Coal Daily Report

Eastern Coalfields Limiteq KaimahalOP


M/C on M/C
5-'eb-202:
Roi
WHR TRIPS TRIPS/HRi
i00TCAT 78.1 62.0 111 142
100 TBEMI 217 1551 30 28

ii90-TON 18 16 89.3 232.9 165 1.85


Tuiu 189. 451.6 S06 1.62
PC 34 O0 00 #TTV/O
HS35 15.8 7.2 57 .61
S3 174 74.0 425
HS37 149 3.7 h40 4.300
iibivvLL 48.1 i3.5 95.0 4.05
e 19.3 48.0 69 2.58
BH SHOVEL 0.0 0.0 #DIV/O
674 61.5 264 3.92
LOADER 18.2 12 2.20
DOZER 89.5 4.5
GRADERR 19.6
W DOZER 18.2 5.8
W.iÁNK 12.6 3.1

OBHRAIDIFE iDEP.
SHHT (2021-22 (2022-232022-2023 /B O/BRH COAL COMP.
Sl
3.262.65 2909.97 352.68 1,084.60 3901
nd 5,679.16 5385.26 93.90) 986.00 6259
2 rd 2669 59 237569 292 90 1,058 30 292
Production i0,125 ii,611.40 1,482 10,670.92 940.48 3,128.90 13,452
Dy
Monthlv Prog 64399 6026160261 4138 27858.7 76648
jYearly 1TOg S475439 2835823 -26376i6 |. 941104.4 3389414
Av. Wii per
Dumper(CAT+BI100) 7.3
Mine (anacity Av. WH per Dumper(CAT+BH100/Shift- 2.51
Dally, Ask1ng -26251 Cu.M Av. Wll per
Dumper(CATI90) 6.65
1667CM Av. Wii per
Dunper{CAT19G}/St»ist-
Yearly 1000000ln M Kxcavator ok
PcH li.i4.15
Iyd 35.36.37
BE
Loader 86