Tittle : Schematic Panel Battery & Cub ABB Double INC
E
E
00 Issued For Approval ARRY Prepared. ARRY Project name Customer Based on Lang. Scale.
02/02/22 Ref. designation =
F 01 08/02/22 ARRY SEPTA
PT. PLN PERSERO
Issued For Approval Checked
COVER Document kind External doc.id
02 Issued For Approval ARRY Approved SEPTA Resp. Tittle. Document Id. F
25/02/22 PT. ARHADI FAJAR SHEET DIAGRAM DCC Page. Cont. Page
ID-PAFP0O2 01 01
Ref Description Date Name Date Prep. 29/02/22 Work order id. REVP01 PERKASA PANEL CUB &ELH
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A
A
INC1
O
I
BLOK ATS
B
B
SPRING QBS
1
INC2
SPRING QBS
2
O
INC1
INC2
INC1
SELECTOR
POSISION
INC2
I
REM
UniSec
C
C
D
D
CABLE POWER
AC MAIN
DAN STATUS
RECTIFIER
CHARGE
E
BATTERY
E
00 Issued For Approval ARRY Prepared. ARRY Project name Customer Based on Lang. Scale.
02/02/22 Ref. designation =
F 01 08/02/22 ARRY SEPTA
PT. PLN PERSERO
Issued For Approval Checked
COVER Document kind External doc.id
02 Issued For Approval ARRY Approved SEPTA Resp. Tittle. Document Id. F
25/02/22 PT. ARHADI FAJAR SHEET DIAGRAM DCC Page. Cont. Page
ID-PAFP0O2 01 01
Ref Description Date Name Date Prep. 29/02/22 Work order id. REVP01 PERKASA PANEL CUB &ELH
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
2 1 X2.2 X2.1
220V
A CB1 AC OUT
X2.4 X2.3
0V 4 3
A
9 9 9
5 R1 5 R2 5 R3
B
13 X1 X1 X1 B
220V
14 X2 X2 X2
R1 L1 L2 L3
AC IN DC OUT BF
C RECTFIER 48V
C
+V 1 2
L1 220V
AC -V CB3 4 CELL BATT
3 4
+V 1 2 X3.1 X3.2
L2 48V DC OUT
-V CB2 X3.4
DCF DC X3.3
3 4
D
D
-Vin +Vin
13 13
48V
48V 48V DC 12V
8 8 8
14 R2 14 R3 DC
12 R1 12 R2 12 R3 +Vo -Vo
E
-X1.1 -X1.2 -X1.3 -X1.4 -X1.5 -X1.6 -X1.9 -X1.10
E
POWER
AC OK DC OUT BF REC OK
MODEM
STATUS RECTIFIER
00 Issued For Approval ARRY Prepared. ARRY Project name Customer Based on Lang. Scale.
02/02/22 Ref. designation =
F 01 08/02/22 ARRY SEPTA
PT. PLN PERSERO
Issued For Approval Checked
COVER Document kind External doc.id
02 Issued For Approval ARRY Approved SEPTA Resp. Tittle. Document Id. F
25/02/22 PT. ARHADI FAJAR SHEET DIAGRAM DCC Page. Cont. Page
ID-PAFP0O2 01 01
Ref Description Date Name Date Prep. 29/02/22 Work order id. REVP01 PERKASA PANEL CUB &ELH
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A
A
D
Spare - (Putih) Spare - (Putih) SPARE D
00 Issued For Approval ARRY Prepared. ARRY Project name Customer Based on Lang. Scale.
02/02/22 Ref. designation =
F 01 08/02/22 ARRY SEPTA
PT. PLN PERSERO
Issued For Approval Checked
COVER Document kind External doc.id
02 Issued For Approval ARRY Approved SEPTA Resp. Tittle. Document Id. F
25/02/22 PT. ARHADI FAJAR SHEET DIAGRAM DCC Page. Cont. Page
ID-PAFP0O2 01 01
Ref Description Date Name Date Prep. 29/02/22 Work order id. REVP01 PERKASA PANEL CUB &ELH
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A
A
00 Issued For Approval ARRY Prepared. ARRY Project name Customer Based on Lang. Scale.
02/02/22 Ref. designation =
F 01 08/02/22 ARRY SEPTA
PT. PLN PERSERO
Issued For Approval Checked
COVER Document kind External doc.id
02 Issued For Approval ARRY Approved SEPTA Resp. Tittle. Document Id. F
25/02/22 PT. ARHADI FAJAR SHEET DIAGRAM DCC Page. Cont. Page
ID-PAFP0O2 01 01
Ref Description Date Name Date Prep. 29/02/22 Work order id. REVP01 PERKASA PANEL CUB &ELH
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A
A
B
B
C
C
D
D
E
E
00 Issued For Approval ARRY Prepared. ARRY Project name Customer Based on Lang. Scale.
02/02/22 Ref. designation =
F 01 08/02/22 ARRY SEPTA
PT. PLN PERSERO
Issued For Approval Checked
COVER Document kind External doc.id
02 Issued For Approval ARRY Approved SEPTA Resp. Tittle. Document Id. F
25/02/22 PT. ARHADI FAJAR SHEET DIAGRAM DCC Page. Cont. Page
ID-PAFP0O2 01 01
Ref Description Date Name Date Prep. 29/02/22 Work order id. REVP01 PERKASA PANEL CUB &ELH
1 2 3 4 5 6 7 8
D
B
E
C
A
F
Lang. Scale.
Cont. Page
01
SETTING CUBICLE ABB DOUBLE INC
DCC Page.
8
8
01
&ELH
1. ACTIVATE ATS
ID-PAFP0O2
Untuk Menggktifkan ATS Posisikan Selector Swicth Pada Posisi
Ref. designation =
~ INC 1&2 (MAIN-MAIN) Tidak ada Prioritas
External doc.id
Document Id.
~ IN - 1 (MAIN-BACKUP) Prioritas di INC1
~ IN - 2 (MAIN-BACKUP) Prioritas di INC2
7
~REM (Pengoprasian Via SCADA)
SHEET DIAGRAM
PANEL CUB
2. DELAY TIME ATS
Document kind
Untuk Delay TIME ATS Tekan MENU Configuration Generic Timers
Based on
Tittle.
6
6
TONGAPC1 On Delay Time 1
Waktu ATS membaca UNDERVOLTAGE Dari PLN PADAM
On Delay Time 2
PERKASA
Waktu Delay Time ATS Prioritas Kembali Ke Prioritas Utama
On Delay Time 4
5
3. Setting Voltage Sensor
Resp.
Untuk Delay TIME ATS Tekan MENU Configuration Measurements
Customer
VMMXU1 Operation (on)
4
4
Num Of phases
-1 out of 3
Ketika Jaringan Hilang 1 phase ATS Akan berpindah
-2 out of 3
CUB SDD
Ketika Jaringan Hilang 2 phase ATS Akan berpindah
-3 out of 3
Ketika Jaringan Hilang 3 phase ATS Akan berpindah
REVP01
V low Limit
Setting Pembacaan Tegangan Drop /dianggap Under Voltage
3
3
.......xUn (20KV) Work order id.
Project name
V low Limit
Setting Pembacaan Tegangan Drop /dianggap Under Voltage
.......xUn (20KV)
Date Prep. 29/02/22
SEPTA
ARRY
SEPTA
Checked
-1 out of 3
Ketika Jaringan Hilang 1 phase ATS Akan berpindah
2
2
ARRY
ARRY
ARRY
Name
-2 out of 3
Ketika Jaringan Hilang 2 phase ATS Akan berpindah
-3 out of 3
02/02/22
08/02/22
25/02/22
Date
.......xUn (20KV)
V low Limit
Setting Pembacaan Tegangan Drop /dianggap Under Voltage
Description
1
.......xUn (20KV)
Ref
00
01
02
E
C
D
A
F
B
D
B
E
C
A
F
Lang. Scale.
Cont. Page
01
COMMUNICATION MANAGEMENT (IEC104)
DCC Page.
8
8
01
&ELH
1. BINARY INPUT(POINT STATUS)
ID-PAFP0O2
1000 = STATUS L/R 1009 = STATUS DOOR OPEN
Ref. designation =
1001 = STATUS OPEN/CLOSE QBS1 1010 = STATUS CHARGE BATTERY
External doc.id
Document Id.
1002 = STATUS OPEN/CLOSE QBS2 1011 = STATUS AC FAIL
1003 = STATUS EARTH CLOSED QBS1 1012 = STATUS BATTERY FAIL
1004 = STATUS EARTH CLOSED QBS1 1013 = STATUS MCB SPRING TRIP
1005 = STATUS HOTLINE TAG 1014 = STATUS ATS ACTIVED
7
7
1006 = STATUS ATS NON PRIORITAS ON 1015 = STATUS SPRING QBS1 CHARGED
SHEET DIAGRAM
1007 = STATUS ATS PRIORITAS 1 ON 1016 = STATUS SPRING QBS2 CHARGED
PANEL CUB
1008 = STATUS ATS PRIORITAS 2 ON
Document kind
2000 = CONTROL (OPEN/CLOSE)QBS1 (DC)
Based on
Tittle.
2001 = CONTROL (OPEN/CLOSE)QBS2 (DC)
6
6
2002 = CONTROL HOTLINE TAG (ACTIVE/NON ACTIVE) (DC)
2003 = CONTROL ATS NON PRIORITAS (ACTIVE/NON ACTIVE) (DC)
2004 = CONTROL ATS PRIORITAS 1 (ACTIVE/NON ACTIVE) (DC)
PERKASA
3. ANALOG INPUT (POIN MEASUREMENTS)
5
3001 = METERING QBS1 PHASE BC (FLOAT)
3002 = METERING QBS1 PHASE CA (FLOAT)
Resp.
3003 = METERING QBS2 PHASE AB (FLOAT)
3004 = METERING QBS2 PHASE BC (FLOAT)
3005 = METERING QBS2 PHASE CA (FLOAT)
Customer
3006 = METERING QBS1 PHASE AB (NORMALIZED)
3007 = METERING QBS1 PHASE BC (NORMALIZED)
4
4
3008 = METERING QBS1 PHASE CA (NORMALIZED)
3009 = METERING QBS2 PHASE AB (NORMALIZED)
3010 = METERING QBS2 PHASE BC (NORMALIZED)
3011 = METERING QBS2 PHASE CA (NORMALIZED)
CUB SDD
REVP01
3
3
Work order id.
Project name
SEPTA
Approved
Prepared.
Checked
2
2
ARRY
ARRY
ARRY
Name
02/02/22
08/02/22
25/02/22
Date
Issued For Approval
Description
1
1
Ref
00
01
02
E
C
D
A
F
B