PROJECT : PLANTATION & IRRIGATION AT NIMR

SITE : MAC 4
DAILY PROGRESS REPORT
TOTAl FINISHED
SL .NO DESCRIPTION OF WORK QAUNITY 8/4/2023 9/4/2023
QAUNTITY

1 excavataion of native tree 4480 nos 4480


2 excavataion of plam tree 72 nos 22 nos 14 nos
3 excavataion of lemon tree 140 nos 140
4 fence excavation 200 nos 200
5 installation of fence foundation 200 nos 200
6 backfilling of native tree 2196 nos 1800
7 manual excavation native tree 4480 nos 4480
8 marking for native tree excvavation 4480 nos 4480
9 road crossing pipe line excavation 12 m 12m(finished)
10 fertilzer filling for native tree 4480 NOS 3280
11 3" hdpe pipe line excavation 440 m 440 m
12 installation of 3" hdpe pipe 440 m 440 m
13 installation of 0.5" hdpe pipe 17000 m 7500 m 5750 m
14 installation of emitter 4692 nos 3250 nos 700 nos 200 nos
15 installation of irrigation cable 210 m 100 110 m
16 installation of gate valve 3 nos 1
17 installation of fence post 200 nos 4
18 pipe line trench excavation bacfilling 440 m 30 m
19 installation of pvc line wire & green net 14 m
20 backfilling of plam tree 72 nos 36 nos
21 installation of 3" saddles 136 136 nos
22 backfilling of 3" hdpe trench line 440 m 50 m
23 installation of fence post 1000 m
24
10/4/2023 11/4/2023 12/4/2023 12/5/2023

18 nos 18 nos

450 NOS

330 NOS
100 M

18 nos 18 nos

80 M 50 m 50 m 180 m
250 m 500 m 150 m 50
PROJECT : PLANTATION & IRRIGATION AT NIMR
SITE : MAC 3
DAILY PROGRESS REPORT
TOTAl
FINISHED
SL .NO DESCRIPTION OF WORK QAUNITY 8/4/2023
QAUNTITY
1 excavataion of native tree 2196 nos 1800
2 excavataion of plam tree 62 nos 26 18
3 excavataion of lemon tree 122 nos 20
4 fence excavation 150 nos 42 nos
5 installation of fence foundation 150 nos 15 35
6 backfilling of native tree 2196 nos 1800
7 manual excavation native tree 2196 nos 1230
8 marking for native tree excvavation 2196 nos 1800
9 road crossing pipe line excavation 8m 8m(finished)
10 trench excavation for 3" pipe line 550 m 160 m
11 3" hdpe roll pipe made straight (4x150m) 600 m
12 installation of 3" hdpe pipe 550 m
13 backfilling of plam tree 62 nos
14 fertilzer filling for native tree 2196 NOS
15
16
17
9/4/2023 10/4/2023 11/4/2023 12/4/2023 13/5/2023

85 100 90
18
10 30 62
31 nos 25
12 18

110 205 120


396

25 m

400 m 150 M
30 nos 32
240 270 240 186