Professional Documents
Culture Documents
ﻋﻘﺪ ﻣﺸﺮﻭﻉ ﺍﻧﺸﺎء ﻣﺤﻄﺎﺕ ﺍﻟﺘﺤﻠﻴﺔ ﺍﻟﺼﻐﻴﺮﺓ ﻋﻠﻰ ﺍﻟﺴﺎﺣﻞ ﺍﻟﻐﺮﺑﻲ
West Coast Satellite Desalination Plants Construction Contract
From To
ASRF Consortium, TRACTEBEL Engie,
Prince Sultan Street, Al Khalidiah, (4th Floor) Jeddah, KSA.
Tel : Fax : Tel : Fax :
Email : Email :
From To Project No.
☐ SC ☐ SR ☐ SW ☐ SC ☐ SR ☐ SW 20104
☐ SF ☐ ☐ ☐ SF ☐ ☐ Date
‐D‐ 2239
☐ ER ☐ EH ☐ ‐ ☐ ER ☒ EH ☐ 11‐Jul‐21
☐ AR ☐ AF ☒ AH ☐ AR ☐ AF ☐ AH File No
The following enclosed documents/drawings are presented for the indicated table below:
Sl Project Drawing No. Rev P S Qty
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
1 0 0 D M T U V 0 0 J 1 0 2 A 1 RO Building Ventilation Calculation Report – Duba Megaton 01
‐‐‐‐Nothing Follows ‐‐‐‐‐
P. Purpose S. Status Codes Discipline
0 For Distribution A Approved to Proceed ☐ G General ☐ P Process
1 Issued for Approval B Approved as Noted ☐ C Civil ☐ O Others
2 Issued for Construction C Rejected to be Resubmitted ☐ E Electrical
3 Issued for Information D For Information Only ☐ I Instrumentation
4 As‐Built
☒ M Mechanical
☒ Electronic Email
Transmittal ☐ Electronic Memory (CD/Flash Drive)
Method ☐ Hard Copies
☐ Fax Signature of Sender
D‐2239 Page 1 of 1