peak based maintenance standards for 160KMPH Sept- 2011
126. TM-163 Testing of 60 kg AT welded rail joint having riser at both faces. Sept- 2011
127. TM-164 Specification of supply of RGM for standard gauge track for Metro Jan-2012
Rail Project
128. TM-167 Report on the cases of Frequent Derailment in Udaipur-Himmatnagar May-2012
section of North-Western Railway.
129. TM-168 Maintenance schedule manual for UNIMAT-4S. May-2012
130. TM-169,Rev- Inspection checklist of UNIMAT-4S. Oct-2014
01 Revision-1
131. TM-170 Procedure for inspection of wheels of on track machines. Jul-2012
132. TM-171 Safety Guidelines for RGM Aug-2013
133. TM-172 Deputation report of Inspection & Lab Validation of two LASER Mar-2013
based Track Recording system from 21.10.12 to 02.11.12 at M/S
Technogamma Spa, monopoly, Bari, Itali.
134. TM-173 Deputation report of training on Laser-contact-Less Sensor Based Apr-2013
Track Recording System from 11.02.2013 to 08.03.2013 at M/S
Technogamma Spa, monopoly, Bari, Itali.
135. TM-174 Identification of relevant chord on Track Geometry. Oct-2013
136. TM-175 Maintenance schedule manual for UNIMAT-(08-275 & 08-275 3S) Jun-2013
137. TM-177 Deputation report of training on Ballast Cleaning machine from Jun-2013
13.05.13 to 24.05.13 at M/s Plasser & Theurer, Austria by DTM-III
(Anil Choudhary & Others)
138. TM-178 Maintenance schedule for Ballast Cleaning machine RM-80-92 U Feb-2014
139. TM-179 Deputation report of training on BRM Jun-2013
140. TM-180 Maintenance schedule for Rail Grinding Machine. Jan-2014
141. TM-181 Report on usefulness of high speed grinding over IR Apr-2014
142. TM-182 Existing specification of Point & crossing renewal machine and study Jun-2014
of different similar machines manufactured by leading manufacturers
world over
143. TM-183 Check list for inspection of WST Mar-2015
144. TM-184 Inspection check list for Unimat-Spit head Jan-2015
145. TM-186 Inspection check list for BCM (RM-80-92U) Jan-2015

LIST OF TECHNICAL REPORTS :

Page 5 of 6
S. No. Publication No. Title Month &
Year
146. TM-187 Maintenance schedule manual for Levelling, tamping & lining Mar-2015
Machine-WST (VPR-02M)
147. TM-188 Behavior of ERCs during PQRS & Tie tamping operations Sept-2015
148. TM-189 GPS based portable system for Acceleration measurement at axle box Jan-2016
level
149. TM-190 Lab measurement of frame resistance of cross-bracing arrangements Oct-2015
150. TM-194 Fatigue Testing of Wider Prestressed Concrete Sleepers Jan-2016
151. TM-195 Report on monitoring and revaluation of the working of DGS on Indian Jan-2016
Rly.
152. TM-196 Maintenance schedule manual for Unimat split head(MFI) Mar-2016
153. TM-197 Report on codal life of Track M/C & evaluation of quality of O/P of June-2016
T/M
154. TM-200 Inspection checklist of BRM, GEMAC ModelSPZ-210K Nov-2016
155. TM-201 Specification of Rail Inspection Vehicle (RIV) Nov-2016
156. TM-202 Fatigue testing of 60 kg(90UTS) welded rail joint (grounded at bottom Dec-2016
of rail foot)
157. TM-203 Maintenance schedule manual for BRM (USP 2000 SWS) Mar-2017
158. TM-204 Inspection checklist for BRM (USP 2000 SWS) Mar-2017
159. TM-205 Maintenance schedule manual for BRM (GEMAC-SPZ-210) Mar-2017
160. TM-206 Functional specification of Abrasive stone (Rail grinding stone) Mar-2017
161. TM-207 Loss in lateral ballast resistance after shoulder ballast cleaning Apr-2017
machine(SBCM)

LIST OF TECHNICAL REPORTS :

Page 6 of 6

You might also like