You are on page 1of 15

Huawei

Rectifier Cabinet
Introduction

Helios Towers plc


Info
Huawei Cabinet Introduction

Helios Towers plc


Info
Huawei Cabinet Introduction

Helios Towers plc


Info
Huawei Cabinet Introduction

Helios Towers plc


Info
Huawei Cabinet Introduction

Helios Towers plc


Info
Huawei Cabinet Introduction

Helios Towers plc


Info
Huawei Cabinet Introduction

Helios Towers plc


Info
Huawei Cabinet Introduction

Helios Towers plc


Info
Huawei Cabinet Introduction

Helios Towers plc


Info
Huawei Cabinet Introduction

Helios Towers plc


Commissioning
Huawei Tenant Load iBreaker Positions

Tenant Monitoring iBreakers


The Tenant Load iBreakers have not been installed
logically and they need to be moved as photo below

1. Disconnect the tenant load cables from the two


125A iBreakers in the lower row.
2. Move the two 125A iBreakers from the lower row to
the top row
3. Reconnect the tenant load cables to iBreaker
positions 4 and 5

Tenant Load Breakers 1 to 6


Cable installed in positions 1 to 5

4 x 63A iBreakers for other site loads

Helios Towers plc


Info
Site Basic Configuration – Powercore
Path: System Settings >  > Intelligent Power Distribution > Circuit Breaker Branch Definition

Load iBreakers 125A / 63A – Group 1 Battery iBreaker – 125A


No. 1 2 3 4 5 6 7 8 6 5 4 3 2 1
ID 2 5 8 11 14 17 20 23 26 29 32 35 38 41
Tenant Loads 1 to 8 Battery 1 to 6

Other Loads / Solar Inputs

Load iBreakers 125A / 63A – Group 2


iBreakers Position
1 2 3 4 5 6 7 8
The controller / WebUI identifies each breaker
44 47 50 53 55 57 59 61 position by the ID number

Helios Towers plc


Commissioning
Site Basic Configuration – Battery Cable Installation

Figure1 Installing lithium  Figure2 Installing lithium battery 
battery power cables communications cables

Temperature & Humidity Sensor

Shielded 
CAT5 
Cable

Power Cable,450V/750V,H07Z‐K 
UL3386,25mm^2,Blue / Black,138A

Helios Towers plc


Commissioning
Site Basic Configuration – Leoch Battery Comms Cable

UIM / Master Battery Communication Cable Modification 
1. Cut the RJ45 connector at one end of the cable.
2. Cut the cables of pin 3/6/7/8
3. Crossover the cables of Pins 1 & 2
4. Move the cables from 3 & 4 to 7 & 8
5. Re‐crimp RJ45 Connector
6. Connect the original connector to the UIM
7. Connect the modified connector to the Master Battery 

Helios Towers plc


Commissioning
Site Basic Configuration – Battery Installation Order
Battery iBreaker – 125A

Battery Position No. 6 5 4 3 2 1

1 1A ID 26 29 32 35 38 41

Size 125A 125A 125A 125A 125A 125A


2 2A
3 3A
4 4A MCB 1A
1A 1B 2A 2B MCB 1B
5 5A
MCB 2A
1st 7th 2nd 8th
6 6A MCB 2B
7 1B
8 2B MCB 3A
3A 3B 4A 4B MCB 3B
9 3B
MCB 4A
10 4B 3rd 9th 4th 10th
MCB 4B
11 5B
12 6B MCB 5A
5A 5B 6A 6B MCB 5B
MCB 6A
Battery Installation Order 5th 11th 6th 12th
MCB 6B
Install lithium batteries in the
above order for
 Maximum Ventilation Space
 Spread load across breakers

Helios Towers plc