Professional Documents
Culture Documents
Install Instruction
Install Instruction
Directory
目录
3、
Install 5、 7、
1、Install
Broken Controll Install debuggi
pipe er Cable ng
2、 4、 6、
Install Install Install
Pilot Grapple Grapple
solenoid handle
valve
01
02
03
3
p
4
1
5
1
3
Open
grapple
Close
Grapple
Turn right
Turn left
6
7
Power requirements: The wood grabber is
connected to the output terminal of the power
relay to ensure that the wood grabber system is
powered off when the key is turned off. The
grounding wire of the wood grabber must be
grounded strictly. Failure to strictly ground the
grounding wire will lead to faults.
8
9
Commissioning requirements
after installation
10