Section I: Preparation of Ground

Precutting Paved Surfaces Cutting and Removal of existing walls and fences

Invert Ex Depth
Manhole ID Ground.E
lv Elevatio MH Top
Elevation
Length
(m) Slope% a ) Gravel Road b) Coble and/or a) Masonry b) Reinforced Concrete
n (m) CARE stone

L(m) W(m) A(m2) L(m) W(m) A(m2) L(m) W(m) D(m) V(m3) L(m) W(m) D(m) V(m3)

FLOW-1

MWB 80A 2318.59 2316.78 1.81 1.91 0.00 0.00 0.00 0.00

MWB 80 2324.88 2322.98 1.90 2.0 58 10.09% 52.00 0.70 36.40 6.00 0.70 4.20 0.00 0.00

MWB 79A 2330.44 2328.54 1.9 2 70 7.80% 64.00 0.70 44.80 6.00 0.70 4.20 0.00 0.00

MWB 79 2332.44 2330.54 1.9 2 36 5.28% 30.00 0.70 21.00 6.00 0.70 4.20 0.00 0.00

MWB 124 2335.55 2333.65 1.9 2 50 6.01% 44.00 0.70 30.80 6.00 0.70 4.20 0.00 0.00

MWB 122 2338.17 2336.26 1.91 2.01 45.5 5.54% 39.50 0.70 27.65 6.00 0.70 4.20 0.00 0.00

MWB 120A 2342.02 2340.11 1.91 2.01 67 5.59% 61.00 0.70 42.70 6.00 0.70 4.20 12.80 0.70 0.15 1.34 0.00

MWB 120 2348.78 2346.88 1.9 2 77.5 8.60% 71.50 0.70 50.05 6.00 0.70 4.20 19.35 0.70 0.18 2.44 4.10 0.70 0.35 1.00

MWB 119 2353.43 2351.53 1.9 2 38 11.97% 32.00 0.70 22.40 6.00 0.70 4.20 5.50 0.70 0.20 0.77 0.00

MWB 118 2360.33 2358.52 1.81 1.91 50 13.80% 44.00 0.70 30.80 6.00 0.70 4.20 0.00 0.00
FLOW-2

MWB 79 2332.44 2330.54 1.9 2 0.00 0.00 0.00 0.00

MWB 79B 2334.7 2332.8 1.9 2 53 2.75% 0.00 53.00 0.70 37.10 0.00 0.00

MWB 79C 2336.79 2334.88 1.91 2.01 55.5 4.84% 0.00 55.50 0.70 38.85 0.00 0.00

MWB 79D 2341.78 2339.98 1.8 1.9 49.5 10.09% 0.00 49.50 0.70 34.65 0.00 0.00

FLOW-3

MWB 122 2338.17 2336.26 1.91 2.01 0.00 0.00 0.00 0.00

MWB 123 2340.56 2338.66 1.9 2 43.5 5.27% 0.00 0.00 0.00 0.00

MWB 123A 2344.76 2342.86 1.9 2 60 6.83% 0.00 0.00 0.00 0.00

MWB 123B 2347.63 2345.83 1.8 1.9 45.5 6.31% 0.00 0.00 0.00 0.00

FLOW-4

MWB 123 2340.56 2338.66 1.9 2 0.00 0.00 0.00 0.00

MWB 123C 2344.54 2342.64 1.9 2 61.5 6.31% 0.00 0.00 0.00 0.00

MWB 123D 2348.37 2346.57 1.8 1.9 57 6.72% 0.00 0.00 0.00 0.00

FLOW-5

MWB 120 2348.78 2346.88 1.9 2 0.00 0.00 0.00 0.00

MWB 121A 2352.42 2350.51 1.91 2.01 57.5 6.15% 0.00 0.00 0.00 0.00

MWB 121 2356.62 2354.72 1.9 2 54 7.60% 0.00 0.00 0.00 0.00

MWB 121B 2359.61 2357.71 1.9 2 38.5 7.15% 0.00 0.00 0.00 0.00
MWB 121C 2361.56 2359.76 1.8 1.9 48 4.06% 0.00 0.00 0.00 0.00
FLOW- 15

MW 57AL 2390.35 2387.85 2.5 2.6 0.00 0.00 0.00 0.00

MWB 8 2397.54 2395.04 2.5 2.6 68 10.57% 0.00 0.00 0.00 0.00

MWB 7 2402.92 2400.66 2.26 2.36 70 7.80% 0.00 0.00 0.00 0.00

MWB 15 2406.11 2403.61 2.5 2.6 35 8.32% 0.00 0.00 0.00 0.00

MWB 12 2407.94 2405.44 2.5 2.6 40 4.33% 0.00 0.00 0.00 0.00

MWB 19 2408.71 2406.21 2.5 2.6 19 3.53% 0.00 0.00 0.00 0.00

MWB 20 2410.09 2407.59 2.5 2.6 36 3.56% 0.00 0.00 0.00 0.00

MWB 21 2410.68 2408.18 2.5 2.6 43 1.14% 0.00 0.00 0.00 0.00

MWB 13 2411.71 2409.9 1.81 1.91 31.5 5.15% 0.00 0.00 0.00 0.00

FLOW- 16

MWB 8 2397.54 2395.04 2.5 2.6 0.00 0.00 0.00 0.00

MWB 8A 2399.54 2397.74 1.8 1.9 105.5 2.46% 0.00 0.00 0.00 0.00

FLOW- 17

MWB 7 2402.92 2400.76 2.16 2.26 0.00 0.00 0.00 0.00

MWB 249A 2403.37 2401.3 2.07 2.17 54 1.10% 0.00 0.00 0.00 0.00

MWB 249B 2403.72 2401.81 1.91 2.01 41.5 1.00% 0.00 0.00 0.00 0.00

MWB 249 2404.97 2403.07 1.9 2 50 2.31% 0.00 0.00 0.00 0.00

MWB 248A 2407.76 2405.16 2.6 2.7 27.5 6.87% 0.00 0.00 0.00 0.00

MWB 248 2408.78 2406.88 1.9 2 18 9.56% 0.00 0.00 0.00 0.00

MWB 247 2412.56 2410.76 1.8 1.9 71.5 5.29% 0.00 0.00 0.00 0.00

FLOW- 18

MWB 491 2407.58 2405.48 2.1 2.2 32.5 1.00% 0.00 0.00 0.00 0.00

MWB 9 2411.1 2409.2 1.9 2 54.5 6.63% 0.00 0.00 0.00 0.00

MWB 10 2413.15 2411.25 1.9 2 62.5 3.13% 0.00 0.00 0.00 0.00

MWB 11 2414.08 2412.27 1.81 1.91 31 2.97% 0.00 0.00 0.00 0.00

FLOW- 19

MWB 248A 2407.76 2405.16 2.6 2.7 0.00 0.00 0.00 0.00

MWB 491 2407.58 2405.58 2 2.1 0.00 0.00 0.00 0.00

MWB 6 2407.67 2405.87 1.8 1.9 28.5 1% 0.00 0.00 0.00 0.00

0 0.1 0.00 0.00 0.00 0.00


FLOW- 20
0 0.1 0.00 0.00 0.00 0.00

MWB 15 2406.11 2403.71 2.4 2.5 0.00 0.00 0.00 0.00

MWB 15A 2407.14 2405.33 1.81 1.91 47 3.45% 0.00 0.00 0.00 0.00

0 0.1 0.00 0.00 0.00 0.00

0 0.1 0.00 0.00 0.00 0.00

0 0.1 0.00 0.00 0.00 0.00


FLOW- 27
0 0.1 0.00 0.00 0.00 0.00

MWB 552 2310.04 2308.11 1.93 2.03 0.00 0.00 0.00 0.00
MWB 552A 2314.86 2312.96 1.9 2 55.5 8.74% 0.00 0.00 0.00 0.00

MWB 552B 2322.44 2320.64 1.8 1.9 52.5 14.43% 0.00 0.00 0.00 0.00

0 0.1 0.00 0.00 0.00 0.00


FLOW- 35
0 0.1 0.00 0.00 0.00 0.00
FLOW- 37
0 0.1 0.00 0.00 0.00 0.00

MWB 520 2376.73 2374.23 2.5 2.6 0.00 0.00 0.00 0.00

MWB 519 2377.78 2374.96 2.82 2.92 39.5 1.86% 0.00 0.00 0.00 0.00

MWB 517A 2377.58 2375.29 2.29 2.39 22.5 1% 0.00 0.00 0.00 0.00

MWB 517 2379.97 2375.75 4.22 4.32 36 1% 0.00 0.00 0.00 0.00

MW 57F21A 2379.45 2376.05 3.4 3.5 24.5 1.22% 0.00 0.00 0.00 0.00

MW 57F22 2383.33 2381.43 1.9 2 51.5 10.25% 0.00 0.00 0.00 0.00

MW 57F23 2388.17 2386.26 1.91 2.01 63 7.51% 0.00 0.00 0.00 0.00

MW 57F24H 2391.03 2389.12 1.91 2.01 48.5 5.70% 0.00 0.00 0.00 0.00

MW 57F24 2393.49 2391.58 1.91 2.01 49.5 4.76% 0.00 0.00 0.00 0.00

MW 57F24AA 2397 2395.1 1.9 2 64.5 5.29% 0.00 0.00 0.00 0.00

MW 57F26AS 2403.65 2401.15 2.5 2.6 77 7.73% 0.00 0.00 0.00 0.00

MW 57F26AA 2403.85 2401.32 2.53 2.63 16 1.05% 0.00 0.00 0.00 0.00

MW 57F26 2404.27 2401.77 2.5 2.6 9.5 2% 0.00 0.00 0.00 0.00

MW 57F27 2406.04 2403.54 2.5 2.6 39.50 4.23% 0.00 0.00 0.00 0.00

MW 57F28 2407.94 2405.44 2.5 2.6 39.50 4.56% 0.00 0.00 0.00 0.00

MW 57F29 2409.85 2407.35 2.5 2.6 45.5 3.98% 0.00 0.00 0.00 0.00

MW 57F29F 2410.38 2407.88 2.5 2.6 10 4.30% 0.00 0.00 0.00 0.00

MW 57F30 2412.86 2410.36 2.5 2.6 53.5 4.45% 0.00 0.00 0.00 0.00

MW 57F31 2415.09 2411.63 3.46 3.56 70.5 1.66% 0.00 0.00 0.00 0.00

0 0.1 0.00 0.00 0.00 0.00


FLOW- 38
0 0.1 0.00 0.00 0.00 0.00

MW 57F31 2415.09 2411.63 3.46 3.56 0.00 0.00 0.00 0.00

MW 57F32 2414.22 2412.32 1.9 2 58.50 1.00% 0.00 0.00 0.00 0.00

MW 57F34 2415.08 2413.18 1.9 2 36.00 2.11% 0.00 0.00 0.00 0.00

MW 57F33 2415.95 2413.7 2.25 2.35 28.00 1.50% 0.00 0.00 0.00 0.00

MW 57F33A 2416.26 2414.36 1.9 2 56.00 1.00% 0.00 0.00 0.00 0.00

MW 57F35 2416.97 2415.07 1.9 2 41.50 1.47% 0.00 0.00 0.00 0.00

MW 57F36 2418.55 2416.64 1.91 2.01 53.00 2.78% 0.00 0.00 0.00 0.00

MW 57F36A 2420.55 2418.65 1.9 2 47.50 4.01% 0.00 0.00 0.00 0.00

MW 57F37 2424.45 2422.64 1.81 1.91 70.50 5.53% 0.00 0.00 0.00 0.00

0 0.1 0.00 0.00 0.00 0.00


FLOW- 47
0 0.1 0.00 0.00 0.00 0.00

MWB 509B 2395 2393.1 1.9 2 0.00 0.00 0.00 0.00

MW 57F24Y 2396 2394.1 1.9 2 17.5 5.14% 0.00 0.00 0.00 0.00

MW 57F24Z 2402.96 2401.06 1.9 2 91.5 7.49% 0.00 0.00 0.00 0.00

0 0.1 0.00 0.00 0.00 0.00


FLOW- 48
0 0.1 0.00 0.00 0.00 0.00
MWB 516 2390.56 2388.76 1.8 1.9 0.00 0.00 0.00 0.00

MWB 514 2393.04 2391.13 1.91 2.01 46 5.16% 0.00 0.00 0.00 0.00

MWB 512 2394.79 2392.89 1.9 2 41.5 3.99% 0.00 0.00 0.00 0.00

MWB 510 2396.48 2394.58 1.9 2 43 3.70% 0.00 0.00 0.00 0.00

MWB 497 2398.92 2397.02 1.9 2 43 5.44% 0.00 0.00 0.00 0.00

MWB 497A 2402.06 2400.15 1.91 2.01 60 5.06% 0.00 0.00 0.00 0.00

MWB 497B 2403.43 2401.53 1.9 2 63 2.20% 0.00 0.00 0.00 0.00

MWB 496 2405.02 2403.12 1.9 2 31.5 4.73% 0.00 0.00 0.00 0.00

MWB 495 2406.57 2404.66 1.91 2.01 46.5 3.11% 0.00 0.00 0.00 0.00

MWB 494 2408.78 2406.88 1.9 2 47 4.50% 0.00 0.00 0.00 0.00

MWB 494A 2409.48 2407.57 1.91 2.01 30 1.99% 0.00 0.00 0.00 0.00

MWB 494B 2410.43 2408.53 1.9 2 37.00 2.32% 0.00 0.00 0.00 0.00

MWB 494C 2412.63 2410.83 1.8 1.9 88.5 2.49% 0.00 0.00 0.00 0.00

0 0.1 0.00 0.00 0.00 0.00


FLOW- 53
0 0.1 0.00 0.00 0.00 0.00

MWB 497A 2402.06 2400.25 1.81 1.91 0.00 0.00 0.00 0.00

MW 57F24E 2403.13 2401.32 1.81 1.91 57 1.88% 0.00 0.00 0.00 0.00

0 0.1 0.00 0.00 0.00 0.00


FLOW- 59
0 0.1 0.00 0.00 0.00 0.00

MW 57F26AA 2403.85 2401.45 2.4 2.5 0.00 0.00 0.00 0.00

MW 57F25 2405.72 2403.82 1.9 2 21.5 11.02% 0.00 0.00 0.00 0.00

MW 57F25C 2410.64 2408.74 1.9 2 70.5 6.84% 0.00 0.00 0.00 0.00

MW 57F25A 2413.78 2411.28 2.5 2.6 53.5 4.56% 0.00 0.00 0.00 0.00

MW 57F25B 2416.08 2413.28 2.8 2.9 34 5.59% 0.00 0.00 0.00 0.00

MW 57F25D 2417.87 2416.07 1.8 1.9 81.5 3.30% 0.00 0.00 0.00 0.00

0 0.1 0.00 0.00 0.00 0.00


FLOW- 61
0 0.1 0.00 0.00 0.00 0.00

MW 57F26 2404.27 2401.87 2.4 2.5 0.00 0.00 0.00 0.00

MW 57F26A 2408.29 2406.39 1.9 2 56.5 7.99% 0.00 0.00 0.00 0.00

MW 57F26B 2413.43 2411.63 1.8 1.9 64.5 7.97% 0.00 0.00 0.00 0.00

0 0.1 0.00 0.00 0.00 0.00


FLOW- 62
0 0.1 0.00 0.00 0.00 0.00

MW 57F27 2406.04 2403.64 2.4 2.5 0.00 0.00 0.00 0.00

MW 57F27A 2409.28 2407.37 1.91 2.01 50.5 7.39% 0.00 0.00 0.00 0.00

MW 57F27B 2414.19 2412.39 1.8 1.9 72.5 6.78% 0.00 0.00 0.00 0.00

0 0.1 0.00 0.00 0.00 0.00


FLOW- 67
0 0.1 0.00 0.00 0.00 0.00

MWB 494 2408.78 2406.98 1.8 1.9 0.00 0.00 0.00 0.00

MWB 494E 2410.79 2408.99 1.8 1.9 87.5 2.30% 0.00 0.00 0.00 0.00

0 0.1 0.00 0.00 0.00 0.00


FLOW- 68
0 0.1 0.00 0.00 0.00 0.00

MWB 495 2406.57 2404.76 1.81 1.91 0.00 0.00 0.00 0.00

MWB 495A 2409.37 2407.57 1.8 1.9 88.5 3.17% 0.00 0.00 0.00 0.00

0 0.1 0.00 0.00 0.00 0.00


FLOW- 69
0 0.1 0.00 0.00 0.00 0.00

MWB 496 2405.02 2403.22 1.8 1.9 0.00 0.00 0.00 0.00

MWB 496A 2406.38 2404.57 1.81 1.91 76.5 1.77% 0.00 0.00 0.00 0.00
Section II: Trench Excavation, Backfill & Cart away Section III: Gravity Sewers
Trench Excavation ,Back fill Pipe bedding and Casting of uPVC Sewer
& cart away(m) Trench rock Excavation (m3) surrounding anchor Pipe Supply
blocks & Installation

a)Type A Trench a)Grade 1- Soft rock(m3) b)Grade 2- Hard rock(m3) a) Type 2 b) Type
4 DN 200mm Connection to
bedding the main
bedding a) Type A
trench trunk line
Manhole
0-5
0-2 m 0-3 m 0-4 m
dept m V(m3) V(m3)
depth depth dept L(m) W(m) D(m) L(m) W(m) D(m) Type
h h Type A (A)
Trench trench

- - - - 0.00 0.00 0 0 ###

- 58.00 - - 0.00 0.00 58 58 ###

- 70.00 - - 0.00 0.00 70 70 ###

- 36.00 - - 0.00 0.00 36 36 ###

- 50.00 - - 20 0.7 0.65 9.10 2 0.7 0.9 1.26 50 50 ###

- 45.50 - - 0.00 0.00 45.5 45.5 ###

- 67.00 - - 0.00 0.00 67 67 ###

- 77.50 - - 0.00 0.00 77.5 77.5 ###

38.00 - - - 0.00 0.00 38 38 ###

50.00 - - - 50 0.7 0.25 8.75 50 0.7 1.35 47.25 50 4 50 ###

- - - - 0.00 0.00 0 0 ###

53.00 - - - 0.00 0.00 53 53 ###

- 55.50 - - 0.00 0.00 55.5 55.5 ###

49.50 - - - 0.00 0.00 49.5 49.5 ###

- - - - 0.00 0.00 0 0 ###

- 43.50 - - 0.00 0.00 43.5 43.5 ###

- 60.00 - - 0.00 0.00 60 60 ###

45.50 - - - 0.00 0.00 45.5 45.5 ###

- - - - 0.00 0.00 0 0 ###

- 61.50 - - 0.00 0.00 61.5 61.5 ###

57.00 - - - 0.00 0.00 57 57 ###

- - - - 0.00 0.00 0 0 ###

- 57.50 - - 0.00 0.00 57.5 57.5 ###

- 54.00 - - 0.00 0.00 54 54 ###

- 38.50 - - 0.00 0.00 38.5 38.5 ###


48.00 - - - 0.00 0.00 48 48 ###
- - - - 0.00 0.00 0 0 ###

- 68.00 - - 0.00 0.00 68 68 ###

- 70.00 - - 0.00 0.00 70 70 ###

- 35.00 - - 0.00 0.00 35 35 ###

- 40.00 - - 0.00 0.00 40 40 ###

- 19.00 - - 0.00 0.00 19 19 ###

- 36.00 - - 0.00 0.00 36 36 ###

- 43.00 - - 0.00 0.00 43 43 ###

31.50 - - - 0.00 0.00 31.5 31.5 ###

- - - - 0.00 0.00 0 0 ###

105.50 - - - 0.00 0.00 105.5 105.5 ###

- - - - 0.00 0.00 0 0 ###

- 54.00 - - 0.00 0.00 54 54 ###

- 41.50 - - 0.00 0.00 41.5 41.5 ###

50.00 - - - 0.00 0.00 50 50 ###

- 27.50 - - 0.00 0.00 27.5 27.5 ###

- 18.00 - - 0.00 0.00 18 18 ###

71.50 - - - 0.00 0.00 71.5 71.5 ###

- 32.50 - - 0.00 0.00 32.5 32.5 ###

- 54.50 - - 0.00 0.00 54.5 54.5 ###

- 62.50 - - 0.00 0.00 62.5 62.5 ###

31.00 - - - 0.00 0.00 31 31 ###

- - - - 0.00 0.00 0 0 ###

- - - - 0.00 0.00 0 0 ###

28.50 - - - 0.00 0.00 28.5 28.5 ###

- - - - 0.00 0.00 0 0 ###

- - - - 0.00 0.00 0 0 ###

- - - - 0.00 0.00 0 0 ###

47.00 - - - 0.00 0.00 47 47 ###

- - - - 0.00 0.00 0 0 ###

- - - - 0.00 0.00 0 0 ###

- - - - 0.00 0.00 0 0 ###

- - - - 0.00 0.00 0 0 ###

- - - - 0.00 0.00 0 0 ###


- 55.50 - - 0.00 0.00 55.5 55.5 ###

52.50 - - - 0.00 0.00 52.5 52.5 ###

- - - - 0.00 0.00 0 0 ###

- - - - 0.00 0.00 0 0 ###

- - - - 0.00 0.00 0 0 ###

- - - - 0.00 0.00 0 0 ###

- 39.50 - - 0.00 0.00 39.5 39.5 ###

- 22.50 - - 0.00 0.00 22.5 22.5 ###

- - - 36.00 0.00 0.00 36 36 ###

- - 24.50 - 0.00 0.00 24.5 24.5 ###

- 51.50 - - 0.00 0.00 51.5 51.5 ###

- 63.00 - - 0.00 0.00 63 63 ###

- 48.50 - - 0.00 0.00 48.5 48.5 ###

- 49.50 - - 0.00 0.00 49.5 49.5 ###

- 64.50 - - 0.00 0.00 64.5 64.5 ###

- 77.00 - - 0.00 0.00 77 77 ###

- 16.00 - - 0.00 0.00 16 16 ###

- 9.50 - - 0.00 0.00 9.5 9.5 ###

- 39.50 - - 0.00 0.00 39.5 39.5 ###

- 39.50 - - 0.00 0.00 39.5 39.5 ###

- 45.50 - - 0.00 0.00 45.5 45.5 ###

- 10.00 - - 0.00 0.00 10 10 ###

- 53.50 - - 0.00 0.00 53.5 53.5 ###

- - 70.50 - 0.00 0.00 70.5 70.5 ###

- - - - 0.00 0.00 0 0 ###

- - - - 0.00 0.00 0 0 ###

- - - - 0.00 0.00 0 0 ###

58.50 - - - 0.00 0.00 58.5 58.5 ###

- 36.00 - - 0.00 0.00 36 36 ###

- 28.00 - - 0.00 0.00 28 28 ###

- 56.00 - - 0.00 0.00 56 56 ###

41.50 - - - 0.00 0.00 41.5 41.5 ###

- 53.00 - - 0.00 0.00 53 53 ###

- 47.50 - - 0.00 0.00 47.5 47.5 ###

70.50 - - - 0.00 0.00 70.5 70.5 ###

- - - - 0.00 0.00 0 0 ###

- - - - 0.00 0.00 0 0 ###

- - - - 0.00 0.00 0 0 ###

- 17.50 - - 0.00 0.00 17.5 17.5 ###

- 91.50 - - 0.00 0.00 91.5 91.5 ###

- - - - 0.00 0.00 0 0 ###

- - - - 0.00 0.00 0 0 ###


- - - - 0.00 0.00 0 0 ###

- 46.00 - - 0.00 0.00 46 46 ###

- 41.50 - - 0.00 0.00 41.5 41.5 ###

- 43.00 - - 0.00 0.00 43 43 ###

- 43.00 - - 0.00 0.00 43 43 ###

- 60.00 - - 0.00 0.00 60 60 ###

63.00 - - - 0.00 0.00 63 63 ###

- 31.50 - - 0.00 0.00 31.5 31.5 ###

- 46.50 - - 0.00 0.00 46.5 46.5 ###

- 47.00 - - 0.00 0.00 47 47 ###

- 30.00 - - 0.00 0.00 30 30 ###

37.00 - - - 0.00 0.00 37 37 ###

88.50 - - - 0.00 0.00 88.5 88.5 ###

- - - - 0.00 0.00 0 0 ###

- - - - 0.00 0.00 0 0 ###

- - - - 0.00 0.00 0 0 ###

57.00 - - - 0.00 0.00 57 57 ###

- - - - 0.00 0.00 0 0 ###

- - - - 0.00 0.00 0 0 ###

- - - - 0.00 0.00 0 0 ###

21.50 - - - 0.00 0.00 21.5 21.5 ###

- 70.50 - - 0.00 0.00 70.5 70.5 ###

- 53.50 - - 0.00 0.00 53.5 53.5 ###

- 34.00 - - 0.00 0.00 34 34 ###

81.50 - - - 0.00 0.00 81.5 81.5 ###

- - - - 0.00 0.00 0 0 ###


- - - - 0.00 0.00 0 0 ###

- - - - 0.00 0.00 0 0 ###

- 56.50 - - 0.00 0.00 56.5 56.5 ###

64.50 - - - 0.00 0.00 64.5 64.5 ###

- - - - 0.00 0.00 0 0 ###

- - - - 0.00 0.00 0 0 ###

- - - - 0.00 0.00 0 0 ###

- 50.50 - - 0.00 0.00 50.5 50.5 ###

72.50 - - - 0.00 0.00 72.5 72.5 ###

- - - - 0.00 0.00 0 0 ###

- - - - 0.00 0.00 0 0 ###

- - - - 0.00 0.00 0 0 ###

87.50 - - - 0.00 0.00 87.5 87.5 ###

- - - - 0.00 0.00 0 0 ###

- - - - 0.00 0.00 0 0 ###

- - - - 0.00 0.00 0 0 ###

88.50 - - - 0.00 0.00 88.5 88.5 ###

- - - - 0.00 0.00 0 0 ###

- - - - 0.00 0.00 0 0 ###

- - - - 0.00 0.00 0 0 ###

76.50 - - - 0.00 0.00 76.5 76.5 ###


i
n
i
m
u
m
2
0
0
m
m
b
)t
Section IV: Manholes and Structures h
Section VI:Access
iO Road
Manholes: Supply &
Construct RC Precast Additional rc
Circular manhole as per manhole depth k
d
the drawing detail n
i
e
n
a) Type A- s
a
a) Type A-1000mm Depth greater sr
internal diameter Depth than 1.5m y
1.5m or less o
f
A
s
L
i) with Cast MH g
(p
Iron Cover r
h
and Frame discribion m
)a
v
l
te
l
r
###
o
a
###
d
###
b
a
1 0.4000000000001 s
###
e
1 0.4000000000001
###
a
1 0.4099999999999 n
###
d
1 0.4099999999999
###
a
1 0.4000000000001
###
m
i
1 0.3999999999996
###
n
i
0.31 ###
m
u
m

0 RP 0.4000000000001 o
###
f
1 0.4 ###
2
1 0.4 0
###
0
m
1 0.3 ###
m
s
u
b
0 RP 0.4 b
###
a
1 0.4 s
###
e
1 0.4 ###
o
1 0.3 f
###
a
p
p
r
o
0 RP 0.4 ###
v
e
1 0.4 d
###

1 0.3 m
###
a
t
e
r
i
a
0 RP 0.4 ###
l
;
1 0.4 ###
s
1 0.4 ###
h
a
1 0.4 l
###
l
b
e
s
p
r
e
a
d
1 0.3 ###
0 MT 1.0 ###

1 1.0 ###

1 0.8 ###

1 1.0 ###

1 1.0 ###

1 1.0 ###

1 1.0 ###

1 1.0 ###

1 0.3 ###

0 RP 1.0 ###

1 0.3 ###

0 RP 0.7 ###

1 0.6 ###

1 0.4 ###

1 0.4 ###

1 1.1 ###

1 0.4 ###

1 0.3 ###

1 0.6 ###

1 0.4 ###

1 0.4 ###

1 0.3 ###

0 RP 1.1 ###

0 RP 0.5 ###

1 0.3 ###

0.0 ###

0.0 ###

0 RP 0.9 ###

1 0.3 ###

0.0 ###

0.0 ###

0.0 ###

0.0 ###

0 RP 0.4 ###
1 0.4 ###

1 0.3 ###

0.0 ###

0.0 ###

0.0 ###

0 MT 1.0 ###

1 1.3 ###

1 0.8 ###

1 2.7 ###

1 1.9 ###

1 0.4 ###

1 0.4 ###

1 0.4 ###

1 0.4 ###

1 0.4 ###

1 1.0 ###

1 1.0 ###

1 1.0 ###

1 1.0 ###

1 1.0 ###

1 1.0 ###

1 1.0 ###

1 1.0 ###

1 2.0 ###

0.0 ###

0.0 ###

0 RP 2.0 ###

1 0.4 ###

1 0.4 ###

1 0.8 ###

1 0.4 ###

1 0.4 ###

1 0.4 ###

1 0.4 ###

1 0.3 ###

0.0 ###

0.0 ###

0 RP 0.4 ###

1 0.4 ###

1 0.4 ###

0.0 ###

0.0 ###
0 RP 0.3 ###

1 0.4 ###

1 0.4 ###

1 0.4 ###

1 0.4 ###

1 0.4 ###

1 0.4 ###

1 0.4 ###

1 0.4 ###

1 0.4 ###

1 0.4 ###

1 0.4 ###

1 0.3 ###

0.0 ###

0.0 ###

0 RP 0.3 ###

1 0.3 ###

0.0 ###

0.0 ###

0 RP 0.9 ###

1 0.4 ###

1 0.4 ###

1 1.0 ###

1 1.3 ###

1 0.3 ###

0.0 ###
0.0 ###

0 RP 0.9 ###

1 0.4 ###

1 0.3 ###

0.0 ###

0.0 ###

0 RP 0.9 ###

1 0.4 ###

1 0.3 ###

0.0 ###

0.0 ###

0 RP 0.3 ###

1 0.3 ###

0.0 ###

0.0 ###

0 RP 0.3 ###

1 0.3 ###

0.0 ###

0.0 ###

0 RP 0.3 ###

1 0.3 ###
C
o
n
s
t
r
u
c
t
ci
)o
n
C
o
Section VI: Finishing works rf
r
u
W
g
o
a
r
tk
c ) Gravel Road d) Coble and/or CARE e
i
stone d
n
g
i
rP
W
o
l(
L(m) W(m) A(m2) L(m) W(m) A(m2) n a
m
)ts
f
h
o
e
r
e
m
ts
0.00 0.00 ###

52.00 0.70 36.40 0.00 ###

64.00 0.70 44.80 0.00 ###

30.00 0.70 21.00 0.00 ###

44.00 0.70 30.80 0.00 ###

39.50 0.70 27.65 0.00 ###

61.00 0.70 42.70 0.00 ###

71.50 0.70 50.05 0.00 ###

32.00 0.70 22.40 0.00 ###

44.00 0.70 30.80 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###


0.00 0.00 ###
0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###


0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###


0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###


0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###

0.00 0.00 ###


Takeoff sheet Section I: Preparation of Ground
Project: Construction of New Secondary Sewer line for Selected Area of Kality Catchment (LOT 5)
Location: Adise Abe
Employer : AAWSA-Wa
Consultant : SWS Consultancy
Contractor :

Section I: Preparation of Ground

Manhole Lengt Precutting Paved Surfaces Cutting and Removal of existing walls and fences g) Cart away of any distance
ID h (m) from site
d) Coble and/or CARE
c ) Gravel Road a) Masonry b) Reinforced Concrete V(m3)
stone L(m) W(m) D(m)
L(m) W(m) A(m2) L(m) W(m) A(m2) L(m) W(m) D(m) V(m )
3
L(m) W(m) D(m) V(m ) 3

FLOW-1
MWB 80A
MWB 80
MWB 79A
MWB 79
MWB 124
MWB 122
MWB 120A
MWB 120
MWB 119
MWB 118
FLOW-2
MWB 79
MWB 79B
MWB 79C
MWB 79D
FLOW-3
MWB 122
MWB 123
MWB 123A
MWB 123B
FLOW-4
MWB 123
MWB 123C
MWB 123D
FLOW-5
MWB 120
MWB 121A
MWB 121
MWB 121B
FLOW- 6
MW 57S
MWB 492
FLOW- 15
MW 57AL
MWB 8
MWB 7
MWB 15
MWB 12
MWB 19
MWB 20

Prepared by: Checked by: Approved by

Name---------------- Name---------------- Name----------------


Sig--------------- Sig--------------- Sig------------------

Date------------- Date------------- Date--------------


Takeoff sheet Section I: Preparation of Ground
Project: Construction of New Secondary Sewer line for Selected Area of Kality Catchment (LOT 5)
Location: Adise Abe
Employer : AAWSA-Wa
Consultant : SWS Consultancy
Contractor :

Section I: Preparation of Ground

Manhole Lengt Precutting Paved Surfaces Cutting and Removal of existing walls and fences g) Cart away of any distance
ID h (m) from site
d) Coble and/or CARE
c ) Gravel Road a) Masonry b) Reinforced Concrete V(m3)
stone L(m) W(m) D(m)
L(m) W(m) A(m2) L(m) W(m) A(m2) L(m) W(m) D(m) V(m )
3
L(m) W(m) D(m) V(m ) 3

MWB 21
FLOW- 16
MWB 8
MWB 8A
FLOW- 17
MWB 248A
MWB 248
MWB 247
FLOW- 18
MWB 248A
MWB 491
MWB 9
MWB 10
FLOW- 19
MWB 491
MWB 6
FLOW- 25
MWB 531
MWB 531A
MWB 524
MWB 499
MWB 498
FLOW- 27
MWB 552
MWB 552A
MWB 552B
FLOW- 30
MWB 543
MWB 571
MWB 542
FLOW- 37
MW 57F26AA
MW 57F26
MW 57F27
MW 57F28
MW 57F29
MW 57F30
FLOW- 47
MW 57F24Y
MW 57F24Z
FLOW- 48

Prepared by: Checked by: Approved by

Name---------------- Name---------------- Name----------------


Sig--------------- Sig--------------- Sig------------------

Date------------- Date------------- Date--------------


Takeoff sheet Section I: Preparation of Ground
Project: Construction of New Secondary Sewer line for Selected Area of Kality Catchment (LOT 5)
Location: Adise Abe
Employer : AAWSA-Wa
Consultant : SWS Consultancy
Contractor :

Section I: Preparation of Ground

Manhole Lengt Precutting Paved Surfaces Cutting and Removal of existing walls and fences g) Cart away of any distance
ID h (m) from site
d) Coble and/or CARE
c ) Gravel Road a) Masonry b) Reinforced Concrete V(m3)
stone L(m) W(m) D(m)
L(m) W(m) A(m2) L(m) W(m) A(m2) L(m) W(m) D(m) V(m )
3
L(m) W(m) D(m) V(m ) 3

MWB 497B
MWB 496
MWB 494
MWB 494A
MWB 494B
FLOW- 53
MWB 497A
MW 57F24E
FLOW- 54
MWB 507
MWB 507
MWB 506
MWB 505
FLOW- 59
MW 57F26AA
MW 57F25

TOTAL

Prepared by: Checked by: Approved by

Name---------------- Name---------------- Name----------------


Sig--------------- Sig--------------- Sig------------------

Date------------- Date------------- Date--------------


TAKEOFF SHEET Section II: Trench Excavation, Backfill & Cart away
Project: Construction of New Secondary Sewer line for Selected Area of Kality Catchment (LOT 5)
Location: Adise Abeba, Bethel Area
Employer : AAWSA-Water and Sanitation Development &Reh
Consultant : SWS Consultancy
Contractor :

Section II: Trench Excavation, Backfill & Cart away


Averge
MH Ex Trench Excavation ,Back fill & cart
Manhole Ground Invert Ex Lengt Trench rock Excavation (m3)
Depth Depth away(m)
ID Elv Ele. Depth h (m)
(m) (m)
(m) a)Type A Trench a)Grade 1- Soft rock(m3) b)Grade 2- Hard rock(m3)

0-2 m 0-3 m 0-4 m 0-5 m


L(m) W(m) D(m) V(m3) L(m) W(m) D(m) V(m3)
depth depth depth depth

FLOW-1
MWB 80A
MWB 80
MWB 79A
MWB 79
MWB 124
MWB 122
MWB 120A
MWB 120
MWB 119
MWB 118
FLOW-2
MWB 79
MWB 79B
MWB 79C
MWB 79D
FLOW-3
MWB 122
MWB 123
MWB 123A
MWB 123B
FLOW-4
MWB 123
MWB 123C
MWB 123D
FLOW-5
MWB 120
MWB 121A
MWB 121
MWB 121B
FLOW- 6
MW 57S
MWB 492
FLOW- 15
MW 57AL
MWB 8
MWB 7
MWB 15

prepared by: Checked by Approved by:


Name----------- Name--------------- Name--------------
Sig--------------- Sig----------- Sig---------
Date------------ Date-------- Date------
Project: Construction of New Secondary Sewer line for Selected Area of Kality Catchment (LOT 5)
Location: Adise Abeba, Bethel Area
Employer : AAWSA-Water and Sanitation Development &Reh
Consultant : SWS Consultancy
Contractor :

Section II: Trench Excavation, Backfill & Cart away


Averge
MH Ex Trench Excavation ,Back fill & cart
Manhole Ground Invert Ex Lengt Trench rock Excavation (m3)
Depth Depth away(m)
ID Elv Ele. Depth h (m)
(m) (m)
(m) a)Type A Trench a)Grade 1- Soft rock(m3) b)Grade 2- Hard rock(m3)

0-2 m 0-3 m 0-4 m 0-5 m


L(m) W(m) D(m) V(m )
3
L(m) W(m) D(m) V(m3)
depth depth depth depth

MWB 12
MWB 19
MWB 20
MWB 21
FLOW- 16
MWB 8
MWB 8A
FLOW- 17
MWB 249
MWB 248A
MWB 248
MWB 247
FLOW- 18
MWB 248A
MWB 491
MWB 9
MWB 10
FLOW- 19
MWB 491
MWB 6
FLOW- 25
MWB 531
MWB 531A
MWB 524
MWB 499
MWB 498
FLOW- 27
MWB 552
MWB 552A
MWB 552B
FLOW- 30
MWB 543
MWB 571
MWB 542
FLOW- 37
MW 57F26AA
MW 57F26
MW 57F27
MW 57F28

prepared by: Checked by Approved by:


Name----------- Name--------------- Name--------------
Sig--------------- Sig----------- Sig---------
Date------------ Date-------- Date------
Project: Construction of New Secondary Sewer line for Selected Area of Kality Catchment (LOT 5)
Location: Adise Abeba, Bethel Area
Employer : AAWSA-Water and Sanitation Development &Reh
Consultant : SWS Consultancy
Contractor :

Section II: Trench Excavation, Backfill & Cart away


Averge
MH Ex Trench Excavation ,Back fill & cart
Manhole Ground Invert Ex Lengt Trench rock Excavation (m3)
Depth Depth away(m)
ID Elv Ele. Depth h (m)
(m) (m)
(m) a)Type A Trench a)Grade 1- Soft rock(m3) b)Grade 2- Hard rock(m3)

0-2 m 0-3 m 0-4 m 0-5 m


L(m) W(m) D(m) V(m )
3
L(m) W(m) D(m) V(m3)
depth depth depth depth

MW 57F29
MW 57F30
FLOW- 47
MW 57F24Y
MW 57F24Z
FLOW- 48
MWB 497B
MWB 496
MWB 494
MWB 494A
MWB 494B
FLOW- 53
MWB 497A
MW 57F24E
FLOW- 54
MWB 507A
MWB 507
MWB 506
MWB 505
FLOW- 59
MW 57F26AA
MW 57F25
TOTAL

prepared by: Checked by Approved by:


Name----------- Name--------------- Name--------------
Sig--------------- Sig----------- Sig---------
Date------------ Date-------- Date------
TAKE OFF SHEET VI MANHOLES AND STRUCTURES
Project: Construction of New Secondary Sewer line for Selected Area of Kality Catchment (LOT 5)
Location: Adise Abeba, Bethel Area
Employer : AAWSA-Water and Sanitation Development &Rehabilitation Project Office
Consultant : SWS Consultancy
Contractor :

Section III: Gravity Sewers


Pipe bedding and Casting of uPVC Sewer Pipe
Manhole surrounding anchor blocks Supply & Installation
Length (m)
ID a) Type 2 b) Type 4
DN 200mm
bedding bedding a) Type A trench

Type A
Trench Type (A) trench

FLOW-1
MWB 80A
MWB 80
MWB 79A
MWB 79
MWB 124
MWB 122
MWB 120A
MWB 120
MWB 119
MWB 118
FLOW-2
MWB 79
MWB 79B
MWB 79C
MWB 79D
FLOW-3
MWB 122
MWB 123
MWB 123A
MWB 123B
FLOW-4
MWB 123
MWB 123C
MWB 123D
FLOW-5
MWB 120
MWB 121A
MWB 121
MWB 121B
FLOW- 6
MW 57S

Prepared by: Cheked by: Approved by:


Name------------------- Name------------- Name------------
Sig------------ Sig-------------- Sig------------
Date----------- Date------------ Date-----------
Project: Construction of New Secondary Sewer line for Selected Area of Kality Catchment (LOT 5)
Location: Adise Abeba, Bethel Area
Employer : AAWSA-Water and Sanitation Development &Rehabilitation Project Office
Consultant : SWS Consultancy
Contractor :

Section III: Gravity Sewers


Pipe bedding and Casting of uPVC Sewer Pipe
Manhole surrounding anchor blocks Supply & Installation
Length (m)
ID a) Type 2 b) Type 4
DN 200mm
bedding bedding a) Type A trench

Type A
Trench Type (A) trench
MWB 492
FLOW- 15
MW 57AL
MWB 8
MWB 7
MWB 15
MWB 12
MWB 19
MWB 20
MWB 21
FLOW- 16
MWB 8
MWB 8A
FLOW- 17
MWB 249
MWB 248A
MWB 248
MWB 247
FLOW- 18
MWB 248A
MWB 491
MWB 9
MWB 10
FLOW- 19
MWB 491
MWB 6
FLOW- 25
MWB 531
MWB 531A
MWB 524
MWB 499
MWB 498
FLOW- 27

Prepared by: Cheked by: Approved by:


Name------------------- Name------------- Name------------
Sig------------ Sig-------------- Sig------------
Date----------- Date------------ Date-----------
Project: Construction of New Secondary Sewer line for Selected Area of Kality Catchment (LOT 5)
Location: Adise Abeba, Bethel Area
Employer : AAWSA-Water and Sanitation Development &Rehabilitation Project Office
Consultant : SWS Consultancy
Contractor :

Section III: Gravity Sewers


Pipe bedding and Casting of uPVC Sewer Pipe
Manhole surrounding anchor blocks Supply & Installation
Length (m)
ID a) Type 2 b) Type 4
DN 200mm
bedding bedding a) Type A trench

Type A
Trench Type (A) trench
MWB 552
MWB 552A
MWB 552B
FLOW- 30
MWB 543
MWB 571
MWB 542
FLOW- 37
MW 57F26AA
MW 57F26
MW 57F27
MW 57F28
MW 57F29
MW 57F30
FLOW- 47
MW 57F24Y
MW 57F24Z
FLOW- 48
MWB 497B
MWB 496
MWB 494
MWB 494A
MWB 494B
FLOW- 53
MWB 497A
MW 57F24E
FLOW- 54
MWB 507A
MWB 507
MWB 506
MWB 505
FLOW- 59
MW 57F26AA

Prepared by: Cheked by: Approved by:


Name------------------- Name------------- Name------------
Sig------------ Sig-------------- Sig------------
Date----------- Date------------ Date-----------
Project: Construction of New Secondary Sewer line for Selected Area of Kality Catchment (LOT 5)
Location: Adise Abeba, Bethel Area
Employer : AAWSA-Water and Sanitation Development &Rehabilitation Project Office
Consultant : SWS Consultancy
Contractor :

Section III: Gravity Sewers


Pipe bedding and Casting of uPVC Sewer Pipe
Manhole surrounding anchor blocks Supply & Installation
Length (m)
ID a) Type 2 b) Type 4
DN 200mm
bedding bedding a) Type A trench

Type A
Trench Type (A) trench
MW 57F25

TOTAL

Prepared by: Cheked by: Approved by:


Name------------------- Name------------- Name------------
Sig------------ Sig-------------- Sig------------
Date----------- Date------------ Date-----------
Project: Construction of New Secondary Sewer line for Selected Area of Kality Catchment (LOT 5)
Location: Adise Abeba, Bethel Area
Employer : AAWSA-Water and Sanitation Development &Rehabilitation Project Office
Consultant : SWS Consultancy
Contractor :
AKE OFF SHEET VI: MANHOLES AND STRUCTURES
Manhole Ground Invert MH Excav AvG. Section IV:
ID Elv Ele. Depth Depth Ex Manholes and Structures
(m) Depth
Manholes: Supply &
(m) (m) Construct RC Precast Additional
Circular manhole as manhole depth
per the drawing detail

a) Type A-1000mm a) Type A- Depth


internal diameter greater than 1.5m
Depth 1.5m or less
FLOW-1
MWB 80A 2318.59 2316.78 1.81 2.010 1 0.41
MWB 80 2324.88 2322.98 1.9 2.100 1.955
MWB 79A 2330.44 2328.54 1.9 2.100 2.000 1 0.4
MWB 79 2332.44 2330.54 1.9 2.100 2.000 1 0.5
MWB 124 2335.55 2333.65 1.9 2.100 2.000
MWB 122 2338.17 2336.26 1.91 2.110 2.005
MWB 120A 2342.02 2340.11 1.91 2.110 2.010 1 0.41
MWB 120 2348.78 2346.88 1.9 2.100 2.005 1 0.4
MWB 119 2353.43 2351.53 1.9 2.100 2.000 1 0.4
MWB 118 2360.33 2358.52 1.81 2.010 1.955 1 0.6
FLOW-2
MWB 79 2332.44 2330.54 1.9 2.100 2
MWB 79B 2334.7 2332.8 1.9 2.000 2 1 0.4
MWB 79C 2336.79 2334.88 1.91 2.010 2.01 1 0.41
MWB 79D 2341.78 2339.98 1.8 1.900 1.9 1 0.52
FLOW-4
MWB 123 2340.56 2338.66 1.9 2.000 2
MWB 123C 2344.54 2342.64 1.9 2.000 2
MWB 123D 2348.37 2346.57 1.8 1.900 1.9 1 0.52
FLOW-5
MWB 120 2348.78 2346.88 1.9 2.000 2
MWB 121A 2352.42 2350.51 1.91 2.010 2.01 1 0.41
MWB 121 2356.62 2354.72 1.9 2.000 2
MWB 121B 2359.61 2357.71 1.9 2.000 2
FLOW- 6
MW 575 2325.63 2323.83 1.8 1.900

Prepared by: Cheked by: Approved by:

Name------------------- Name------------- Name------------


Sig------------ Sig-------------- Sig------------

Date----------- Date------------ Date----------


Project: Construction of New Secondary Sewer line for Selected Area of Kality Catchment (LOT 5)
Location: Adise Abeba, Bethel Area
Employer : AAWSA-Water and Sanitation Development &Rehabilitation Project Office
Consultant : SWS Consultancy
Contractor :
AKE OFF SHEET VI: MANHOLES AND STRUCTURES
Manhole Ground Invert MH Excav AvG. Section IV:
ID Elv Ele. Depth Depth Ex Manholes and Structures
(m) Depth
Manholes: Supply &
(m) (m) Construct RC Precast Additional
Circular manhole as manhole depth
per the drawing detail

a) Type A-1000mm a) Type A- Depth


internal diameter greater than 1.5m
Depth 1.5m or less
MWB 492 2324.32 2322.42 1.9 2.000 52 1 0.5
FLOW- 15
MW 57AL 2390.35 2387.85 2.5 2.600 2.6
MWB 8 2397.54 2395.04 2.5 2.600 2.6 1 1
MWB 7 2402.92 2400.66 2.26 2.360 2.36
MWB 15 2406.11 2403.61 2.5 2.600 2.6 1 1
MWB 12 2407.94 2405.44 2.5 2.600 2.6 1 1
MWB 19 2408.71 2406.21 2.5 2.600 2.6 1 1
MWB 20 2410.09 2407.59 2.5 2.600 2.6 1 1
MWB 21 2410.68 2408.18 2.5 2.600 2.6
FLOW- 16 0.100
MWB 8 2397.54 2395.04 2.5 2.600 2.6
MWB 8A 2399.54 2397.74 1.8 1.900 1.9 1 0.3
FLOW- 17 0.100
MWB 248A 2407.76 2405.16 2.6 2.700 2.7
MWB 248 2408.78 2406.88 1.9 2.000 2 1 0.4
MWB 247 2412.56 2410.76 1.8 1.900 1.9 1 0.5
FLOW- 18 0.100
MWB 248A 2407.76 2405.16 2.6 2.700 2.7
MWB 491 2407.58 2405.48 2.1 2.200 2.2 1 0.5
MWB 9 2411.1 2409.2 1.9 2.000 2 1 0.4
MWB 10 2413.15 2411.25 1.9 2.000 2
FLOW- 19
MWB 491 2407.58 2405.58 2 2.100 2.1
MWB 6 2407.67 2405.87 1.8 1.900 1.9 1 0.5
FLOW- 25
MWB 531 2364.36 2362.46 1.9 2.000 2

Prepared by: Cheked by: Approved by:

Name------------------- Name------------- Name------------


Sig------------ Sig-------------- Sig------------

Date----------- Date------------ Date----------


Project: Construction of New Secondary Sewer line for Selected Area of Kality Catchment (LOT 5)
Location: Adise Abeba, Bethel Area
Employer : AAWSA-Water and Sanitation Development &Rehabilitation Project Office
Consultant : SWS Consultancy
Contractor :
AKE OFF SHEET VI: MANHOLES AND STRUCTURES
Manhole Ground Invert MH Excav AvG. Section IV:
ID Elv Ele. Depth Depth Ex Manholes and Structures
(m) Depth
Manholes: Supply &
(m) (m) Construct RC Precast Additional
Circular manhole as manhole depth
per the drawing detail

a) Type A-1000mm a) Type A- Depth


internal diameter greater than 1.5m
Depth 1.5m or less
MWB 531A 2367.63 2365.72 1.91 2.010 2.01
MWB 524 2371.06 2369.15 1.91 2.010 2.01
MWB 499 2375.15 2373.25 1.9 2.000 2 1 0.5
MWB 498 2380.07 2378.17 1.9 2.000 2
FLOW- 27
MWB 552 2310.04 2308.11 1.93 2.030 2.03 1 0.43
MWB 552A 2314.86 2312.96 1.9 2.000 2 1 0.4
MWB 552B 2322.44 2320.64 1.8 1.900 1.9 1 0.5
FLOW- 37
MW 57F26AA 2403.85 2401.32 2.53 2.630 3 1 1.5
MW 57F26 2404.27 2401.77 2.5 2.600 2.6 1 1
MW 57F27 2406.04 2403.54 2.5 2.600 2.6 1 1
MW 57F28 2407.94 2405.44 2.5 2.600 2.6 1 1
MW 57F29 2409.85 2407.35 2.5 2.600 2.6 1 1
MW 57F30 2412.86 2410.36 2.5 2.600 2.6
MW 57F31 2415.09 2411.63 3.46 3.560 3.56
FLOW- 38 0
MW 57F31 2415.09 2411.63 3.46 3.560 3.56
MW 57F32 2414.22 2412.32 1.9 2.000 2 1 0.4
MW 57F34 2415.08 2413.18 1.9 2.000 2 1 0.4
MW 57F33 2415.95 2413.7 2.25 2.350 2.35 1 0.75
FLOW- 47
MW 57F24Y 2396 2394.1 1.9 2.000 2
MW 57F24Z 2402.96 2401.06 1.9 2.000 2
FLOW- 48
MWB 497B 2403.43 2401.53 1.9 2.000 2 1 0.7
MWB 496 2405.02 2403.12 1.9 2.000 2 1 0.4

Prepared by: Cheked by: Approved by:

Name------------------- Name------------- Name------------


Sig------------ Sig-------------- Sig------------

Date----------- Date------------ Date----------


Project: Construction of New Secondary Sewer line for Selected Area of Kality Catchment (LOT 5)
Location: Adise Abeba, Bethel Area
Employer : AAWSA-Water and Sanitation Development &Rehabilitation Project Office
Consultant : SWS Consultancy
Contractor :
AKE OFF SHEET VI: MANHOLES AND STRUCTURES
Manhole Ground Invert MH Excav AvG. Section IV:
ID Elv Ele. Depth Depth Ex Manholes and Structures
(m) Depth
Manholes: Supply &
(m) (m) Construct RC Precast Additional
Circular manhole as manhole depth
per the drawing detail

a) Type A-1000mm a) Type A- Depth


internal diameter greater than 1.5m
Depth 1.5m or less
MWB 495 2406.57 2404.66 1.91 2.010 2.01 1 0.41
MWB 494 2408.78 2406.88 1.9 2.000 2 1 0.5
MWB 494A 2409.48 2407.57 1.91 2.010 2.01 1 0.41
MWB 494B 2410.43 2408.53 1.9 2.000 2 1 0.6
FLOW- 53
MWB 497A 2402.06 2400.25 1.81 1.910 1.91
MW 57F24E 2403.13 2401.32 1.81 1.910 1.91
FLOW- 54
MWB 507 2383.37 2381.47 1.9 2 50 1 0.6
MWB 505 2388.87 2386.97 1.9 2 41 1 0.4
MWB 504 2390.97 2389.06 1.91 2.01 43.5 1 0.41
FLOW- 55
MWB 502A 2386.96 2385.06 1.9 2 73 1 0.7
FLOW- 56
MWB 506A 2388.29 2386.39 1.9 2 58 1 0.5
FLOW- 59
MW 57F25 2405.72 2403.82 2.2 2.3 21.5 1 0.7

TOTAL 48 28.69

Prepared by: Cheked by: Approved by:

Name------------------- Name------------- Name------------


Sig------------ Sig-------------- Sig------------

Date----------- Date------------ Date----------


Prepared by: Cheked by: Approved by:

Name------------------- Name------------- Name------------


Sig------------ Sig-------------- Sig------------

Date----------- Date------------ Date----------


Averge
Ex Depth Ex
MH
Manhole Invert Depth Length
Ground.Elv Depth
ID Ele. (m)
(m)
(m)
(m)
Section V: accsess road

Construction of 7m width all


weather access road; the
surface shall be scarified to a
minimum depth of 150mm
and brought to optimum
moisture content, shaped to
line and grade, and RC standard
Construction of TB1:
compacted to 95% of 1x2m box
One sided road drainage
Modified Proctor Density . culvert
ditch of bottom width
A minimum 200mm including the
0.7m, average depth of
thickness of gravel road base downside
1m including the free
and a minimum of 200mm erosion
board with side slope
sub base of approved protection or
1:1 as shown in drawing
material; shall be spread on energy
detail
the prepared surface and dissipater.
compacted at optimum
moisture content to 95 % of
Modified Proctor Density as
per the technical
specification and engineers
instruction.
Project: Construction of New Secondary Sewer line for Selected Area of Kality Catchment (LOT 5)
Location: Adise Abeba, Bethel Area
Employer : AAWSA-Water and Sanitation Development &Rehabilitation Project Office
Consultant : SWS Consultancy
Contractor :

TAKE OFF SHEET VI FINISHING WORK

Section VI: Finishing works


Manhole PERMANENT RESTORATION WORK
Length (m)
ID
c ) Gravel Road d) Coble and/or CARE stone
L(m) W(m) A(m2) L(m) W(m) A(m2)
FLOW-1
MWB 80A
MWB 80 58 52.00 0.7 36.4
MWB 79A 70 64.00 0.7 44.8
MWB 79 36 30.00 0.7 21
MWB 124 50 44.00 0.7 30.8
MWB 122 45.5 39.50 0.7 27.65
MWB 120A 67 61.00 0.7 42.7
MWB 120 77.5 71.50 0.7 50.05
MWB 119 38 32.00 0.7 22.4
MWB 118 50 44.00 0.7 30.8
FLOW-3
MWB 122
MWB 123 43.5
MWB 123A 60 60 0.7 42
MWB 123B 45.50 45.5 0.7 31.85
FLOW-4
MWB 123
MWB 123C 61.5 61.5 0.7 43.05
MWB 123D 57 57 0.7 39.9
FLOW-5
MWB 120
MWB 121A 57.5 57.5 0.7 40.25
MWB 121 54
MWB 121B 38.5
FLOW- 6
MW 57S
MWB 492 52.00 52.00 0.7 36.4
FLOW- 16
MWB 8
MWB 8A 105.0 105.5 0.7 73.85
FLOW- 17
MWB 249
MWB 248A
MWB 248 14.00 14.00 0.7 9.8
MWB 247 71.50 71.50 0.7 50.05
FLOW- 27
MWB 552
MWB 552A 55.5 55.5 0.7 58.275
MWB 552B 52.5 52.5 0.7 55.125
FLOW- 47
MW 57F24Y
MW 57F24Z 91.5 91.5 0.7 64.05

Prepared by Checked by: Approved by:

Name----------- Name------------- Name--------------

Sig-------------- Sig--------------- Sig----------


Date-------------- Date-------
Date------------
Project: Construction of New Secondary Sewer line for Selected Area of Kality Catchment (LOT 5)
Location: Adise Abeba, Bethel Area
Employer : AAWSA-Water and Sanitation Development &Rehabilitation Project Office
Consultant : SWS Consultancy
Contractor :

TAKE OFF SHEET VI FINISHING WORK

Section VI: Finishing works


Manhole PERMANENT RESTORATION WORK
Length (m)
ID
c ) Gravel Road d) Coble and/or CARE stone
L(m) W(m) A(m2) L(m) W(m) A(m2)
FLOW- 48
MWB 497B 63 63 0.7 63
MWB 496 31.5 31.5 0.7 22.05
MWB 494 47 47 0.7 32.9
MWB 494A 30 30 0.7 21
MWB 494B 37.00 30 0.7 21
FLOW- 53
MWB 497A
MW 57F24E 57 30 0.7 21
TOTAL 835.1 197.05

Prepared by Checked by: Approved by:

Name----------- Name------------- Name--------------

Sig-------------- Sig--------------- Sig----------


Date-------------- Date-------
Date------------
Summary of Statement
Project: Construction of New Secondary Sewer line for Selected Area of Kality Catchment (LOT 5) Project Total Cost : 20,198,425.20
Location: Adise Abeba, Bethel Area Project completion period: 1 year
Employer : AAWSA-Water and Sanitation Development &Rehabilitation Project Office Contract year :2015
Consultant : SWS Consultancy
Contractor :
Executed

Quantity Amount
Item Contract Unit Contract
No. Description Unit Qty Rate Amt Previous Current Todate Previous Current
Section I: Preparation of Ground
101 Precutting Paved Surfaces
a) Concrete Asphalt m2
b) Ordinary Asphalt m2 80 0 0.000
c ) Gravel Road m2 30 0 0.000 0.000 0.00
d) Coble and/or CARE stone m2 40 0 0.000 0.000 0.00
e)Tiles m2 50 0 0.000
f) Reinforced Concrete m2 0.000
102 Cutting and Removal of existing walls and fences
0.000
a) Masonry m3 1,000 0 0.000 0.000 0.00
b) Reinforced Concrete m3 1,500 0 0.000 0.000 0.00
c) Corrugated iron sheet m2 1,500 0 0.000
103 Construction of Working Platforms 0.000
a) Removal of trees or girth of any size; the price
shall include transportation to selected site by
engineer of any distance. no. 350 0 0.000

Prepared by Checked By Approved by

Name----------- Name--------------- Name------------------


Sig-------------- Sig--------------- Sig--------------------

Date------------ Date------------- Date------------------


Summary of Statement
Project: Construction of New Secondary Sewer line for Selected Area of Kality Catchment (LOT 5) Project Total Cost : 20,198,425.20
Location: Adise Abeba, Bethel Area Project completion period: 1 year
Employer : AAWSA-Water and Sanitation Development &Rehabilitation Project Office Contract year :2015
Consultant : SWS Consultancy
Contractor :
Executed

Quantity Amount
Item Contract Unit Contract
No. Description Unit Qty Rate Amt Previous Current Todate Previous Current
b) Common excavation for working platforms m3 70 0 0.000 0.00
c) Extra over for soft rock excavation for working
platforms m3 30 0 0.000
d) Extra over for hard rock: Without blasting for
working platforms m3 70 0 0.000
g) Cart away of any distance from site m3 30 0 0.000 0.00
sub total 0 0.00
Section II: Trench Excavation, Backfill & Cart
away
201 Trench Excavation, Backfill & Cart away
a) Type A trench
0-2 m depth m 180 0 0.000 0.000 0.00
0-3 m depth m 280 0 0.000 0.000 0.00
0-4 m depth m 400 0 0.000 0.000
0-5 m depth m 180 0 0.000
202 Trench rock excavation 0.000
a) Grade 1- Soft rock m3 150 0 0.000 0.000 207865.95

Prepared by Checked By Approved by

Name----------- Name--------------- Name------------------


Sig-------------- Sig--------------- Sig--------------------

Date------------ Date------------- Date------------------


Summary of Statement
Project: Construction of New Secondary Sewer line for Selected Area of Kality Catchment (LOT 5) Project Total Cost : 20,198,425.20
Location: Adise Abeba, Bethel Area Project completion period: 1 year
Employer : AAWSA-Water and Sanitation Development &Rehabilitation Project Office Contract year :2015
Consultant : SWS Consultancy
Contractor :
Executed

Quantity Amount
Item Contract Unit Contract
No. Description Unit Qty Rate Amt Previous Current Todate Previous Current
b) Grade 2-Hard rock 0.000
i) Without blasting m3 230 0 0.000 0.000 527510.98
sub total 0 735376.93
Section III: Gravity Sewers 0.000
301 Pipe bedding and surrounding 0.000
a) Type 2 bedding 0.000
- Type A Trench m 150 0 0.000 0.000 0.00
b) Type 4 bedding 0.000
- Type A Trench m 200 0 0.000
302 Casting of anchor blocks 0.000
a) Type A trench pcs 2000 0 0.000 0.000 0.00
303 uPVC Sewer Pipe Supply & Installation 0.000
DN 200mm m 150 0 0.000 0.000 0.00
305 Connection to the main trunk line Manhole pcs 2,500 0 0.000
sub total 0 0.00
Section IV: Manholes and Structures 0.000
Prepared by Checked By Approved by

Name----------- Name--------------- Name------------------


Sig-------------- Sig--------------- Sig--------------------

Date------------ Date------------- Date------------------


Summary of Statement
Project: Construction of New Secondary Sewer line for Selected Area of Kality Catchment (LOT 5) Project Total Cost : 20,198,425.20
Location: Adise Abeba, Bethel Area Project completion period: 1 year
Employer : AAWSA-Water and Sanitation Development &Rehabilitation Project Office Contract year :2015
Consultant : SWS Consultancy
Contractor :
Executed

Quantity Amount
Item Contract Unit Contract
No. Description Unit Qty Rate Amt Previous Current Todate Previous Current
Manholes: Supply & Construct RC Precast Circular
401
manhole as per the drawing detail 0.000
a) Type A-1000mm internal diameter Depth 1.5m or
less 4,000 0 48.000 48.000 192000.00
i) with Cast Iron Cover and Frame
pcs 0.000
ii) with RC Cover pcs 0.000
402 Additional manhole depth 0.000
a) Type A- Depth greater than 1.5m
m 1,500 0 28.690 28.690 43035.00
403 Retaining Wall and/or check dams 0.000
a) Masonry m3 0.000
b) Reinforced Concrete m3 0.000
404 Culvert inlet and outlets 0.000
a) Masonry m3 0.000
b) Reinforced Concrete m3 0.000
405 Ditch linings 0.000
a) Type TB1 Masonry m2 0.000
b) Type TB2 Masonry m2 50 0 0.000
Prepared by Checked By Approved by

Name----------- Name--------------- Name------------------


Sig-------------- Sig--------------- Sig--------------------

Date------------ Date------------- Date------------------


Summary of Statement
Project: Construction of New Secondary Sewer line for Selected Area of Kality Catchment (LOT 5) Project Total Cost : 20,198,425.20
Location: Adise Abeba, Bethel Area Project completion period: 1 year
Employer : AAWSA-Water and Sanitation Development &Rehabilitation Project Office Contract year :2015
Consultant : SWS Consultancy
Contractor :
Executed

Quantity Amount
Item Contract Unit Contract
No. Description Unit Qty Rate Amt Previous Current Todate Previous Current
sub total 0 235035.00
Section VI: Finishing works 0.000
601 Permanent restoration of trench surfaces 0.000
a) Concrete Asphalt m2 0.000
b) Ordinary Asphalt m2 450 0 0.000
c ) Gravel Road m2 100 0 835.100 835.100 83510.00
d) Coble and/or CARE stone m2 200 0 197.050 197.050 39410.00
e)Tiles m2 250 0 0.000
f) Reinforced Concrete m2 0.000
602 Replacement of walls and fences 0.000
a) Masonry m3 1,250 0 0.000
b) Reinforced Concrete m3 3,500 0 0.000
c) Corrugated iron sheet m2 280 0 0.000
sub total 0 122920.00

TOTAL 1093331.93

Prepared by Checked By Approved by

Name----------- Name--------------- Name------------------


Sig-------------- Sig--------------- Sig--------------------

Date------------ Date------------- Date------------------


5.20

Amount

Todate

-
-
-
-
-

-
-
-
-
-

Prepared by Checked By Approved by

Name----------- Name--------------- Name------------------


Sig-------------- Sig--------------- Sig--------------------

Date------------ Date------------- Date------------------


5.20

Amount

Todate
-

-
-
0.00

-
-
-
-
-
207,865.95

Prepared by Checked By Approved by

Name----------- Name--------------- Name------------------


Sig-------------- Sig--------------- Sig--------------------

Date------------ Date------------- Date------------------


5.20

Amount

Todate
-
527,510.98
735376.93
-
-
-
-
-
-
-
-
-
-
-
0.00
-
Prepared by Checked By Approved by

Name----------- Name--------------- Name------------------


Sig-------------- Sig--------------- Sig--------------------

Date------------ Date------------- Date------------------


5.20

Amount

Todate

192,000.00
-
-
-
43,035.00
-
-
-
-
-
-
-
-
-
Prepared by Checked By Approved by

Name----------- Name--------------- Name------------------


Sig-------------- Sig--------------- Sig--------------------

Date------------ Date------------- Date------------------


5.20

Amount

Todate
235035.00
-
-
-
-
83,510.00
39,410.00
-
-
-
-
-
-
122920.00

1093331.93

Prepared by Checked By Approved by

Name----------- Name--------------- Name------------------


Sig-------------- Sig--------------- Sig--------------------

Date------------ Date------------- Date------------------


GRAND SUMMARY
Project: Kality Catchment Secondary Sewer Line Construction (Lot V) Project Total Cost : 20,198,425.20
Location: Bethel Area Project completion period: 1 year
Clienet: A.A.W.S.A.-Water and Sanitation Development and Rehabilitation Project Office Contract year :2015
Consultant: SWS Consultancy
Contractor:

AMOUNT (ETB)
EXCUTED
SECTION DESCRIPTION CONTRACT PREVIOUS CURRENT TO DATE
I Preparation of Ground
II Trench Excavation, Backfill and Cart away
III Gravity Sewers
IV Manholes and Structures
V Access Road
VI Finishing Works
TOTAL
VAT 15%
TOTAL INCL. VAT
RETANTION 5%
ADVANCE REPAYMENT 20%
NET TOTAL