You are on page 1of 18

1 LEGEND:

ROOF LINE
DS DS
TO STORM DRAIN
GV
GV 45 gal.
FIRE RESERVE BUCKET

50mmØ uPVC
WATER LINE
GV
50mmØ uPVC
TO LANDSCAPE

WATER

40mmØ uPVC PIPE


FILTER

304 SS, 2-150


GALLONS

TO SUPPLY
CROSS SECTION DETAIL NOTE
PROVIDE SPLASH BLOCK @ BUCKET
LINE

316 STAINLESS BUCKET


PROVIDE DOME TYPE STRAINER

RAIN WATER
HARVESTING DIAGRAM

PLUMBING NOTES:
32mmØ STUB-OUT FOR
RAIN WATER COLLECTOR
GV
25mm PPR CWL
SF

CISTERN TANK RISER DIAGRAM

32mmØ PPR CWL


LEACHING LEACHING
DIGESTIVE CHAMBER CHAMBER CHAMBER
GV
25mm PPR CWL
GF

2-1.5 HP,
1 RESERVED
CV GV GV
PUMP
85
LONGTUDINAL SECTION DETAIL GAL
CT

PPR CWL
40mmØ
PUMP

GV CV 32mmØ PPR CWL

CV
WM
GV
PLAN

CATCH BASIN DETAIL WATER LINE RISER DIAGRAM

DL DL
DLDL
DL DL
DL

DESIGN CRITERIA

DLDLDL
DL
DL

DL
DL

DLDL DLDL
DL DL DL DL

DL
DLDL

DL
DL
DL
DL
DLDL
DLDLDLDL

DL
10mmØ BAR HANDLE

3-10mmØ (E.W.)

PLAN DET. OF SEPTIC TANK COVER DETAIL SECTION

CATCH BASIN DETAIL


NOTE:

DL
DLDLDLDL
DLDL

DLDLDLDL
DLDL

DLDL DLDL
DL
DLDL DLDL

DLDL
DLDL
DL

DL
DLDL

DL
DL DLDL
DLDL

REPUBLIC OF THE PHILIPPINES

PROPOSED THREE (3) STOREY


DEPED DIVISION OFFICE BUILDING P-1
DEPARTMENT OF EDUCATION (LARGE DIVISION)
DEPARTMENT OF EDUCATION

EDUCATION FACILITIES DIVISION 18


MERALCO AVENUE, PASIG CITY
1 2 3 4 5 6 7 8

FLOAT
VALVE
GV
CISTERN

32mmØ PPR COLD WATER LINE


2-1.5 HP, TANK
PUMP
1 RESERVED PT
PUMP

32mmØ PPR 32mmØ PPR


HB CWL (RISER) 32mmØ PPR COLD WATER LINE 32mmØ PPR COLD WATER LINE 32mmØ PPR COLD WATER LINE CWL (RISER) HB GV

A BSWC
GV
WC WC BSWC BSWC BSWC
GV

20mmØ PPR COLD WATER LINE

20mmØ PPR COLD WATER LINE

20mmØ PPR COLD WATER LINE

20mmØ PPR COLD WATER LINE


GV GV GV GV
URI URI

URI URI

URI URI
LAV SS SS
BSWC WC BS
LAV LAV LAV LAV LAV

LAV LAV LAV LAV

LAV LAV LAV LAV

32mmØ PPR COLD WATER LINE


B

32mmØ PPR COLD WATER LINE


D
CV
WM
GV

GROUND FLOOR
WATER LINE LAYOUT

REPUBLIC OF THE PHILIPPINES

PROPOSED THREE (3) STOREY


DEPED DIVISION OFFICE BUILDING P-2
DEPARTMENT OF EDUCATION (LARGE DIVISION)
DEPARTMENT OF EDUCATION

EDUCATION FACILITIES DIVISION 18


MERALCO AVENUE, PASIG CITY
1 2 3 4 5 6 7 8

32mmØ PPR 32mmØ PPR


CWL (RISER) CWL (RISER)
32mmØ PPR COLD

A BS WC
BS GV
WC WC BSWC WATER LINE BSWC BSWC BSWC
GV

20mmØ PPR COLD WATER LINE

20mmØ PPR COLD WATER LINE

20mmØ PPR COLD WATER LINE

20mmØ PPR COLD WATER LINE


GV GV GV GV
WC LAV KS
URI URI
WC
BS
URI BS URI
WC
WC
BS
URI URI
SS SS SS SS
WC WC BS
LAV LAV BS LAV LAV LAV LAV

LAV LAV LAV LAV

LAV LAV LAV LAV

2ND FLOOR WATER LINE LAYOUT

REPUBLIC OF THE PHILIPPINES

PROPOSED THREE (3) STOREY


DEPED DIVISION OFFICE BUILDING P-3
DEPARTMENT OF EDUCATION (LARGE DIVISION)
DEPARTMENT OF EDUCATION

EDUCATION FACILITIES DIVISION 18


MERALCO AVENUE, PASIG CITY
1 2 3 4 5 6 7 8

32mmØ PPR 32mmØ PPR


CWL (RISER) 32mmØ PPR COLD 32mmØ PPR COLD CWL (RISER)
WATER LINE WATER LINE
A BSWC
BS GV
WC WC BSWC WC BS WC WC WC BS
GV BS

20mmØ PPR COLD WATER LINE

20mmØ PPR COLD WATER LINE

20mmØ PPR COLD WATER LINE

20mmØ PPR COLD WATER LINE


GV GV GV GV
WC LAV KS KS LAV WC
URI URI

URI BS BS URI
WC WC

URI URI
SS SS SS SS
WC WC
LAV LAV BS LAV LAV BS LAV LAV

LAV LAV LAV LAV

LAV LAV LAV LAV

3RD FLOOR WATER LINE LAYOUT

REPUBLIC OF THE PHILIPPINES

PROPOSED THREE (3) STOREY


DEPED DIVISION OFFICE BUILDING P-4
DEPARTMENT OF EDUCATION (LARGE DIVISION)
DEPARTMENT OF EDUCATION

EDUCATION FACILITIES DIVISION 18


MERALCO AVENUE, PASIG CITY
8
E
LIN
R
TE
GV WA
RN HB LD
T TE K
7 OA E
FLVALV CISTAMNP PT
, PU
U MP
R
GV
Ø
PP
CO
R INE
R
L
HP D
P
PP ER)
m E
GVRI
T
.5 RVE
m
1 Ø S
32 WA
- I U
2 SE mm (R LD
UR
I
E 32 WL CO
LA
V
1R C UR
I R V
G V LA
PP
V
W C SS LAINE mØ L
BS V
m
C S S L A 20 ER
W AT
BS
6 E
LIN
WC
BS GV
BS
DW
CO
L
INE ER C R
RL V W PP
TE
AT LA V
Ø
A DW LA mm
V
DW OL 32
LA
OL RC
RC PP
INE
PP
Ø
mm RL
mØ 20 E
5 m AT
32 DW
OL
RC
PP
mØ m
32
CVWM
GV

4 INE
RL
ATE
DW
OL
RC
PP
Ø
mm
32
3

2 INE
RL
A TE
DW
OL
RC
PP
Ø
mm
32
1 E
LIN
R
WC GV
TE
WA
R ) WC LD
CO V
PPSER WC LA R V
Ø I BSGV PPLA
mm (R LA
V
Ø
HB 32CWL mm
V 20
LA
INE I WC
RL
V
G UR BS
I V
UR
TE
WA I LA V
OLUR
D L A
V
RC LA
PP
Ø
mm
20

B
C

D
GROUND FLOOR ISOMETRIC
E
WATER LINE LAYOUT

REPUBLIC OF THE PHILIPPINES

PROPOSED THREE (3) STOREY


DEPED DIVISION OFFICE BUILDING P-5
DEPARTMENT OF EDUCATION (LARGE DIVISION)
DEPARTMENT OF EDUCATION

EDUCATION FACILITIES DIVISION 18


MERALCO AVENUE, PASIG CITY
8

7 R
LIN
E
ER
PP R) GVRI AT
Ø ISE U
W
mm (R UR
I LD
32 WL V
O
I RCLA
C UR LA
PP V
SS V
C GV LA
Ø
W mm
CBS WB CS
S S A V 20
W L
BS
6 INE
RL
WC
BS GV
CS
WB
BS
TE V W C
A LA V
DW LA
OL V
RC LA
PP
Ø
mm
20
5

2
KS
D
OL
R CNE
PP LI
m
L AØAVTER
32m W

1 RL
WC
INE
BS
WC GV
TE A
DW
R ) WC OL V
PP R C LA
RC
Ø ISE BSWV LA
PP V
2 mmL (R S
G
SS LA
V
Ø
3 W BWC mm
C
SC SS
20
BW V
E A
L WC
LIN GVURI BS
R I V
UR
TE A
WA I L V
LD UR LA V
CO L A
R
PP
Ø
mm
20

B
C

D
E
2ND FLOOR ISOMETRIC WATER LINE LAYOUT

REPUBLIC OF THE PHILIPPINES

PROPOSED THREE (3) STOREY


DEPED DIVISION OFFICE BUILDING P-6
DEPARTMENT OF EDUCATION (LARGE DIVISION)
DEPARTMENT OF EDUCATION

EDUCATION FACILITIES DIVISION 18


MERALCO AVENUE, PASIG CITY
8

7 R
LIN
E
ER
PP R) GVRI
T
Ø ISE WA
U
mm (R I D
32 WL UR I RC
OL
LA
V
C UR LA
PP V
BS BSWC SS LA
V
WC GV

BS CS V m
WC
WS LA 20

6 E
LIN
AV BS
WC
GV
LDL WC
R
TE V WC BS
CO E WA LA
R LIN LA
V
PPTER LD V
Ø CO LA
mm S WA R
32 K PP
Ø
mm
20
5

2
KS
D
OL
R CNE
PP LI
m
L AØAVTER
32m W

1 RL
INE
BS
WC
WC GV
TE A
DW
R ) WC OL V
PP R C RCLA
Ø ISE BSWV LA
PP V
2 mmL (R S
G
SS LA
V Ø
3 W BWC mm
C
SC SS
20
BW V
E LA WC
LIN GVURI BS
R I V
UR
TE A
WA I L V
D L UR LA V
CO
R LA
PP
Ø
mm
20

B
C

3RD FLOOR ISOMETRIC WATER LINE LAYOUT

REPUBLIC OF THE PHILIPPINES

PROPOSED THREE (3) STOREY


DEPED DIVISION OFFICE BUILDING P-7
DEPARTMENT OF EDUCATION (LARGE DIVISION)
DEPARTMENT OF EDUCATION

EDUCATION FACILITIES DIVISION 18


MERALCO AVENUE, PASIG CITY
1 2 3 4 5 6 7

50 mmØ PVC 50mmØ PVC 150mmØ PVC SOIL PIPE 150mmØ PVC SOIL PIPE 150mmØ PVC SOIL PIPE FCO 50mmØ PVC 50 mmØ PVC
LOOPED VENT VENT STACK 100mmØ PVC MAINTAIN 2% SLOPE MAINTAIN 2% SLOPE 100mmØ PVC VENT STACK LOOPED VENT
100mmØ PVC SOIL STACK SOIL STACK
A

FCO SOIL PIPE FCO


FCO FCO

100mmØ PVC
URI URI

SOIL PIPE
WC WC FD WC FD WC WC FD WC FD WC WC

100mmØ PVC
50mmØ PVC BACK VENT PIPE

50mmØ PVC BACK VENT PIPE

50mmØ PVC BACK VENT PIPE

50mmØ PVC BACK VENT PIPE


SOIL PIPE
FD FD FD FD
URI URI

50mmØ PVC
SEWER LINE
50mmØ PVC

SEWER LINE
WC WC
URI URI
FD FD
FD FD
FD SS SS SS
SS FD
LAV LAV
SS WC WC SS
LAV FCO LAV LAV FCO LAV
FD FD FD FD
LAV LAV LAV LAV

FCO FCO FCO FCO


B
C
D
E
F

GROUND FLOOR
SEWER LINE LAYOUT

REPUBLIC OF THE PHILIPPINES

PROPOSED THREE (3) STOREY


DEPED DIVISION OFFICE BUILDING P-8
DEPARTMENT OF EDUCATION (LARGE DIVISION)
DEPARTMENT OF EDUCATION

EDUCATION FACILITIES DIVISION 18


MERALCO AVENUE, PASIG CITY
1 2 3 4 5 6 7 8

100mmØ PVC
50mmØ PVC SOIL STACK 50mmØ PVC
50 mmØ PVC
100mmØ PVC INDIRECT
LOOPED VENT VENT STACK VENT STACK
SOIL STACK DRAIN OF REF. 50mmØ PVC BACK VENT PIPE
FCO 100mmØ PVC
A URI SOIL PIPE
WC
FCO
WC FD WC FD WC
WC LAV
FD
FD CO KS CO
GT FCO
FCO
WC
WCFD WCFD
WC 50mmØ PVC URI
FCO

50mmØ PVC BACK VENT PIPE


FD 100mmØ PVC SEWER PIPE

50mmØ PVC BACK VENT PIPE


URI FD 100mmØ PVC SOIL PIPE FD FD
FCO SOIL PIPE FD

50mmØ PVC BACK VENT PIPE


50mmØ PVC BACK VENT
FCO URI
WC WC

50mmØ PVC SEWER PIPE

50mmØ PVC SEWER PIPE


URI URI
FD FD
SS FD FD SS FD

PIPE
FD SS SS
LAV LAV
SS WC LAV LAV WC SS
LAV FCO FCO LAV
FD 100mmØ PVC FD FD 100mmØ PVC FD
LAV SOIL PIPE SOIL PIPE LAV
LAV LAV

FCO FCO FCO FCO

2ND FLOOR SEWER LINE LAYOUT

REPUBLIC OF THE PHILIPPINES

PROPOSED THREE (3) STOREY


DEPED DIVISION OFFICE BUILDING P-9
DEPARTMENT OF EDUCATION (LARGE DIVISION)
DEPARTMENT OF EDUCATION

EDUCATION FACILITIES DIVISION 18


MERALCO AVENUE, PASIG CITY
1 2 3 4 5 6 7 8

100mmØ PVC
50mmØ PVC SOIL STACK 50mmØ PVC
50 mmØ PVC
100mmØ PVC INDIRECT
LOOPED VENT VENT STACK VENT STACK
SOIL STACK DRAIN OF REF.
50mmØ PVC BACK VENT PIPE 50mmØ PVC BACK VENT PIPE
FCO 100mmØ PVC
FD
A URI SOIL PIPE
WC
FCO
WC FD WC FD WC
WC LAV
FD
FD CO KS CO
GT FCO
CO KS CO
GT
FCO FD
FD LAV
WC
FCO
WC
WCFD WCFD
WC 50mmØ PVC URI
FCO
50mmØ PVC BACK VENT PIPE

FD 100mmØ PVC SEWER PIPE

50mmØ PVC BACK VENT PIPE


URI FD 100mmØ PVC SOIL PIPE FD 50mmØ PVC SEWER PIPE FD
FCO SOIL PIPE FD

50mmØ PVC BACK VENT PIPE


50mmØ PVC BACK VENT
FCO URI
WC WC

50mmØ PVC SEWER PIPE

50mmØ PVC SEWER PIPE


URI URI
FD FD
SS FD FD SS FD

PIPE
FD SS SS
LAV LAV
SS WC LAV LAV WC SS
LAV FCO FCO LAV
FD 100mmØ PVC FD FD 100mmØ PVC FD
LAV SOIL PIPE SOIL PIPE LAV
LAV LAV

FCO FCO FCO FCO

3RD FLOOR SEWER LINE LAYOUT

REPUBLIC OF THE PHILIPPINES

PROPOSED THREE (3) STOREY


DEPED DIVISION OFFICE BUILDING P-10
DEPARTMENT OF EDUCATION (LARGE DIVISION)
DEPARTMENT OF EDUCATION

EDUCATION FACILITIES DIVISION 18


MERALCO AVENUE, PASIG CITY
C
PV NT
Ø VE IPE
mm ED TP
50OOP EN
L V
7 UR
O
I
I
CK
BA
C
FC UR
PV
I mØ
C FD UR
m
50
PV K
Ø TAC V
mm S WC FD LA V
50 ENT FD LA
IPE WC
E C
V
PIP PV V
IL Ø C TP LA
O
SO0mm DW EN
FD FD
6 FC
C
10
PV K C
O CF
FCFDW
CB
AC
K V
SS
SS FC
O
Ø TAC W PV LINEVC D SSC FCO
m
E 00m IL
S Ø P VF W
LA
m R
PIP 1 SO
E Ø
m
50 SEW0mm V
IL LA
SO
5
PV
C FD
Ø
0mm
5 E
15 FC
O

P
S LO
2%
IN
TA
IN
MA

4 IL
PIP
E

C SO
PV

0m
15

3 SL
OP
E

2%
T AIN
IN
MA

IPE
2 S OI
LP
C P VC
PVCK
mØ TA mØ
0m S 0m
10SOIL 15
E
C PIP
PV CK T
mØSTA EN
1 5
C T VE
PV EN
0m NT KV
CB
AC
Ø DV PV
mmPE
Ø
50 OO O C mm
L FCFD W E
LIN C 50
WC R PV V
FD WE mØ LA V
IPE PV E
C WC E C SE50m LA
TP mØ PIP C PIP PV
0m IL
EN W D IL Ø
10 I O SO0mm
F C V FD FD
UOR S IKV W LA C O
FC SS W FC
AC 1 0
UR B
I S S
D
F UR
C
PV
D SS FCO
D L AVF

F
mV
LA
50

FD

O
FC

B
C

GROUND FLOOR
ISOMETRIC SEWER LINE LAYOUT

REPUBLIC OF THE PHILIPPINES

PROPOSED THREE (3) STOREY


DEPED DIVISION OFFICE BUILDING P-11
DEPARTMENT OF EDUCATION (LARGE DIVISION)
DEPARTMENT OF EDUCATION

EDUCATION FACILITIES DIVISION 18


MERALCO AVENUE, PASIG CITY
8
E
PIP
IPE
NT TP
K VE EN
AC
7
V
CK
CB I BA
PV UR O C
Ø FCI PV
mm UR RI mØ
50 C C
PVACK PV IPEFD U 0m 5
Ø T Ø P V
mm S mm R LA
50 ENT C50 WE FD
LA
V
V D W SFED C V
IPE
W CF PVC W LA
TP FD mØ IPE
C C D FD
6 PV CK F
N
W 0m L P VE
mØ TA 10 OSOI SS O
0m L S O CK SS C
PVIPE FC
10 SOI FC WC FC
BA IPE S O
V C FD SWC FC mmØIL P
P
P
Ø WE V
R
0 0 S O
mm ELA 1
50 VC S V
P LA
Ø
m FD m
O 50
FC
5

2 C
PVCK F.
T RE
mØ TA EC F
0 0mIL S D IR IN O CO O
1 SO INDRA KS T FC
V CO G FD
LA FD
NT
VE
P IPE
1 Ø DV
C T
PV EN
C
WC FD VC
P
CK
SO
IL
E BA
PIPPVC
mmPE PV K mØ
Ø
50 OO m Ø TAC O C
FC DW 100m
mm
50
L m S F
50 ENT C V
E
W O PIP LA
V FD FC V
WC
ER
E C W LA
PIP PV E SE
T Ø P
m PIW DC FDPV
C
EN m L D
I 0 I F C V F
UOR10 SO KV Ø
FC
W LA C
FC
O mm
UR
I
CB
AC SS W 50
FD URI PV SS O PVC
V D S F C
LA F V S mmØPIPE
Ø
mm
FD LA50 0
10SOIL
FD

O
FC

B
C

D
2ND FLOOR
E ISOMETRIC SEWER LINE LAYOUT

REPUBLIC OF THE PHILIPPINES

PROPOSED THREE (3) STOREY


DEPED DIVISION OFFICE BUILDING P-12
DEPARTMENT OF EDUCATION (LARGE DIVISION)
DEPARTMENT OF EDUCATION

EDUCATION FACILITIES DIVISION 18


MERALCO AVENUE, PASIG CITY
8
IPE
TP
E
PIP
EN NT
KV VE
AC
7
K
B I AC
C
PV UR O CB
Ø FCI PV
mm C UR URI mØ
50 C V m
PVACK P IPEFD 50
Ø T Ø P V
E mm S mm R LA
PIP 50 ENT C50 WE FD
LA
V
NT V D W SFED C V
VE IPE
W CF PVC W LA
K C TP F D Ø E FD
C V
BA Ø P ACK WC 0mmL PIP FD
6 C
PV mm S
Ø 100 OILAV
T O
FC WC
10 OSOI
FC
KV
AC E
C B PIP
EN

S
SS
SS VC
O Ø P IPE
FC
O

mm S L C PV ER FD SWC FC mm IL P
50 FD W Ø W A V 1 0 0 SO
E mm L
PIP
E
50 VC S V
LA
FD ER P
O S EW mØ FD m
C C
KS T
50
PV FC
O
CO G FD mØ
5 FC
O 50m

2 PVCK
C
EF
.
mØ T A CT F R
0m S IREIN O CO O
10SOIL N D A
I DR K T FS C
V CO G FD
LAT FD
IPE
EN
KV
LP
OI
1
C
E BA
C T
PVVEN WC FD VC S PIPPVC
Ø D C P
mmPE PV K mØ mØ
50 OO Ø TAC O C
FC DW 100m
m
mm S
50
L 50 ENT CF E V
W O PIP LA
V FD FC V
WC
R
E
V C WE LA
PIP P
E
T Ø IPEC CS
FD
EN
I 0 mmIL P W FD V F D PV
UOR10 SO WC
V
CK LA C mØ
O
FC I SS W FC
m
URBA
SS
50
FD URI
C
PV O VC
A VFD SS FC Ø P E
Ø
FD L mm V m IP
LA 50 0m P
10SOIL
FD

O
FC

B
C

D
3RD FLOOR
ISOMETRIC SEWER LINE LAYOUT

REPUBLIC OF THE PHILIPPINES

PROPOSED THREE (3) STOREY


DEPED DIVISION OFFICE BUILDING P-13
DEPARTMENT OF EDUCATION (LARGE DIVISION)
DEPARTMENT OF EDUCATION

EDUCATION FACILITIES DIVISION 18


MERALCO AVENUE, PASIG CITY
1 2 3 4 5 6 7

AD/CB AD/CB AD/CB AD/CB AD/CB AD/CB AD/CB AD/CB


200mmØ PVC STORM DRAIN 200mmØ PVC STORM DRAIN 200mmØ PVC STORM DRAIN 200mmØ PVC STORM DRAIN 200mmØ PVC STORM DRAIN 200mmØ PVC STORM DRAIN 200mmØ PVC STORM DRAIN

DS DS DS DS DS DS DS DS
ACU - 2.5HP ACU - 2.5HP ACU - 2.5HP ACU - 2.5HP ACU - 2.5HP ACU - 2.5HP ACU - 2.5HP ACU - 2.5HP
1 1 1 1 1 1 1 1

200mmØ PVC STORM DRAIN


200mmØ PVC STORM DRAIN

AD/CB AD/CB

DS DS
200mmØ PVC STORM DRAIN

200mmØ PVC STORM DRAIN


ACU - 2.5HP

ACU - 2.5HP
1

1
1 1 1 1 1 1 1 1
ACU - 2.5HP ACU - 2.5HP ACU - 2.5HP ACU - 2.5HP ACU - 2.5HP ACU - 2.5HP ACU - 2.5HP ACU - 2.5HP

DS DS DS DS

DS DS DS DS

200mmØ PVC STORM DRAIN 200mmØ PVC STORM DRAIN 200mmØ PVC STORM DRAIN 200mmØ PVC STORM DRAIN 200mmØ PVC STORM DRAIN 200mmØ PVC STORM DRAIN
200mmØ PVC STORM 200mmØ PVC STORM
AD/CB DRAIN, TAP TO MAIN AD/CB AD/CB AD/CB AD/CB AD/CB AD/CB DRAIN, TAP TO MAIN AD/CB
DRAINAGE LINE DRAINAGE LINE
(VERIFY INVERT) (VERIFY INVERT)

GROUND FLR ACU AND


STORM DRAINAGE LAYOUT

REPUBLIC OF THE PHILIPPINES

PROPOSED THREE (3) STOREY


DEPED DIVISION OFFICE BUILDING P-14
DEPARTMENT OF EDUCATION (LARGE DIVISION)
DEPARTMENT OF EDUCATION

EDUCATION FACILITIES DIVISION 18


MERALCO AVENUE, PASIG CITY
1 2 3 4 5 6 7 8

DS DS DS DS DS DS
A DS
ACU - 2.5HP
1
ACU - 2.5HP
1
ACU - 2.5HP
1
ACU - 2.5HP
1
ACU - 2.5HP
1
DS

ACU - 2.5HP
1

B DS DS

C
ACU - 2.5HP

ACU - 2.5HP
1

1
1 1 1 1 1 1 1 1
1 1
ACU - 2.5HP ACU - 2.5HP ACU - 2.5HP ACU - 2.5HP ACU - 2.5HP ACU - 2.5HP ACU - 2.5HP ACU - 2.5HP ACU - 2.5HP ACU - 2.5HP

D DS DS DS DS

DS DS
DS DS

2ND FLR ACU AND


STORM DRAINAGE LAYOUT

REPUBLIC OF THE PHILIPPINES

PROPOSED THREE (3) STOREY


DEPED DIVISION OFFICE BUILDING P-15
DEPARTMENT OF EDUCATION (LARGE DIVISION)
DEPARTMENT OF EDUCATION

EDUCATION FACILITIES DIVISION 18


MERALCO AVENUE, PASIG CITY
1 2 3 4 5 6 7 8

DS DS DS DS DS DS
A DS
ACU - 2.5HP
1
ACU - 2.5HP
1
ACU - 2.5HP
1
ACU - 2.5HP
1
DS

ACU - 2.5HP ACU - 2.5HP


1 1

B DS DS

C
ACU - 2.5HP

ACU - 2.5HP
1

1
1 1 1 1 1 1 1 1
1 1
ACU - 2.5HP ACU - 2.5HP ACU - 2.5HP ACU - 2.5HP ACU - 2.5HP ACU - 2.5HP ACU - 2.5HP ACU - 2.5HP ACU - 2.5HP ACU - 2.5HP

D DS DS DS DS

DS DS
DS DS

3RD FLR ACU AND


STORM DRAINAGE LAYOUT

REPUBLIC OF THE PHILIPPINES

PROPOSED THREE (3) STOREY


DEPED DIVISION OFFICE BUILDING P-16
DEPARTMENT OF EDUCATION (LARGE DIVISION)
DEPARTMENT OF EDUCATION

EDUCATION FACILITIES DIVISION 18


MERALCO AVENUE, PASIG CITY
1 2 3 4 5 6 7 8 4 5

GD GD
DS DS DS DS
25mmØ uPVC TO CWL PPR DS DS DS
A FD FD FD FD FD RISER/S (VERIFY 2ND FLR.
WATER LINE LAYOUT)
FD FD FD
DS
3"Ø PVC STUB-OUT
3"Ø PVC STUB-OUT TO
304 SS BUCKET (PROVIDE
FOR SPILL OUT
SS MESH WIRE)
TO
304 SS
DOWNSPOUT
BUCKET

WATER
FILTER

2-304 SS
WATER
TANKS

FD FD
B DS
DS

FD FD FD FD
D DS DS DS DS

FD FD FD FD
DS DS DS DS

ROOF PLAN
STORM DRAINAGE LAYOUT

ROOF DECK STORM DRAINAGE


W/ RAIN WATER HARVESTING UNIT

REPUBLIC OF THE PHILIPPINES

PROPOSED THREE (3) STOREY


DEPED DIVISION OFFICE BUILDING P-17
DEPARTMENT OF EDUCATION (LARGE DIVISION)
DEPARTMENT OF EDUCATION

EDUCATION FACILITIES DIVISION 18


MERALCO AVENUE, PASIG CITY
FD

DS
FD FD

S T
FD DS DS
4S E
30 UCK
B PR
W L PLR.
C D )F
TO 2N OUT
VC IFY AY
uP R L R
TE ER FD
Ø /S(VELINE
m
m R WAILT
25 ISE TER F
R A
W
FD DS
SS
04 ER S
2-3WATANK
T
FD
DS

DS D
F

FD
TO E
UT ID
-O OV
UB E(PTR )
ST CK IRE
DS C U
PV S BSH W
GD 3"Ø 4S E
FD T 30SS M
DS B-OU
T
TU OU T
FD C SILL OU
PV SP SP
DS DS 3"ØFOR WN
DO
TO
DS GD
FD

FD
DS

DS
FD

FD

FD
DS

DS
FD

DS

FD
DS ROOF DECK ISOMETRIC
STORM DRAINAGE LAYOUT GROUND FLOOR ISOMETRIC
W/ RAIN WATER HARVESTER STORM DRAINAGE LAYOUT
W/ RAIN WATER HARVESTER
DS

REPUBLIC OF THE PHILIPPINES

PROPOSED THREE (3) STOREY


DEPED DIVISION OFFICE BUILDING P-18
DEPARTMENT OF EDUCATION (LARGE DIVISION)
DEPARTMENT OF EDUCATION

EDUCATION FACILITIES DIVISION 18


MERALCO AVENUE, PASIG CITY

You might also like