Professional Documents
Culture Documents
3 7-D412
3 7-D412
>
<SCL xmlns="http://www.iec.ch/61850/2003/SCL"
xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance"
xsi:schemaLocation="http://www.iec.ch/61850/2003/SCL SCL.xsd">
<Header id="B412_BUS REACTOR" nameStructure="IEDName" revision="7" version="3">
<Text>3.7->MODIFIED DEADBAND,DO FOR CSD BYPASS
3.6--->PROFILE CHANGED FOR CARDS
3.5-->89A INTERLOCK CHANGED
3.4->modified mac & appid of 410,411,4dc2
3.3-->89A INTERLOCK LINK CHANGED
3.2-->GOOSING DONE FOR B412
3.1.3-->LEGACY NETWORK MODIFIED
3.1.2->ERRORS CLEARED
3.1.1-->RELAY CONFIGURED
3.1.0->MODIFIED POINTS QIVEN BY THE CUSTOMER
3.0->CONFIGURED L CARD AS PER THE SCHEME
2.72.44->CONFIGURED L CARD AS PER THE SCHEME
2.72.43---> KETHIREDDYPALLI DB CHECK
2.72.42--->SF6 SCALING
2.7.41--->SF6 SCALING
2.72.40--->MV PROFILE STATEMENT CHANGE
2.72.39--->vt selection interlock bay 402 52 inverter
2.72.38--->vt selection interlock bay 401 isolator inverter
2.72.37--->SF6 PRESSURE SCALING CHANGE
2.72.36--->D401,D402,D4C2 ELECTRICAL AND SYSTEM PART DELTED AS PER REQ
2.72.35---->new vt selection iinterlock modifies as per customer requirement
2.72.34-->>>SNTP
2.72.33--->GOOSE CB AND ISOLATOR CONFIGURED
2.72.32->4C2,401,402 LINK GOOSE CNFG
2.72.31->rcb changes
2.72.30->rcb changes
2.72.29-> rcb changes
2.72.28-> rcb changes
2.72.27->RCB LINK CNFG
2.72.26->DR LINK CNFG
2.72.25->AUTO LINK SERVER
2.72.24->D410,D402,4C2 CNFG LOGIC
2.72.23->MODIFICATION BUS VT, TVM SCALING & MODBUS ADDRESS, METERING VRN
CNFG
2.72.22->MODIFICATION BUS VT, TVM SCALING & MODBUS ADDRESS, METERING VRN
CNFG
2.72.21->SECURE ACTIVE POWER CNFG
2.72.20->SECURE ACTIVE POWER CNFG
2.72.19->SECURE ACTIVE POWER CNFG
2.72.18->secure cnfg
2.72.17->SNTP IP CNFG
2.72.16->SECURE ENERGY METER FUNCTION CODE CNFG
2.72.15-->secure scalling changes done
2.72.14-->bus vt logic 89L Invert
2.72.13-->B401 P444 RLY CNFG
2.7.12-->89R LOCAL MODE PROFILE CNFG
2.7.11-->89A,89R,89 ISO LOCAL REMOTE CNFG CHANGES
2.7.10-->89 fbd changes
2.76.9-->SECURE ENERGY METER MAPPING ADDRESS & SCALING ALSO CHANGED
2.76.8-->bus vt sel
2.76.7-->bus vt sel
2.72.6-->89A & 89R ISO FBD CLOSE /OPEN INTL CNFG CHANNGES
2.72.5-->SECURE SCALING CHANGES
2.72.4-->SPARE & SECURE SCALING CHANGES
2.72.3-->secure meter cnfg changes
2.72.2-->secure meter cnfg changes
2.72.1-->B403 REACTIVE POWER SCALING CHANGES DONE
2.72.0-->NAME &BUS VT CORRECTION COMPLETED
2.72---->ACTIVE AND REACTIVE POWER SCALING CHNAGED
2.70.1---->ACTIVE AND REACTIVE POWER SCALING CHNAGED
2.69.1---->MFM FUNCTION ID CHANGED
2.68------>FAT TESTING POINTS CORRETED BY FAT TEAM
2.67.5--->CLEAN AND SAVE DONE
2.67.4---->DB FOR GEN
2.67.3--->UNWANTED ELE DELETED
2.67.2--->MFM ADDED AND VALIDATION POINTS COMPLETED
2.67.0--->VALIDATION IN PRG
2.67--->DB COMPLETED
2.66.3--->ONLY CLARIFICATION POINTS PENDING
2.66.2--->LED MAPPING DONE
2.66.1--->TEMPLETE CRTD
2.66.0--->DB UPGRADED 5.15.45.0
2.66----->SA DONE ERROR CLEARED COMPILED PLCC ERROR CLEARED 87R SPARED FINAL
93 ERROR
2.60-------->96 error reduced
2.59.60--------->128 ERROR INBUILT SIGNALS SPARED LHMI NAME CARD DONE SPS
DPS RENAMED TEMPLATE IMPORTED
2.59.28-->RED87L2 407&410 ICD IMPORED
2.59.24--->407 P546 ICD IMPORED
2.59.24---407&410 SCALLING MODIFICATION DONE
2.59.22->413 & 426 IED ICD are imported
2.59.21->AS PER NEW SCHEME(AMENDMENT)
2.59.20->AS PER NEW SCHEME
2.59.18->FOR GEN
2.59.17->86 GEN ERRORS
2.59.14->IEDs INSTANTIATED
2.59.11->BCU INSTANTIATED
2.59.9-->B410 INSTANTIATED
2.59.6-->P CARD COMPLETED-B407
2.59.4-->B413 & B416 Feedback points completed
2.59.2-->Corrected as per Scheme
2.59.1-->2 Line Panels are added
2.59.0-->REF PHASE WISE CONFIGURED ON LV GE 64T RELAY
2.59-->MUTED ALARMED PROFILE CONFIGURED FOR ALL GE RELAY SIGNALS AND GRAPHICS
MODIFICATION DONE
2.58.2-->OLTC CONTROL
2.58.1-->ADDITIONAL ICT SIGNAL CONFIGURED AS PER SCHEME ON HV AND LV
2.58.0-->OLTC PRV TRIP ASSIGNED FOR ICT LV SIDE
2.58--> CB SOE RECONFIGURED FOR 220kV LINE 400kV TIE ICT
2.57-->GATEWAY ADDRESS CHANGED FOR CONTROL
2.56.3-->AR FOR 214
2.56.2-->213 D60 RELAY TEMPLATE BREAKED
2.56.1-->214 D60 RELAY TEMPLATE BREAKED
2.56.0-->220kV LINE BAY SYNCH CONFGD AS PER SCHEME
2.56-->BAY 213 AND 214 GATEWAY SIGNAL CONFIGURED. GRAPHICS MODIFICATION DONE
2.55.0-->89TE STATUS ASSIGNED ON ICT LV 89A AND 89B INTERLOCK LOGIC
2.54.0-->BUSBAR GRAPHICS CONFIGURED
2.54-->GATEWAY SIGNAL CONFIGURED AND GEN FOR ALL BAYS
2.53.3-->LV CB OPEN STATUS OUTPUT CONFIGURED
2.53.2-->LV ICT TMU CARD SETTINGS MODIFIED FOR SYNCH
2.53.1-->GATEWAY SIGNAL CONFIGURED
2.53.0-->GRAPHICS MODIFICATION DONE
2.53-->INCOMING SUPPLY-2 ON SYNCHRO SCHEME AND 207 LV T60 RELAY CONFIGURED.
2.52.1-->INTERLOCKS MODIFIED AS PER SCHEME ON 414 TIE BAY.
2.52.0-->SYNCHRO CHECK MODIFICATION DONE. GRAPHICS MODIFIED
2.52-->CT RATIO CHANGED FOR ICT METERING. CB OPEN AND CLOSE POSITION CONFGD FOR
ICT, TIE AND LV ICT.
2.51.1-->MODIFIED D60 RELAY ICD FILES IMPORTED
2.50.0-->MODIFIED D60 RELAY ICD FILES IMPORTED
2.50-->MODIFIED D60 RELAY ICD FILES IMPORTED. SYNCHRO CHECK REFERENCE PHASE
CHANGES AS B
2.49.0-->SYNCHRO CHECK REFERENCE PHASE CHANGES AS A AS PER SCHEME ON ICT BAYS
2.49-->T60 RELAY GRAPHICS MODIFIED
2.48.0-->T60 RELAY CONFIGURED
2.48-->ALARMS SOUNDS CHANGED
2.45-->D60 403 REPORTS CHANGED FOR DISTANCE
2.44-->FINAL ALARMS CORRECTION
2.43-->FINAL ALARMS CORRECTION
2.42-->T101 GTW SIGNALS ADDED UP TO 400 KV ICT-2
2.41-->P444 ADDITIONAL GRAPHICS ADDED
2.40-->NEW ICD
2.39-->D60 ICD FILE MODIFIED
2.38-->ICT P14D PROTECTION SIGNALS CHANGED
2.37-->ICT METERING AND PROT SINALS ADDED
2.36-->T60 AND D60 ICD IMPORTED
2.35-->DISTANCE IN D60 ICD CHANGED
2.33.0-->GRAPHICS CHANGED IN ICT
2.33-->DISTANCE IN D60 ICD CHANGED
2.32-->DISTANCE IN D60
2.31-->TEST DISTANCE IN D60
2.30-->ICT BACK UP GRAPHICS LED ADDED
2.29-->P444 LED RESET
2.28-->P14D LED RESET
2.27-->LED RESET TEST AND GRAPHICS NAME CHANGED
2.26.-->d60 icd changed
2.26-->p741 led reset test
2.24-->T60 ADITIONAL NODES ADDED
2.23-->OI PRINTER ADDED
2.22-->MV POINTS PROFILE CHANGED
2.21.0-->gtw signals added
2.21-->LED RESET OF P741CU
2.20.1--TEST RESET
2.20.0-->ICT LED ADDED
2.20-->ICT CHECKED AND METERING CHANGED IN TIE
2.19-->CYCLE TIME CHANGED IN MV POINTS
2.18-->GTW BUS VTG ADDED
2.17-->GTW SIGNALS CHANGED AS PER TSTRANSCO IO LIST
2.16-->gtw confg
2.15-->NEW VTG SELECTION ADDED
2.14-->VOLTAGE SELECTION CHECKED
2.13-->VOLTAGE SELECTION CHECKED
2.12-->gate wate protocal checked
2.11-->TIE BAY VT GRAPHICS CHANGED
2.9-->tie interlock mode changed
2.8-->GTW IP CHANGED
2.7-->MAPPING CHANGED IN 401BAY
2.6-->MAPPING CHANGED
2.5-->INTERLOCK CHANGED FOR 3 PH TRIP IN LINE
2.3-->PSB ADDED IN D60
2.2--> gateway confg
2.1-->P741CU ADDED
2.0-->P14D AND P741CU GRAPHICS ADDED
1.35-->CCP GRAPHICS CHANGED
1.34-->ANALOG CARD SENSOR RANGE CHANGE IN TIE
1.33-->D60 ADDITIONAL SIGNALS CONFIGURED
1.32-->CHANGES ON 17-4-417
1.26-->LED CONFIGURATION
1.22-->TIE BAY TON TIME CHANGED FROM 500ms TO 2500ms
1.21--> IN TIE BAY 402 CB CLOSE WIRED ON CHANGED
1.20--> IN TIE BAY CB CLOSE WIRED ON CHANGED
1.19--> TIE FBD CHANGED AND 401 LED SIGNALS ADDED
1.12 FAT OBSERVATION UPDATED
1.1:As on 18.12.16
1.0:16.12.16