BOOK IV

Table of Content

TABLE OF CONTENTS
PART 5 FORMS AND SCHEDULES

FORM 1.1

FORM OF BID LETTER

FORM 1.2

FORM OF BID LETTER

FORM 2

FORM OF CONTRACT AGREEMENT

FORM 3

BID BOND FORM

FORM 4

FORM OF BANK GUARANTEE FOR ADVANCE PAYMENT

FORM 5

FORM OF BANK GUARANTEE FOR PROGRESS PAYMENT

FORM 6

FORM OF PERFORMANCE BOND

SCHEDULE 1

BASE PRICE

SCHEDULE 2

SCHEDULE 3

SCHEDULE 1.1

SUMMARY PRICE SCHEDULE

SCHEDULE 1.2

DETAILED PRICE SCHEDULE

SCHEDULE 1.3

TRAINING

SCHEDULE 1.4

MANDATORY SPARE PART

SCHEDULE 1.5

MAINTENANCE TOOLS AND TESTING


EQUIPMENT

SCHEDULE 1.6

CONSUMABLES

SCHEDULE 1.7

ENGINEERING DESIGN REVIEW AND


MANUFACTURE & SHOP TEST INSPECTION

SCHEDULE 1.8

UNIT ADJUSTING PRICES

OPTIONAL PRICE
SCHEDULE 2.1

SPECIFIED ALTERNATIVE

SCHEDULE 2.2

BIDDERS ALTERNATIVE

SCHEDULE 2.3

RECOMMENDED SPARE PARTS

BID INFORMATION
SCHEDULE 3.1

ADDENDUM RECEIPT

SCHEDULE 3.2

DEVIATIONS FORM AND EXCEPTIONS TO BID


DOCUMENT

SCHEDULE 3.3

CONTRACT PAYMENT SCHEDULE

SCHEDULE 3.4

PAYROLL OVERHEADS
i

PLTU Kalimantan Selatan (2 x 65 MW)

BOOK IV
Table of Content

SCHEDULE 3.5

LABOUR RATES

SCHEDULE 3.6

EQUIPMENT RENTAL RATES

SCHEDULE 3.7

CONSTRUCTION POWER AND WATER


REQUIREMENTS

SCHEDULE 3.8

CONSTRUCTION STORAGE AREA


REQUIPMENTS

SCHEDULE 3.9

CONSTRUCTION PERSONNEL

SCHEDULE 3.10 INDONESIAN MANUFACTURES GOODS AND


SERVICES
SCHEDULE 3.11 SUBVENDOR LIST
SCHEDULE 4

CONTRACT SCHEDULE KEY DATES

SCHEDULE 5

MINIMUM INFORMATION REQUIRED

SCHEDULE 6

PLANT PERFORMANCE GUARANTEES

SCHEDULE 7

TECHNICAL DATA
7.1

CIVIL AND STRUCTURAL WORKS

7.2.2.

BOILER AND AUXILIARY EQUIPMENT

7.2.3.

STEAM TURBINE AND AUXILIARY EQUIPMENT

7.2.4.

CONDENSER AND FEED WATER HEATING PLANT

7.2.4B
7.2.5.

COOLING TOWER
PLANT WATER SYSTEM

7.2.6.

WASTE WATER TREATMENT SYSTEM

7.2.7.

FIRE PROTECTION SYSTEM

7.2.8.

COMPRESSED AIR SYSTEM

7.2.9.

CHEMICAL FEED SYSTEM

7.2.10.

SAMPLING RACK SYSTEM

7.2.11.

NOT APPLICABLE

7.2.12.

NOT APPLICABLE

7.2.13.

AIR CONDITIONING AND VENTILATION

7.2.14.

ELEVATOR

2.2.1

CRANE AND HOIST

2.2.2

AUXILIARY UTILITY DEVICES

7.2.16.

NOT APPLICABLE

BOOK IV
Table of Content

7.2.17.

MOBILE EQUIPMENT

7.2.18.

COAL HANDLING SYSTEM

7.2.19.

FUEL OIL SYSTEM INCLUDING TANK

7.2.20.

ASH HANDLING SYSTEM

7.3.1.

GENERATOR

7.3.2.

ISOLATED PHASE BUS DUCT

7.3.3.

GENERATOR CIRCUIT BREAKERS

7.3.4.

MEDIUM VOLTAGE SWITCHGEAR

7.3.5.

NON SEGREGATED PHASE BUS DUCT

7.3.6.

POWER DISTRIBUTION CENTRE (PDC)


TRANSFORMERS

7.3.7.

PDC SWITCHGEAR

7.3.8.

MOTOR CONTROL CENTRES

7.3.9.

LOW VOLTAGE MOTORS

7.3.10.

MEDIUM VOLTAGE MOTORS (FOR EACH MOTOR)

7.3.11.

STATION BATTERY AND BATTERY CHARGER

7.3.12.

DC DISTRIBUTION PANELS

7.3.13.

UNINTERUPTIBLE AC POWER SUPPLY

7.3.14.

EMERGENCY DIESEL ENGINE GENERATOR

7.3.15.

CABLE WIRES

7.3.16.

CONDUITS AND FITTINGS

7.3.17.

OUTDOOR AND SUBSTRUCTURE GROUNDING

7.3.18.

BUILDING EQUIPMENT GROUNDING AND LIGHTNING


PROTECTION

7.3.19.

UNIT METERING AND PROTECTION

7.3.20.

LIGHTING

7.3.21.

UNIT AUXILIARY TRANSFORMER

7.3.22.

GENERATOR TRANSFORMER

7.3.23.

NOT APPLICABLE

7.3.24.

AIR INSULATED BUSWORK

7.3.25.

150 kV CIRCUIT BREAKER

7.3.26.

150 kV DISCONNECTOR AND EARTHING SWITCH

7.3.27.

150 kV CURRENT TRANSFORMER

7.3.28.

CAPACITOR VOLTAGE TRANSFORMER

7.3.29.

INDUCTIVE VOLTAGE TRANSFORMER

7.3.30.

LINE TRAP

BOOK IV
Table of Content

7.3.31.

150 kV SURGE ARRESTER

7.3.32.

SWITCHYARD CONTROL SYSTEM

7.3.33.

FAULT RECORDER

7.3.34.

TELECOMMUNICATION FACILITIES

7.3.35.

150 kV CONTROL AND RELAY PANELS : BUSBAR


PROTECTION

7.3.36

BLACK START DIESEL GENERATOR

7.4.

DISTRIBUTED CONTROL SYSTEM

BOOK IV
Table of Content

TABLE OF CONTENTS

SCHEDULE 7.1 CIVIL AND STRUCTURAL WORK


SCHEDULE 7.2 MECHANICAL WORK
SCHEDULE 7.3 ELECTRICAL WORK
SCHEDULE 7.4 DISTRIBUTED CONTROL SYSTEM