You are on page 1of 7

CONTACT DETAIL (FOR NOCPL) CONTACT DETAIL (FOR NCCL)

PROJECT: CONSTRUCTION OF AVIATION FUEL HYDRANT FACILITY AT NAVI MUMBAI AIRPORT Mr. Ranjan Kumar Mr. Shiv Kumar Pandey
RCM Construction Manager
CLIENT : M/s NAVI MUMBAI INTERNATIONAL AIRPORT LTD. Narmada Offshore Constructions Pvt. Ltd. NCC Ltd.
CONTRACTOR : M/s NCC LIMITED Mb.: +91-9769902936 Mb.:+91-6371762607
SUB-CONTRACTOR: M/s. NOCPL
Progress On: 5/3/2024 Reporting Date : 5/4/2024
LOA NO.*******************************************

24" MAINLINE 18" SPURLINE 16" SPURLINE 12" SPURLINE


Sl. No. ACTIVITIES UNIT SCOPE SCOPE SCOPE SCOPE
PREVIOUS TODAY CUMM. PREVIOUS TODAY CUMM. PREVIOUS TODAY CUMM. PREVIOUS TODAY CUMM.
1 CLEAR ROU HANDED-OVER Mtrs. 3840.00 0.00 2280.00 372.00 300.00
2 PIPE RECEIVED
9.53mm THK. Mtrs. 3840.00 0.00
9.53mm THK. Mtrs. 2280.00
9.53mm THK. Mtrs. 372.00
9.53mm THK. 300.00
3 STRINGING Mtrs. 3840.00 0.00 2280.00 372.00 300.00
4 LR BENDS NO
ISSUED NO 15.00 0.00 9.00 1.00 1.00
COATED NO 15.00 0.00 9.00 1.00 1.00
WELDED NO 15.00 0.00 9.00 1.00 1.00
5 VALVE CHAMBER
24" NPS Nos. 7.00 0.00
18" NPS Nos. 3.00
16" NPS Nos. 5.00
12" NPS Nos. 1.00
6 WELDING
TOTAL NO 324.00 0.00 192.00 31.00 25.00
MAINLINE NO 259.00 0.00 153.60 24.80 20.00
TIE-IN NO 65.00 0.00 38.40 6.20 5.00
7 X-RAY/GAMMA RAY/UT
TAKEN NO 324.00 0.00 192.00 31.00 25.00
TOTAL ACCEPTED NO 324.00 0.00 192.00 31.00 25.00
TOTAL REPAIRS NO
% TOTAL REPAIRS %
8 JOINT COATING NO 324.00 0.00 192.00 31.00 25.00
9 LOWERING Mtrs. 3840.00 0.00 2280.00 372.00 300.00
10 HYDRO-TESTING Mtrs. 3840.00 0.00 2280.00 372.00 300.00
PROCUREMENT STATUS NO REQUIREMENT RECEIVED BALANCE AREA OF CONCERN
HTLP 80 for 24" Pipeline NO 339 339
11 HTLP 80 for 18" Pipeline NO 207 100 107
HTLP 80 for 16" Pipeline NO 33 33
HTLP 80 for 12" Pipeline NO 27 27
PROGRESS CONSTRAINTS TODAY'S ACHIEVEMENTS NEXT DAY'S PROGRAMME

REMARKS:

NOCPL NCC NMIAL


CONTACT DETAIL (FOR NOCPL) CONTACT DETAIL (FOR NCCL)
PROJECT: CONSTRUCTION OF AVIATION FUEL HYDRANT FACILITY AT NAVI MUMBAI AIRPORT Mr. Ranjan Kumar Mr. Shiv Kumar Pandey
RCM Construction Manager
CLIENT : M/s NAVI MUMBAI INTERNATIONAL AIRPORT LTD. Narmada Offshore Constructions Pvt. Ltd. NCC Ltd.
CONTRACTOR : M/s NCC LIMITED Mb.: +91-9769902936 Mb.: 6371762607
SUB-CONTRACTOR: M/s. NOCPL
LOA NO.******************************************* Progress On: 5/3/2024 Reporting Date : 5/4/2024

6" SPURLINE 8" SPURLINE 2" SPURLINE 1.5" SPURLINE


Sl. No. ACTIVITIES UNIT SCOPE SCOPE SCOPE SCOPE
PREVIOUS TODAY CUMM. PREVIOUS TODAY CUMM. PREVIOUS TODAY CUMM. PREVIOUS TODAY CUMM.
1 CLEAR ROU HANDED-OVER Mtrs. 234.00 24.00 12.00 12.00
2 PIPE RECEIVED
7.11mm THK. Mtrs. 234.00
7.11mm THK. Mtrs. 24.00
3.91mm THK. Mtrs. 12.00
3.68mm THK. 12.00
3 STRINGING Mtrs. 234.00 24.00 12.00 12.00
4 LR BENDS NO
ISSUED NO 58.00 10.00 0.00 0.00
COATED NO 58.00 10.00 0.00 0.00
WELDED NO 58.00 10.00 0.00 0.00
5 WELDING
TOTAL NO 20.00 8.00 4.00 4.00
MAINLINE NO 14.00 6.00 3.00 3.00
TIE-IN NO 6.00 2.00 1.00 1.00
6 X-RAY/GAMMA RAY/UT
TAKEN NO 20.00 10.00 4.00 4.00
TOTAL ACCEPTED NO 20.00 10.00 4.00 4.00
TOTAL REPAIRS NO
% TOTAL REPAIRS %
7 JOINT COATING NO 58.00 10.00 4.00 4.00
8 LOWERING Mtrs. 234.00 24.00 12.00 12.00
9 HYDRO-TESTING Mtrs. 234.00 24.00 12.00 12.00
PROCUREMENT STATUS NO REQUIREMENT RECEIVED BALANCE AREA OF CONCERN
10 HTLP 80 for 8" Pipeline. NO 6
HTLP 80 for 6" Pipeline. NO 43
PROGRESS CONSTRAINTS TODAY'S ACHIEVEMENTS NEXT DAY'S PROGRAMME

REMARKS:

NOCPL NCC NMIAL


PROJECT: CONSTRUCTION OF AVIATION FUEL HYDRANT FACILITY AT NAVI MUMBAI
AIRPORT
CLIENT : M/s NAVI MUMBAI INTERNATIONAL AIRPORT LTD.
CONTRACTOR : M/s NCC LIMITED
SUB-CONTRACTOR: M/s. NOCPL
LOA NO.*******************************************
PROGRESS
Sl. No. ACTIVITIES UNIT SCOPE
PREVIOUS TODAY CUMM.
Erection of Flange Insulation Kit
1
Gasket set
24" NPS Nos. 14.00
18" NPS Nos. 6.00
16" NPS Nos. 9.00
12" NPS Nos. 2.00
Erection of Pipe Penetration
2
seals
24" NPS Nos. 28.00
18" NPS Nos. 12.00
16" NPS Nos. 18.00
12" NPS Nos. 4.00
3 Pipe penetration seals
24" NPS Nos. 14.00
18" NPS Nos. 6.00
16" NPS Nos. 9.00
12" NPS Nos. 2.00
Installation of Forged Steel
4
Gate valve
2" NPS Nos. 62.00
1" NPS Nos. 56.00
5 Coating of Carbon Steel Tee
24" x 24", Sch STD SMLS, BW Nos. 1.00
24" x 16", Sch STD SMLS, BW Nos. 5.00
24" x 12", Sch STD SMLS, BW Nos. 1.00
8" x 8", Sch STD SMLS, BW Nos. 10.00
6" x 6", Sch STD SMLS, BW Nos. 2.00
6 Installation of Carbon Steel Tee
24" x 24", Sch STD SMLS, BW Nos. 1.00
24" x 16", Sch STD SMLS, BW Nos. 5.00
24" x 12", Sch STD SMLS, BW Nos. 1.00
8" x 8", Sch STD SMLS, BW Nos. 10.00
6" x 6", Sch STD SMLS, BW Nos. 2.00
7 Installation of Carbon Steel Weldolets
24"(R) x 2"(B), Sch STD Nos. 28.00
18"(R) x 2"(B), Sch STD Nos. 12.00
16"(R) x 2"(B), Sch STD Nos. 18.00
12"(R) x 2"(B), Sch STD Nos. 4.00
24"(R) x 6"(B), Sch STD Nos. 7.00
18"(R) x 6"(B), Sch STD Nos. 3.00
16"(R) x 6"(B), Sch STD Nos. 8.00
12"(R) x 6"(B), Sch STD Nos. 12.00
24"(R) x 8"(B), Sch STD Nos. 8.00
18"(R) x 8"(B), Sch STD Nos. 3.00
16"(R) x 8"(B), Sch STD Nos. 1.00
12"(R) x 8"(B), Sch STD Nos. 1.00
8 Installation of Carbon Steel Reducer
8" x 6", Concentric, SMLS, Sch STD Nos. 10.00
9 Installation of Weld neck Flanges
24" NPS,150#, Raised face Nos. 16.00
18" NPS,150#, Raised face Nos. 8.00
16" NPS,150#, Raised face Nos. 11.00
12" NPS,150#, Raised face Nos. 4.00
6" NPS,300#, Raised face Nos. 76.00
2" NPS,150 #, Raised face Nos. 28.00
10 Installation of Blind Flanges
24" NPS,150#, Raised face Nos. 2.00
18" NPS,150#, Raised face Nos. 2.00
16" NPS,150#, Raised face Nos. 4.00
12" NPS,150#, Raised face Nos. 1.00
6" NPS,300#, Raised face Nos. 76.00
2" NPS,150 #, Raised face Nos. 28.00
11 Erection of End cap
24" (600 NPS) Nos. 1.00
16" (450 NPS) Nos. 4.00
8" (200NPS) Nos. 10.00

FOR NOCPL FOR NCCL FOR NMIA


EQUIPMENT DEPLOYMENT STATUS AS PER CONTRACT AS ON

AS ON
TOTAL TO BE
S. NO. EQUIPMENT DETAILS UOM MOBILIZED
DATE
MOBILIZED
1 WELDING GENERATOR NO. 2 2
2 WELDING RECTIFIERS NO. 10 10
3 AUTOMATIC BEVEL CUTTING MACHINE NO. 1 -
4 PIPE CLAMP EXTERNAL NO. 8 2
5 HYDRA CRANE ( 8- 10 TON) NO. 2 2
6 D.G. SET NO. 2 2
7 HOLIDAY DETECTOR NO. 1 1
8 AIR COMPRESSOR FOR SHOTBLASTING NO. 1 1
9 HOPPER FOR SHOT BLASTING NO. 1 1
10 AIR COMPRESSOR 1000 CFM TO 1500 CFM NO. 1 NA
11 X-RAY MACHINE NO. 1
12 MANUAL U.T. MACHINE NO. 1
13 WATER LIFTING & FILLING PUMPS (400 TO 1000 M3/HR) NO. 1
14 PRESSURIZING PUMP NO. 1
15 DEWATERING PUMP (CAPACITY MIN. 60- 80 M3/HR ) NO. 1
16 DEAD WEIGHT TESTER NO. 1
17 GRINDING MACHINE-AG7 NO. 10 12
18 GRINDING MACHINE-AG4 NO. 4 6

MANPOWER DEPLOYMENT STATUS AS PER CONTRACT AS ON


AS ON
TOTAL TO BE
S. NO. DESIGNATION UOM MOBILIZED
DATE
MOBILIZED
1 RESIDENT CONSTRUCTION MANAGER NO. 1 1
2 LEAD ENGINEER-CONSTRUCTION NO. 1 1
3 LEAD ENGINEER-QUALITY CONTROL NO. 1 1
4 LEAD SAFETY OFFICER NO. 1
5 STORE OFFICER NO. 1 1
6 WELDING FORMAN NO. 1
7 WELDER NO. 6
8 FITTER NO. 4
9 GRINDER NO. 4
10 BLASTER NO. 3
11 INSULATOR NO. 3
12 GAS CUTTER NO. 1
13 RIGGER NO. 12
14 HELPER NO. 10
Note: * Due to non-availability of ROW.
NTRACT AS ON 3/May/24

Date of Date of Date of Date of


Nos. Mob. Nos. Mob. Nos. Mob. Nos. Mob. Total Mob
Mob. Mob. Mob. Mob.

11.03.24 -
11.03.24 -
-
15.03.24 -
18.03.24 -
11.03.24 -
11.03.24 -
20.03.24 -
20.03.24 -
-
-
-
-
-
-
-
11.03.24 -
11.03.24 -

NTRACT AS ON 3/May/24

Date of Date of Date of Date of


Nos. Mob. Nos. Mob. Nos. Mob. Nos. Mob. Total Mob
Mob. Mob. Mob. Mob.

11.03.24
11.03.24
11.03.24
11.03.24
11.03.24