The document is a construction drawing for a 175 kW heat pump plant room. It was drawn by H. Panwar, checked by Abhinav, verified by Pardeep, and approved by Sachin. The drawing number is SL-TIG-SCH-HP-175-R0 and it is at a scale of 1:40/20. It was created on 09.02.2021 by ESCO Contractor Siemens Ltd. - BT Division for from/to MPP-II.
The document is a construction drawing for a 175 kW heat pump plant room. It was drawn by H. Panwar, checked by Abhinav, verified by Pardeep, and approved by Sachin. The drawing number is SL-TIG-SCH-HP-175-R0 and it is at a scale of 1:40/20. It was created on 09.02.2021 by ESCO Contractor Siemens Ltd. - BT Division for from/to MPP-II.
The document is a construction drawing for a 175 kW heat pump plant room. It was drawn by H. Panwar, checked by Abhinav, verified by Pardeep, and approved by Sachin. The drawing number is SL-TIG-SCH-HP-175-R0 and it is at a scale of 1:40/20. It was created on 09.02.2021 by ESCO Contractor Siemens Ltd. - BT Division for from/to MPP-II.