EPC OF THE NEW EGBIN METERING STATION

Document Number:
(NEMS)
PLANS TO COMPLY WITH NCD BCL-NGC-EPCNEMS- SEC 1.1b
Revision: TT0 Status: IFS Approval Class: 1
Discipline: TDR
Document Type : TECHNICAL TENDER System / subsystem: Date : 16-01-2019

BAYWOOD CONTINENTAL LIMITED

EPC OF THE NEW EGBIN METERING


STATION

SECTION 1.1b
PLANS TO COMPLY WITH NCD

Rev. Status Rev. Date Revision Memo Issued by Checked by Approved by

TT0 IFS 16-01-2019 Issued For Submission N. Obiajulu U. Okaro C. Ebunoha


This document has been generated by an Electronic Document System. When printed it is considered as for information only copy. The
“controlled copy” is the screen version and it is the holder’s responsibility that he/she holds the latest version.
EPC OF THE NEW EGBIN METERING STATION
Document Number:
(NEMS)
PLANS TO COMPLY WITH NCD BCL-NGC-EPCNEMS- SEC 1.1b
Revision: TT0 Status: IFS Approval Class: 1
Discipline: TDR
Document Type : TECHNICAL TENDER System / subsystem: Date : 16-01-2019

BAYWOOD CONTINENTAL LIMITED PLAN TO COMPLY WITH NIGERIAN


CONTENT DIRECTIVES OF
13TH OCTOBER 2006

1.0 FEED and detailed engineering design for all projects is to be domiciled in Nigeria.

All Detailed and Construction Engineering will be performed by our sub-contractor, Procon Energie,
located at Trans Amadi Industrial Layout, Port Harcourt Rivers State.

Nigerian Content Percentage = 100%

2.0 Project Management Team and Procurement Centers for all projects in the Nigerian Oil and Gas industry
must be located in Nigeria.

Baywood Continental Limited will have its Project Management Team as well as its Procurement Team
located in the Project office at the Fabrication site at Ahaoda, Rivers State. The office will be fully
equipped with all necessary Office tools and Equipment required to project manage the execution.

Nigerian Content Percentage = 100%

3.0 Henceforth, all operators and project promoters must forecast procurement items required for projects and
operational activities and forward the Materials List to NCD on or before 31st January of every year. Also,
a Master Procurement Plan (MPP) for ongoing and approved projects should be submitted to the Nigerian
Content Division of NNPC on or before 31st January of every year.

Not applicable to Baywood Continental Limited.

4.0 Fabrication and integration of all fixed (offshore and onshore) platforms weighing up to 10,000 Tons are to
be carried out in Nigeria. For the fixed platforms (offshore and onshore) greater than 10,000 Tons, all items
in directive 5, pressure vessels and integration of the topside modules are to be carried out in Nigeria.

Baywood Continental Limited will do all fabrication in Ahaoda, Rivers State, Nigeria .

Nigerian Content Percentage = 100%

5.0 Henceforth, fabrication of all piles, decks, anchors, buoys, jackets, pipe racks, bridges, flare booms and
storage tanks including all galvanizing works for LNG and process plants are to be done in Nigeria.

Not applicable for this project.


EPC OF THE NEW EGBIN METERING STATION
Document Number:
(NEMS)
PLANS TO COMPLY WITH NCD BCL-NGC-EPCNEMS- SEC 1.1b
Revision: TT0 Status: IFS Approval Class: 1
Discipline: TDR
Document Type : TECHNICAL TENDER System / subsystem: Date : 16-01-2019

6.0 Henceforth, all flow-lines and risers must be fixed and must be fabricated in Nigeria except for special cases
to be demonstrated and approved by NCD.

Baywood Continental Limited will do all fabrication in Ahaoda, Rivers State, Nigeria

Nigerian Content Percentage = 100%

7.0 Henceforth, Assembling, testing and commissioning of all Subsea valves, Christmas trees, wellheads and
system integration tests are to be carried out in Nigeria.

Not applicable to this project.

8.0 All FPSO contract packages are to be bid on the basis of carrying out topside integration in Nigeria. A
minimum of 50% of the total tonnage of FPSO topside modules must be fabricated in Nigeria.

Not applicable to this project

9.0 All third party services relating to fabrication and construction including but not limited to NDT, mechanical
tests, PWHT as well as certification of welding procedures and welders must be carried out in Nigeria.
Nigerian Institute of Welding must certify all such tests in collaboration with international accreditation
bodies.

Baywood Continental Limited will use Arco Pipeline Limited for its Mechanical Tests, Certification of welding
Procedures/Welders and other inspection services and ensures that Nigerian Institute of Welding must
certify all such tests in collaboration with international accreditation bodies. NDT shall be performed by Arco
Pipeline Limited, located at #69 King Perekule Street, GRA, Port-Harcourt. Nigerian Content Percentage =
100%

10.0 All operators and project promoters must ensure that recommendations for contract awards in respect of
all major projects being forwarded to NNPC/constituted boards of such oil and gas companies for approval
must include evidence of binding agreement by the main contractor with Nigerian Content
Subcontractor(s). Such agreements shall indicate the cost and detailed scope including total man-hours
for engineering, tonnage and manhours of fabrication and relevant defining parameters for materials to
be procured locally as well as other services.

Not applicable to BCL.

11.0 Henceforth, all low voltage Earthing cables of 450/750 V grade and Control, Power, Lighting Cables of
600/1000 V grade must be purchased from Nigerian cable manufacturers.

Baywood Continental Limited is committed to purchasing any required cables for this project from Nigerian
Manufacturers or agents.

3
EPC OF THE NEW EGBIN METERING STATION
Document Number:
(NEMS)
PLANS TO COMPLY WITH NCD BCL-NGC-EPCNEMS- SEC 1.1b
Revision: TT0 Status: IFS Approval Class: 1
Discipline: TDR
Document Type : TECHNICAL TENDER System / subsystem: Date : 16-01-2019

12.0 Henceforth, all Line-pipes, sacrificial anodes, Electrical switchgear, paints, ropes, pigs, heat exchangers and
any other locally manufactured material and equipment must be sourced from in-country manufacturers.
Baywood Continental Limited is fully committed to buying all its pipes, electrical switchgear, paints, ropes,
pigs, heat exchangers and any other locally manufactured material and equipment from in-country
manufacturers or agents. Berger Paints has been nominated for the supply of paints.

Nigerian Content Percentage = 100%

13.0 All carbon steel pressure vessels shall be fabricated in Nigeria.

All pressure vessels, if any, will be fabricated by Baywood Continental Limited in its Ahaoda fabrication yard.

Nigerian Content Percentage = 100%

14.0 All seismic data acquisition projects, all seismic data processing projects, all reservoir management studies
and all data management and storage services are to be carried out in Nigeria.

Not applicable to this project.

15.0 Henceforth, all waste management, onshore and swamp integrated completions, onshore and swamp well
simulations, onshore fluid and mud solids control, onshore measurement while drilling (MWD), logging
while drilling (LWD) and directional drilling (DD) activities are to be performed by indigenous or indigenous
companies having genuine alliances with multinational companies.

Not applicable to this project.

16.0 Henceforth, coating of all Line-pipes and threading of all oil country tubular goods (OCTG) are to be carried
out in Nigeria.

Baywood Continental will comply, if this services is required.

17.0 Henceforth, all concrete barges and concrete floating platforms are to be fabricated in-country.

Not applicable to the project

18.0 Henceforth, operation and maintenance of offshore production units, FPSO and FSO in particular, are to be
performed by Nigerian companies.

Not applicable to the project

19.0 All international codes and standards used in the industry are to be harmonized to support utilization of
locally manufactured products such as paints, cables, steel pipes, rods, sections, ropes etc and to improve
capacity utilization in local industries. Clauses that create impediments for/exclude participation of local
companies should not be included in any ITT

4
EPC OF THE NEW EGBIN METERING STATION
Document Number:
(NEMS)
PLANS TO COMPLY WITH NCD BCL-NGC-EPCNEMS- SEC 1.1b
Revision: TT0 Status: IFS Approval Class: 1
Discipline: TDR
Document Type : TECHNICAL TENDER System / subsystem: Date : 16-01-2019

Baywood Continental Limited will assist local manufacturers of materials to improve their capacity to
meet the specifications and standards in the contract.

20.0 Operators and project promoters must ensure that recommendations for contract award for all drilling
contracts shall include a binding agreement at Technical Evaluation stage for the sourcing of Barite and
Bentonite form local manufacturers.

Not applicable to this contract

21.0 Henceforth, all projects and operations in the Oil and Gas industry must demonstrate strict compliance with
provisions in the insurance Act 2003 and submit a certificate of compliance issued by NAICOM to NCD as
part of technical evaluation requirements for insurance or reinsurance Contracts.
In this respect, NAICOM verified Gross underwriting capacity of Nigerian Registered Insurance companies
must be fully utilized to maximize Nigerian Content before ceding risk offshore.

Baywood Continental Limited will provide all insurance required for the contract through Nigerian Insurance
company (ies).

Nigerian Content Percentage = 100%

22.0 Henceforth, all projects and operations in the Oil and Gas industry must demonstrate strict compliance with
provisions of the Cabotage Act.

Baywood Continental Ltd, is registered with NIMASA and through that the Project will strictly comply with
all relevant requirements of the Act.

23.0 All operators and service providers must make provisions for targeted training and understudy programs to
maximize utilization of Nigerian personnel in all areas of their operations. All operators must therefore
submit detailed training plans for each project and their operations.

Baywood Continental Limited Plans to fully comply.