STS - KEC (JV)

KEC/RVNL/KGP-ADTP/PKG-2/1651 Date: 12.07.2021

To,
Executive Director, Metro.
24, Deshpran Sasmal Rd,
Tollygunge,
Kolkata,
West Bengal 700033

Sub: Package-2: Execution of 3rd Line Project between Chakulia (Excluding) and Adityapur (including) -
Construction of roadbed, bridges, supply of ballast, Installation of track (excluding supply of rails,
Thick web switches & Ordinary PSC sleepers), Electrical (Railway Electrification and General
Electrification), signalling and telecommunication works in Kharagpur Division of South Eastern
Railway, West Bengal and Jharkhand, India. “Submission of Key personal manpower list reflecting
actual availability”.

Reg: Key Manpower Deployment Contractual versus Actual in project.

Ref: (i) LOA no. RVNL/KOL/KGP-ADTP/3rd line/tender/03/PK-2/1905A dated 31.01.2018.


(ii) MD Review Meeting dated 6th July 2021.

Dear Sir,
This is in reference to the discussion we had with you during the last CMD Review Meeting as chaired by
DO dated 6th July 2021. In the review meeting STS – KEC (JV) was questioned regarding sufficiency of Key
Manpower deployment at site.
Kindly be appraised, in order to complete the work with accelerated momentum, STS - KEC JV has
deployed sufficient number of personnel over & above the Key Manpower Requirement in the contract &
is elucidated as below:

Support
Sr No Project Civil Pway S&T OHE GEW Total
Staff
Key Manpower as per
1 14 3 4 1 2 8 32
Contract
Key Manpower Actual
2 27 3 8 1 6 15 60
Deployed
% Actual Deployed
3 above Contract 193% 100% 200% 100% 300% 188% 188%
Requirement.

Also please find herewith the comparison of Key Manpower Required as per Contract against Actual
Deployed at project.

Minimum
Actual
No. of Qualification and
Sl. Position Available. Name of Key Personnel
Manpower Experience
At Site
Require
1 Project Manager 1 Nos. 1 Nos. BE/16yrs Mr. Champak Kakati

DIP/17yrs Mr. Joy Rajbangshi


Sr. Engineer –
2 2 No. 2 No.
Earthwork
BE/8yrs Mr. Sri Nivas

Address: 8th Floor, Building No. 9A, DLF Phase-III, Cyber City, Gurgaon-122002 (Haryana), India
Ph NO.: 0124- 6757555, Fax: 0124 – 6757798/99
STS - KEC (JV)
Minimum
Actual
No. of Qualification and
Sl. Position Available. Name of Key Personnel
Manpower Experience
At Site
Require
BE/11yrs Mr. Ritwik Mondal
3 Sr. Engineer – Bridges 2 No. 2 No.
DIP/16yrs Mr. Azam Ali

4 Sr. Engineer – PWay 1 No. 1 No. BE/9yrs Mr. Santosh Kumar Sahu

5 Sr. Engineer – S&T 1 No. 1 No. DIP/26yrs Mr. Samir Kandar

Sr. Engineer – General


6 1 No. 1 No. BE/12yrs Mr. Ranjit Biswal
Electrical works

BE/7yrs Mr. Pratik Shahi

DIP/8yrs Mr. Devendra Kumar

DIP/21yrs Mr. Akhilesh Kumar

DIP/7yrs Mr. Lucky Hussain


7 Supervisor – Earthwork 3 Nos. 8 Nos.
DIP/5yrs Mr. Arghya Mukherjee

DIP/8yrs Mr. Rama Shankar

DIP/8yrs Mr. Somesh Nandy

DIP/6yrs Mr. Sumit Singha

BE/7yrs Mr. Rachit Verma

DIP/7yrs Mr. Indrajeet De

BE/6yrs Mr. Arindam Banerjee

DIP/10yrs Mr. Sushil Jena

8 Supervisor – Bridges 3 Nos. 9 Nos. DIP/6yrs Mr. Sagar Baidya

BE/6yrs Mr. Dhiraj Burnwal

BE/3yrs Mr. Swarna Chandra

BE/3yrs Mr. Rahul Bauri

BE/3yrs Mr. Sumanta Banerjee

9 Supervisor – PWay 2 Nos. 2 Nos. BE/5yrs Mr. Abir Khaskel

Address: 8th Floor, Building No. 9A, DLF Phase-III, Cyber City, Gurgaon-122002 (Haryana), India
Ph NO.: 0124- 6757555, Fax: 0124 – 6757798/99
STS - KEC (JV)
Minimum
Actual
No. of Qualification and
Sl. Position Available. Name of Key Personnel
Manpower Experience
At Site
Require
DIP/11yrs Mr. Satya Prakash

Supervisor – Building
10 1 No. 1 No. BE/7yrs MD. Atif Ali Shamshi
& Platforms
BE/9yrs Mr. Ashish Kumar

DIP/20yrs Mr. Jagadamba Prasad

BE/3yrs Mr. Shiva Prasad Sahu

11 Supervisor – S&T 3 Nos. 7 Nos. BE/2yrs Mr. Gaurav Sarkar

BE/2yrs Mr. Subhadeep Konar

BE/2yrs Mr. Deepak Show

BE/12yrs Mr. Avnish Kumar

DIP/14yrs Mr. Haradhan Jana


Mr. Narendra Pratap
DIP/5yrs
Singh
Technical Supervisor – DIP/5yrs Mr. Bibhu Prasad Sahu
12 General Electrical 2 Nos. 6 Nos.
works Btech/7yrs Mr. Junaid Akhter

BE/2.5yrs Mr. Swagat Mishra

DIP/13yrs Mr. Tapas Chandra Sao

DIP/14yrs Mr. Debi Prasad Ghosh

DIP/10yrs Mr. Sanjiv Kumar Rai


13 Surveyor 2 Nos. 4 Nos.
Mr. Benugopal
DIP/11Yrs
Bhowmick
DSE/15yrs Mr. Nandan Bhaskar

BE/10yrs Mr. Munesh Dubey


14 Material Testing Engg. 1 No. 2 No.
DIP/5yrs Mr. Sujit Mishra

BCom/7yrs Mr. Abhishek Choubey


15 Liaison Manager 1 No. 2 No.
Gra/7yrs Mr. Satyabrata Mondal

DIP/8yrs Mr. Purusottam Kumar


16 Safety Officer 1 No. 2 No.
DIP/8yrs Mr. Tapas Pal

Address: 8th Floor, Building No. 9A, DLF Phase-III, Cyber City, Gurgaon-122002 (Haryana), India
Ph NO.: 0124- 6757555, Fax: 0124 – 6757798/99
STS - KEC (JV)
Minimum
Actual
No. of Qualification and
Sl. Position Available. Name of Key Personnel
Manpower Experience
At Site
Require
DIP/15yrs Mr. Ashok Tiwari
17 Quality Officer 1 No. 2 No.
DIP/13yrs Mr. Rabi Dutta

MBA/16yrs Mr. Rajeev Kahar


18 Material Manager 1 No. 2 No.
DIP/7yrs Mr. Tarun Patra

19 Draft Man – Civil 1 No. 1 No. BE/5yrs Mr. Rakesh Pradhan

DIP/6yrs Mr. Ghananand Verma


20 Draft Man – S&T 1 No. 2 No.
Mr. Arghyakusum
DIP/19yrs
Mukherjee
Mr. Muzahid Hossain
DIP/6yrs
Khan
21 Draft Man – Electrical 1 No. 2 No.
DIP/5yrs Mr. Ravendra Kumar

Total 32 Nos. 60 Nos.

Again, we wish to reiterate that STS - KEC JV is open to further mobilisation of manpower as & when
required for the project.

Thanking you and assuring our best services all time.

Thanking you.

Yours faithfully
For STS-KEC (JV)

NABAJIT BARUAH
GM/Project

CC: 1. DO/RVNL/Kol