Javad Iqbal Mattoo PERIOD : From 21 - February - 2023 To 15 - March - 2023

QTY : 02

Measurements
S No. Description / Item Units No.s Quantity Remarks
Length (m) Width (m) Height (m)
CUM 96 3 1.5 1 432.00
2 Gabion Wall
CUM 58 2 1 1 116.00
Steel Rods (25mm dia) KGs 25 - - 1.5 37.50
3 Steel (16mm dia) KGs
Steel (12mm dia) KGs
4 Dry Wall CUM 1 8.7 0.9 1.2 9.40
CUM 1 1.5 2 2.5 7.50
CUM 1 2.5 1 1.9 4.75
CUM 1 2.5 3.5 1.7 14.88
CUM 1 4.3 2.5 2 21.50
5 Placing of Cement Slurry (Miller) CUM 3 - - - 15.00
CUM 7 - - - 42.00
CUM 3 - - - 18.00
CUM 1 - - - 6.00
CUM 5 - - - 30.00
CUM 2 - - - 12.00
6 Placing of Concrete (Miller) CUM 3 - - - 18.00
CUM 5 - - - 30.00
CUM 6 - - - 36.00
CUM 3 - - - 18.00
CUM 3 - - - 18.00
CUM 5 - - - 30.00
7 Shuttring works including supporting Sqm 2 1 - 16 32.00
Materials Sqm 2 0.5 - 8 8.00
Sqm 2 1 - 8 16.00
Sqm 3 0.5 - 14 21.00
Sqm 2 1 - 18 36.00
Sqm 2 1 - 16 32.00
Sqm 2 0.5 - 9 9.00
Sqm 3 0.5 - 7 10.50
Sqm 3 0.5 - 18 27.00
Sqm 2 1 - 14 28.00
Sqm 2 0.5 - 20 20.00
Sqm 2 0.5 - 16 16.00
Sqm 1 1 - 16 16.00
Sqm 2 0.5 - 18 18.00
RM 9 5.7 - - 51.30
8 PVC pipes (Weep holes) RM 9 4.9 - - 44.10
RM 9 6 - - 54.00