COMPOSITE WORKS FOR PIPING, CIVIL &

STRUCTURAL, MECHANICAL, ELECTRICAL AND


INSTRUMENTATION WORKS FOR PRODUCT
RECOVERY IMPROVEMENT PROJECT OF LPG
UNITS AT GAIL, VIJAIPUR

ANNEXURE TO SCC
P a g e 2 of 5

LIST OF MINIMUM KEY CONSTRUCTION EQUIPMENTS /TOOLS & TACKLES TO BE


DEPLOYED

S. NO. EQUIPMENT DESCRIPTION CAPACITY MINIMUM


QUANTITY TO BE
MOBILIZED
1. TYRE MOUNTED/CRAWLER MOUNTED HYDRAULIC 250 T 1
CRANE
2. PICK & CARRY CRANE (F-15 CRANE / PIXEF 215) 2

3. EXCAVATOR - JCB 1

4. DUMPER 15 TONNE 2
5. TRACTOR WITH HYDRAULIC TROLLEY 2

6. DEWATERING PUMPS (3 / 5 HP ELECTRICAL 2


OPERATED

7. DEWATERING PUMPS (5 HP DIESEL OPERATED 1

8. MONO BLOCK ELECTRICAL OPERATED PUMP 2

9. PORTABLE TYPE MULTI GAS DETECTOR 3

10. AREA GAS MONITOR 1

11. HOLIDAY TESTER WITH RING & BRUSH 1

12. RM 800 CONCRETE MIXER WITH DIGITAL DISPLAY ( 1


IN CASE RMC NOT AVAILABLE)
13. TRANSIT MIXER (IF NOT PROVIDED BY THE 6.00 M3 2
RMC
14. CONCRETE PUMP / CONCRETE BOOM PLACER AS REQUIRED

15. BAR CUTTING & BENDING M/C. 2

16. NEEDLE VIBRATORS 3

17. WATER TANKERS 1


COMPOSITE WORKS FOR PIPING, CIVIL &
STRUCTURAL, MECHANICAL, ELECTRICAL AND
INSTRUMENTATION WORKS FOR PRODUCT
RECOVERY IMPROVEMENT PROJECT OF LPG
UNITS AT GAIL, VIJAIPUR

ANNEXURE TO SCC
P a g e 3 of 5

18. TOTAL STATION 1


19. DUMPY/ AUTO LEVEL 1

20. DG SETS As required of


Suitable Capacity and
Nos.
21. WELDING MACHINES 10

22. GRINDING MACHINES 10

23. GAS CUTTING SETS 5

24. MAGNETIC BASE DRILLING MACHINE 2

25. BLAST CLEANING EQUIPMENT 1

26. AIR COMPRESSORS 300 CFM 2

27. SPRAY PAINTING MACHINES (AIRLESS) 1

28. JACK HAMMERS/CONCRETE 3


BREAKERS/PNEUMATIC BREAKERS

29. DIAMOND CUTTER / DIAMOND SAW CUTTER / 2


DIAMOND FLOOR CUTTER (CEDIMA /HILTI)

30. DIGITAL ELCO METER 1

31. TOOLS & TACKLES FOR FIXING PRE COATED AS REQUIRED


STEEL SHEETS
32. SOURCE FOR RADIOGRAPHY 1 SET

33. FLAT BED TRAILOR 40FEET – 20T 1

34. CHAIN PULLEY BLOCKS, D-SHACKLES, WIRE 3MT Cap. And AS REQUIRED
ROPES, BELTS ETC. OF ALL REQUIRED SIZES above

35. PIPE /TUBE BENDING AND CUTTING MACHINE AS REQUIRED

36. PORTABLE DRILLING MACHINE AND HOLE CUTTER 4

37. ELECTRICIAN TOOLS KIT 2


COMPOSITE WORKS FOR PIPING, CIVIL &
STRUCTURAL, MECHANICAL, ELECTRICAL AND
INSTRUMENTATION WORKS FOR PRODUCT
RECOVERY IMPROVEMENT PROJECT OF LPG
UNITS AT GAIL, VIJAIPUR

ANNEXURE TO SCC
P a g e 4 of 5

38. TOOLS & TACKLES FOR FIXING MECHANICAL / HILTI 2


/ CHEMICAL ANCHOR FASTENERS
39. ELECTRICAL CABLE TERMINATION KIT 2

40. ELECTRICAL MEASURING AND TESTING 1


EQUIPMENT
41. OTHER ELECTRICAL EQUIPMENT FOR DB AND FIRE AS REQUIRED
ALARM PANEL INSTALLATIONS
42. TESTING EQUIPMENTS AS REQUIRED

43. PROFILE GAUGE – TO CHECK SURFACE 1


PREPARATION

NOTES:

1. The details of the above key critical equipment in good working condition, required to be mobilized
by the Contractor to complete the work within given time schedule. The actual deployment
schedule of Construction Equipment shall be approved by Engineer-in-Charge depending on job
requirement during the execution. Contractor shall deploy sufficient numbers/categories of
equipment, tools & tackles at any stage, as required and as directed by Engineer-in-Charge to
complete the work within the Time Schedule and quoted price.

2. Contractor to confirm that the above key equipment’s are available with him in good working
condition with all valid certificate and shall be timely mobilized on this project site. Contractor has
the option to hire some of these equipment’s form equipment-hiring agencies also.
3. OWNER/CONSULTANT reserves the right to physically check & verify the availability of these
equipment’s prior to award of work.
4. Contractor shall replace any defective/damaged equipment’s promptly to complete the work
without any time & cost implication to the Owner/CONSULTANT.
5. Testing Equipment’s/ Instruments (as applicable) to be made available with valid calibration