WEST COAST EXPRESSWAY (TAIPING – BANTING)

TABLE OF CONTENTS

1.0 PROJECT INTRODUCTION


1.1. EXECUTIVE SUMMARY
1.2. CONTRACT PARTICULARS
1.3. PROJECT INFORMATION

2.0 PROJECT ORGANISATION CHART


2.1. PROJECT STRUCTURE
2.2. EPC ORGANISATION CHART
2.3. SITE CONSULTANT ORGANISATION CHART
2.4. WORK CONTRACTOR ORGANISATION CHART

3.0 PHYSICAL WORK PROGRESS STATUS


3.1 SUMMARY OF PRELIMINARY MASTER IMPLEMENTATION
PROGRAMME /TRACKING
3.2 PHYSICAL WORK STATUS
3.3 S-CURVE CHART
3.4 LOOK AHEAD ACTIVITIES TO BE COMPLETED IN COMING 3 MONTHS
3.5 CRITICAL ACTIVITIES ANALYSIS WITH RECOVERY PLAN

4.0 FINANCIAL WORK POGRESS


4.1 S-CURVE CHART
4.2 STATUS OF PROGRESS PAYMENT

5.0 CONTRACT AND PROCUREMENT STATUS


5.1 STATUS OF BUMIPUTRA PARTICIPATION

6.0 AUTHORITY APPROVAL


6.1. STATUS OF LAND AQUISATION
6.2. STATUS OF TRAFFIC MANAGEMENT PLAN
WEST COAST EXPRESSWAY (TAIPING – BANTING)

6.3. STATUS OF UTILITIES RELOCATION SCHEME

7.0 ISSUE AFFECTING PROGRESS

8.0 QUALITY ASSURANCE AND QUALITY CONTROL


7.1 METHOD STATEMENT STATUS
7.2 CONSTRUCTION MATERIAL APPROVAL STATUS
7.3 SUMMARY OF WORKS TESTING
7.4 NON CONFORMANCE REPORT AND ANALYSIS
7.5 CLARIFICATION REQUEST FORM (CRF)

9.0 SITE RECORDS


9.1 SITE MANAGEMENT AND MANPOWER RECORDS
9.2 CONSTRUCTION PLANT AND MACHINERIES
9.3 WEATHER RECORDS

10.0 SAFETY AND HEATH REPORT


9.1 MONTHLY SAFETY AND HEALTH STATISTIC

11.0 RISK MANAGEMENT

12.0 ENVIRONMENTAL MANAGEMENT PROGRAMME

13.0 ATTACHMENT
13.1 SCHEMATIC LAYOUT OF WORK PROGRESS AND PHOTOGRAPH