You are on page 1of 11

TABLE OF CONTENTS

PART 1 - INSTRUCTION TO BIDDERS


1 INTRODUCTION
1.1 xxx

2 INSTRUCTION TO BIDDERS
2.1 GENERAL INSTRUCTIONS
2.1.1 Explanation of Invitation
2.1.2 Constitution of Bidders
2.1.3 Site Visit
2.1.4 Program and Methods
2.1.5 Bid Preparation Period
2.2 PREPARATION OF BIDS

1
2.2.1 Cost of Bidding
2.2.2 Bid Documents and Submissions
2.2.3 Bid Schedules
2.2.4 Alternate Bids
2.2.5 Eligibility and Qualification of Bidders
2.2.6 Technical Proposal, Subcontractors, Manufacturers
2.2.7 Time Schedule
2.2.8 Price Schedule
2.2.9 Language, Currency and Measurement
2.2.10 Bid Validity
2.2.11 Bonds and Letter of Acceptance
2.3 SUBMISSION AND OPENING OF BIDS
2.3.1 Submission and Marking of Bids
2.3.2 Deadline for Submission of Bids
2.3.3 Late Bids
2.3.4 Withdrawal, Substitution and Modification of Bids
2.3.5 Bid Opening
2.4 BID EVALUATION PROCESS
2.4.1 Clarifications, Deviations and Omissions
2.4.2 Examination of bids
2.4.3 Rejection
2.4.4 Bid Evaluation Criteria
2.4.5 Techno – Economic Evaluation
2.5 CONTRACT AWARD
2.5.1 Award Criteria
2.5.2 Notification of Award
2.5.3 Contract Signing
2.5.4 Performance Bond

2
3
PART 2 – SCOPE OF WORK AND EPC TECHNICAL
SPECIFICATIONS

4
5
3 INTRODUCTION
3.1 PRJOJECT DESCRIPTION
3.1.1 Plant Capacity
3.2 SCOPE OF WORK
3.2.1 Sea Water Intake System
3.2.2 Pre-treatment System
3.2.3 Reverse Osmosis System
3.2.4 Potable Water Post- treatment System
3.2.5 Potable Water Storage and Transport
3.2.6 Brine and Other Waste Discharge
3.2.7 General Site Service and Facilities
3.2.8 Ancillary and Support Facilities
3.2.9 Instrumentation and Controls
3.2.10 Plant Electrical Supply

6
3.3 MANDATORY SPARE PARTS
3.4 PLANT PERFORMANCE & GUARANTEES
3.4.1 Schedule of Guarantees
3.4.2 Plant Performance Requirements

4 WATER QUALITY
4.1 INTAKE WATER QUALITY
4.2 PRE- TREATMENT WATER QUALITY
4.3 POTABLE WATER QUALITY
4.4 BRINE AND WASTE STREAM QUALITY

5 EXPECTED EPC CRITERIA & PERFORMANCE


5.1 INTRODUCTION
5.2 ENGINEERING, PROCUREMENT AND CONSTRUCTION TASKS
5.2.1 Design Services
5.2.2 Construction Services
5.2.3 Start-up, Commissioning and Hand Over
5.3 PROJECT TEAM
5.4 QUALITY ASSURANCE & CONTROL
5.5 SITE FACILITIES
5.6 PROJECT SCHEDULE
5.7 PROJECT CODES AND STANDARDS
5.8 ENVIRONMENTAL IMPACT

7
5.9 COMMISSIONING

6 SWRO TECHNICAL SPECIFICATION


6.1 SEA WATER INTAKE SYSTEM
6.1.1 DESCRIPTION
6.1.2 INTAKE STRUCTURE AND PIPING
6.1.3 PROCESS AND EQUIPMENT DESIGN CRITERIA
6.1.4 MATERIAL OF CONSTRUCTION
6.1.5 PROCESS AND EQUIPMENT CONTROL STRATEGY
6.1.6 EQUIPMENT DATASHEETS
6.2 PRE- TREATMENT SYSTEM
6.2.1 DESCRIPTION
6.2.2 PRE-TREATMENT SYSTEM MONITORING
6.2.3 PROCESS AND EQUIPMENT DESIGN CRITERIA
6.2.4 MATERIAL OF CONSTRUCTION
6.2.5 PROCESS AND EQUIPMENT CONTROL STRATEGY
6.2.6 EQUIPMENT DATASHEETS
6.3 REVERSE OSMOSIS SYSTEM
6.3.1 DESCRIPTION
6.3.2 PROCESS AND EQUIPMENT DESIGN CRITERIA
6.3.3 MATERIAL OF CONSTRUCTION
6.3.4 PROCESS AND EQUIPMENT CONTROL STRATEGY

8
6.3.5 EQUIPMENT DATASHEETS
6.4 POST TREATMENT SYSTEM
6.4.1 DESCRIPTION
6.4.2 REMINERALISATION
6.4.3 DISINFECTION
6.4.4 PROCESS AND EQUIPMENT DESIGN CRITERIA
6.4.5 MATERIAL OF CONSTRUCTION
6.4.6 PROCESS AND EQUIPMENT CONTROL STRATEGY
6.4.7 EQUIPMENT DATASHEET
6.5 POTABLE WATER STORAGE AND TRANSPORT
6.5.1 DESCRIPTION
6.5.2 ONSITE STORAGE
6.5.3 PUMPING REQUIREMENTS
6.5.4 PROCESS AND EQUIPMENT DESIGN CRITERIA
6.5.5 MATERIAL OF CONSTRUCTION
6.5.6 PROCESS AND EQUIPMENT CONTROL STRATEGY
6.5.7 EQUIPMENT DATASHEETS
6.6 BRINE AND WASTE DISCHARGE SYSTEM
6.6.1 DESCRIPTION
6.6.2 DISCHARGE RETENTION TANK
6.6.3 DISCHARGE OUTFALL

9
6.6.4 SOLID WASTE HANDLING
6.6.5 PROCESS AND EQUIPMENT DESIGN CRITERIA
6.6.6 MATERIAL OF CONSTRUCTION
6.6.7 PROCESS AND EQUIPMENT CONTROL STRATEGY
6.6.8 EQUIPMENT DATASHEETS
6.7 GENERAL SITE SERVICES AND FACILITIES
6.7.1 BUILDINGS
6.7.2 SEAWATER INTAKE PUMP HOUSE
6.7.3 RO BUILDING AND CHEMICAL STORAGE FACILITIES
6.7.4 ADMINISTRATION BUILDING
6.7.5 WORKSHOP
6.7.6 PAVING AND PARKING
6.7.7 LANDSCAPING
6.7.8 SITE ACCESS
6.8 ANCILLARY AND SUPPORT SERVICES
6.8.1 SERVICE AND INSTRUMENT AIR
6.8.2 FIRE DETECTION, ALARM AND PROTECTION
6.8.3 HEATING, VENTILATION AND AIR CONDITIONING
6.8.4 EQUIPMENT HANDLING
6.8.5 SITE POTABLE WATER
6.8.6 SERVICE WATER
6.8.7 MISCELLANEOUS
6.9 INSTRUMENTATION AND CONTROL
6.9.1 INSTRUMENTATION AND CONTROLS STRATEGY
6.9.2 INSTRUMENTATION AND CONTOLS SYSTEM REQUIREMENTS
6.9.3 PFD’S AND P& IDS

10
6.10 PLANT ELECTRICAL SYSTEM
6.10.1 SITE ELECTRICAL SUPPLY
6.10.2 PLANT HV, MV AND LV SYSTEMS
6.10.3 PLANT UPS SYSTEMS
6.11 PLANT PERFORMANCE REQUIREMENTS AND GUARANTEES
6.11.1 GUARANTEE TESTS
6.11.2 WATER PRODUCTION QUANTITY AND QUALITY GUARANTEE
6.11.3 POWER CONSUMPTION GUARANTEE
6.11.4 CHEMICAL USE PERFORMANCE REQUIREMENTS
6.11.5 CARTRIDGE FILTER REPLACEMENT FREQUENCY
6.11.6 RO MEMBRANE REPLACEMENT FREQUENCY

7 TENDER DRAWINGS AND ATTACHMENTS

11

You might also like