NATIONAL HIGHWAYS AUTHORITY OF INDIA
“Consultancy Services for preparation of Report on Physical Condition of the National
Highway stretch on Toll Operate Transfer (TOT) Model.
CULVERT INSPECTION SHEET

Date : 10.08.2021 Weather: Sunny


HIGHWAY / ROAD SECTION : Eastern Peripheral Expressway
CHAINAGE : 7+370 Plan of the Structure
COORDINATES : 712523 3200414
STRUCTURE NO. :

1. CULVERT DETAILS
Type/Structure : Box Distance between Cells : -
No. of Cells : 1 Floor Details : -
Size : 3 Skew : No
Overall Width (m) : 54 Box Thickness : 0.4
Structural Condition : Good Bearing Details : -
Elevation of Structure
Direction of Flow :
(Sketch)
Depth of Stagnant Water from Invert :
2. HEADWALL/RETURN WALL DETAILS
Parapet height from road
Type/Structure
: RCC top 0.25(LHS),0.2(RHS)
Shape : Rectangular At inlet : -
Structural Condition : Good At outlet : -
At inlet : - Length : 5.0(LHS),4.5(RHS)
At outlet : -
3. WIDENING
Preferred side and reason : -
Details of Services : -
Details of Widening already carried out : -

4. INLET/OUTLET CONDITION INLET OUTLET


Scour : No
Sediment Deposits : No
Undergrowth / Other Blockages : No
Details of Protection works
Existing / Required
5. FLOOD LEVELS
Physical signs of flood
-
levels/overtopping :
Local inquiry : -
Annual flood levels : -
Max flood levels : -
Engineering’s estimate of hydraulic
-
adequacy :

6. REMARKS : New Culvert

7. RECOMMENDATIONS :