LOCATION: TITLE:
Western Coast VOLUME IX PART PG-B218
PACKAGE: TECHNICAL SPECIFICATION
DATA NETWORK
SCALE: REV:
None Q A 1 0 - H - 0 4 1 8 C
SUBCONTRACTOR:
Sheet 1 of 10
CONSTRUCTION OF SALES GAS SUPPLY PIPELINE TO YANBU
PLANT PHASE-3 PROJECT
Disclaimer
The content of this document is intended for the exclusive use of Fichtner’s client and
other contractually agreed recipients. It may only be made available in whole or in part to
third parties with the client’s consent and on a non-reliance basis. Fichtner is not liable to
third parties for the completeness and accuracy of the information provided therein.
4871A95/S133Doc-801060045-7070
CONSTRUCTION OF SALES GAS SUPPLY PIPELINE TO YANBU
PLANT PHASE-3 PROJECT
Table of Contents
1. Introduction 4
1.1 Terms and Conditions 4
4871A95/S133Doc-801060045-7070
CONSTRUCTION OF SALES GAS SUPPLY PIPELINE TO YANBU
PLANT PHASE-3 PROJECT
1. Introduction
This document provides an overview to Saline Water Conversion
Corporation (SWWC) network technical specification and standard, it
should be a reference to all contractor working on SWCC data
infrastructure.
· The data network should be fully isolated than another core business
network like DCS.
· The network should be easy to modify to adapt to network growth and
general business changes.
· The network should reliably deliver applications and provide reasonable
response times from any host to any host.
· The network should be secure. It should protect the data that is
transmitted over it and data stored on the devices that connect to it.
· Requirements of the cyber security concept as outlined in part B10 I&C
works shall be considered.
· All materials should be new, unused, branded, not End-of-Life (EoL),
and not End-of-Sale (EoS).
· The documents, layout, diagram and test is part of contracted.
· Provide Scalable Network designs.
· Manageability Network design must be able to manage and support the
network.
· All specifications, settings, adjustable at the discretion of the Department
of IT. The site surveys are required for all SWCC.
4871A95/S133Doc-801060045-7070
CONSTRUCTION OF SALES GAS SUPPLY PIPELINE TO YANBU
PLANT PHASE-3 PROJECT
2.1 Discerption
Network design should follow hierarchical topology to enable designing
network in layers. The benefits are Cost savings, Ease of understanding,
Easy network growth and Improved fault isolation.
Core Layer
The Core-layer (network backbone) provides high-speed, scalable, reliable,
fault tolerance and low-latency connectivity, this layer is only available in
one place (Main building). To serve several distribution switches that
connect different buildings.
4871A95/S133Doc-801060045-7070
CONSTRUCTION OF SALES GAS SUPPLY PIPELINE TO YANBU
PLANT PHASE-3 PROJECT
Distribution Layer
The distribution layer is the isolation point between the network’s access
layers and core layers. The distribution layer is associated with routing,
filtering, and is the communication point between the core layer and the
access layer.
Access Layer
The access layer is used to control user access to the internetwork resources
such as PCs, printers, Wireless client, and IP phones. Access layer services
and devices reside inside each building of a campus, each remote site and
server farm, and at the enterprise edge.
4871A95/S133Doc-801060045-7070
CONSTRUCTION OF SALES GAS SUPPLY PIPELINE TO YANBU
PLANT PHASE-3 PROJECT
4871A95/S133Doc-801060045-7070
CONSTRUCTION OF SALES GAS SUPPLY PIPELINE TO YANBU
PLANT PHASE-3 PROJECT
· UPS
· Pack mounted,
· Management port,
· kVA size depends of number switch +30%,
· Minimum kVA 3000, and
· Cable.
4871A95/S133Doc-801060045-7070
CONSTRUCTION OF SALES GAS SUPPLY PIPELINE TO YANBU
PLANT PHASE-3 PROJECT
· UTP:
· Should be based on a four pair Unshielded Twisted Pair (UTP) that
meets or exceed the transmission performance requirements for
Category 6 (Cat 6) and Cat6a inside Datacenter room that holds
Backbone switch.
· Support 1G at minimum speed
· Color code:
· Pair 1: Blue & White/Blue
· Pair 2: Orange & White/Orange
· Pair 3: Green & White/Green
· Pair 4: Brown & White/Brown
· Fiber:
· Fiber Core indoor/outdoor optic cable, RODENT PROJECTED
STEEL ARMOURED, LSF/OH sheath Singe Mode OS2
· Speed support at least 1/10 Gbps
· 24 core fiber between Core layer and Distribution layer
· 12 core fiber between Distribution layer and access layer
· Network Cabinet
· Access cabinet
· Wall-mount rack (9u – 21u) or Rack Mount
· 600mm X 800mm
· Core & Distribution cabinets
· Rack Mount
· 42U 800mm X 1000mm
· General specifications
· Have removable front and rear doors to encourage airflow from
front to back
· Removable side panels
· Have front Door, Split Rear Door
· Cable Management
· Side to side airflow for network switch equipment
· Removable doors, rack-mount units are marked and numbered
· Patch Panel
· UTP:
· 1U (24 port) or 2U (48 port)
· Shall meet or exceed the requirements for Category 6
· The panels shall feature both T568A and T568B wiring
configurations
· Model connector
· Flexible installation- Install from either front or rear of
faceplate
· Quick identification- Colored Icons provided for port
identification
4871A95/S133Doc-801060045-7070
CONSTRUCTION OF SALES GAS SUPPLY PIPELINE TO YANBU
PLANT PHASE-3 PROJECT
· FIBER:
· 1U or 2U Rack Mount Fiber Tray with 3 holes
· 24 ports LC Fiber Adapter Panels for each holes (connector)
· Support single mode fiber type os2
· Meet or exceed TIA/EIA-568-C.3 requirements
· Support speed 1,10,40 G
· Provides versatility and flexibility with a fully modular solution
· Mount to standard EIA 19” rack rails
· Horizontal and vertical MPO adapters
· Patch cards
· UTP
· Modular cards feature high performance category 6 cable for
optimal flexibility and transmission performance, exceeding
category 6 performance specifications
· Optional color clips can easily be snapped on for additional color
coding
· Integral latch guard protects plug from snagging when pulling
through pathways or cable managers
· 1Meeter, 3Meeter, with different colors
4871A95/S133Doc-801060045-7070