ENVIRONMENT & WATER ENGINEERING: Singapore’s overall waste generation and recycling rates increased in 2021
STANDARDS DEVELOPMENT: Upcoming Launch of Railway Safety Management and Safety Performance Standards
CIVIL & STRUCTURAL ENGINEERING: Design economics of infield bridges for offshore wind farms
CHARTERED ENGINEER
(SINGAPORE)
COVER STORY
10 Tuas Power-ST Engineering Consortium and PUB open
Singapore’s fifth desalination plant
With its ability to produce up to 137,000 m3 of potable water,
the plant will strengthen Singapore’s water security.
President Publications Manager Editorial Panel Design & layout by 2EZ Asia Pte Ltd
Dr Richard Kwok Desmond Teo Dr Chandra Segaran
Cover designed by Irin Kuah
desmond@iesnet.org.sg Prof Er Meng Joo
Chief Editor Dr Ang Keng Been Cover image by
T Bhaskaran Snr Publications Executive Mr Gary Chiam PUB, Singapore’s National Water Agency
t_b_n8@yahoo.com Queek Jiayu Dr Victor Sim
Published by
jiayu@iesnet.org.sg Mr Syafiq Shahul The Institution of Engineers, Singapore
Dr Alexander Wiegand 70 Bukit Tinggi Road, Singapore 289758
Media Representative Tel: 6469 5000 I Fax: 6467 1108
Multimedia Communications Printed in Singapore
(2000) Pte Ltd
sales@multimediacomms.sg
STANDARDS DEVELOPMENT
20 Upcoming Launch of Railway Safety Management and Safety
Performance Standards
More information is provided on two new Technical References.
DIGITALISATION
22 Implementing a ‘team concept’ in construction projects
A leading German construction company is reaping the benefits.
PROJECT APPLICATION
31 Restoration work on the Enel head offices in Italy
The intervention involved concrete repair and the application of
new coatings for the renovation of the façades.
31
34 Complex civil engineering for hydroelectric power plant project
The project will generate electricity that will be supplied to
200,000 households in Töging am Inn, Germany.
36 World first for Liebherr luffing jib cranes
Two new cranes from the company are working on the
construction of the Central Boulevard Towers in Singapore.
REGULAR SECTIONS
04 INDUSTRY NEWS
08 EVENTS
37 PRODUCTS & SOLUTIONS
40 IES UPDATE
36
The Singapore Engineer is published monthly by The Institution of Engineers, Singapore (IES). The publication is distributed free-of-charge
to IES members and affiliates. Views expressed in this publication do not necessarily reflect those of the Editor or IES. All rights reserved.
No part of this magazine shall be reproduced, mechanically or electronically, without the prior consent of IES. Whilst every care is taken
to ensure accuracy of the content at press time, IES will not be liable for any discrepancies. Unsolicited contributions are welcome but
their inclusion in the magazine is at the discretion of the Editor.
At the Environment & Water Leaders Forum are, from left to right, Ambassador Ong Keng Yong, Executive Deputy Chairman, S Rajaratnam School of
International Studies; Dr Andrew Benedek, Chairman and CEO, Anaergia; Ms Michèle Blom, Vice Minister for Water Management, Ministry of Infrastructure
and Water Management, Netherlands; Mr Patrick Blethon, CEO, Saur Group; Ms Dechen Tsering, Regional Director, Asia and the Pacific Office, United
Nations Environment Programme; and Dr Axel Schweitzer, Chief Executive Officer, ALBA Group plc & Co KG. Image: SIWW and CESG 2022.
The consortium of Tuas Power and Building a full-fledged desalination Singapore’s water security”, said Mr
ST Engineering, along with PUB, plant on existing infrastructure Ng Joo Hee, Chief Executive of PUB.
Singapore’s National Water Agency, called for innovative engineering
“Leveraging on TMUC’s existing
have officially opened Singapore’s solutions, from creating modular
infrastructure for seawater intake,
fifth desalination plant, located on systems in different areas of the
the synergies between JIDP and
Jurong Island. desalination process to the pre-fab-
TMUC have enabled operations to
rication of equipment such as the
Jurong Island Desalination Plant save approximately 5,000 Megawatt
reverse osmosis units. The plant is
(JIDP) has a daily capacity of up to hours per year. That is almost 1,000
also highly automated – a three-
137,000 m3 (about 30 million gal- HDB households’ energy consump-
man team can run the entire plant’s
lons) of water – the equivalent of tion annually, making JIDP one of
operations from its control room. In
55 Olympic-sized swimming pools. the more energy-efficient desalina-
addition, JIDP incorporates the latest
tion plants in Singapore”, shared Mr
Deputy Prime Minister and Co- proven water treatment equipment
Jiang Hanbin, President and Chief
ordinating Minister for Economic and membrane technologies, such
Executive Officer of Tuas Power.
Policies, Mr Heng Swee Keat was the as dissolved air flotation, ultra-filtra-
Guest of Honour at the ceremony, tion, and reverse osmosis. “The design and construction of the
held at the start of the Singapore JIDP has provided ST Engineering
“Although seawater desalination is the opportunity to leverage our
International Water Week 2022. the most expensive way to produce
Also present were Minister for expertise in large-scale engineer-
water, due to the energy required, ing projects in the marine sector
Sustainability and the Environment, it is nevertheless an essential
Ms Grace Fu; PUB Chief Executive, to deliver complex environmental
source of drinking water for Singa- engineering solutions. The result is
Mr Ng Joo Hee; Tuas Power Presi- pore. Desalination is immune to the
dent & CEO, Mr Jiang Hanbin; and ST an energy-efficient, technologically
vagaries of weather and is always advanced, less labour-intensive and
Engineering’s President for Marine, available, rain or not. The efficien-
Mr Ng Sing Chan. weather-resilient water source that
cies that come from constructing meets Singapore’s water needs”,
Constructed under the Design, JIDP, our fifth and newest desalina- said Mr Ng Sing Chan, President,
Build, Own and Operate (DBOO) tion plant, next to Tuas Power’s ex- Marine, ST Engineering.
model, JIDP will be operated by isting TMUC, make the energy-take
TP-STM Water Resources Pte Ltd – for desalination that much more Desalinated water is one of Sin-
the Joint Venture company formed palatable. JIDP further diversifies gapore’s Four National Taps, and
by the Tuas Power-ST Engineering our water production portfolio and a weather-resilient source that
consortium – for a 25-year period. its coming into operation enhances contributes to the nation’s long-
Spanning over 3.7 hectares, which
is about the size of five football
fields, JIDP receives seawater from
Tuas Power’s Tembusu Multi-Utili-
ties Complex (TMUC), for process-
ing into potable water.
JIDP’s co-location with TMUC
allows it to derive synergies in
resources, such as sharing of sea-
water intake and outfall structures,
as well as energy from in-plant
generation facilities. Due to the
co-location, the plant is about 5%
more energy-efficient compared to
conventional desalination plants,
which translates to annual energy
savings sufficient to power nearly
Aerial night-view of the Jurong Island Desalination Plant. Image: PUB, Singapore’s National
1,000 HDB households.
Water Agency.
term water supply sustainability. leads and coordinates whole-of-gov- Tuas Power also supplies utilities
The other four desalination plants in ernment efforts to protect Singapore such as steam, high-grade industrial
Singapore are the Singspring (2005), from the threat of rising seas and the water and demineralised water, and
Tuas South (2013), Tuas (2018) and holistic management of inland and provides waste water treatment
Marina East (2020) plants. coastal flood risks. services, in Tembusu, Jurong Island.
The National Environment Agency’s ties in 2021 led to a 10% increase • The recycling rate of horticultural
(NEA) latest waste and recycling in waste disposal and 26% more and wood waste increased from
statistics revealed that in 2021, waste recycled. 80% and 64% in 2020 to 83% and
about 6.94 million tonnes of solid 76%, respectively, in 2021. Waste
• Compared to the period before
waste were generated, which was generators sent more of such
COVID-19 pandemic, 2021 saw
about 18% more than the 5.88 waste to biomass and composting
5% less waste generated, and 5%
million tonnes generated in 2020. facilities for recycling instead of
Waste generation is the sum of more waste disposed of as waste
sending them to Waste-to-Energy
total waste disposed of and total recycled declined by 11%.
plants.
waste recycled. • Due to lower construction activity
• The recycling rate of paper/card-
Waste generated by the non-do- and export market demands for
board edged up marginally from
mestic and domestic sectors both recyclables in 2021, the amount of
38% in 2020 to 39% in 2021. It
saw increases – from 4.12 million waste recycled is lower than the
remains below 2019’s 44% as
tonnes and 1.77 million tonnes, re- pre-COVID-19 levels, especially for
less paper/cardboard recyclables
spectively, in 2020, to 5.12 million waste streams such as construc-
were exported than in 2019 while
tonnes and 1.82 million tonnes, tion and demolition, wood and
there was an increase in the dis-
respectively, in 2021. Non-domestic non-ferrous metal. The overall
posal of paper/cardboard waste.
waste is waste collected from in- recycling rate improved from 52%
dustries and commercial premises. in 2020 to 55% in 2021. The recy-
cling rates of most waste streams, Increase in household recycling
Domestic waste is waste collected
from households and trade prem- including those for plastic and • More waste was being disposed
ises (e.g. shophouses, educational food waste, were higher than in of by the domestic sector as the
institutions, petrol stations, hawker 2019. However, the recycling rate work-from-home trend continued
centres and places of worship). of paper/cardboard, which is also into 2021. This was matched by
a major waste stream, was lower a corresponding increase in the
Of the waste generated in 2021, than the 2019 level. amount of recyclables collected
3.83 million tonnes were recycled. under the National Recycling Pro-
Overall, the recycling rate increased • With waste generation growing
gramme (NRP), by 14%, contrib-
from 52% in 2020 to 55% in 2021. as economic activities ramp up,
uting to 40% of the increase in
The recycling rate is derived from there will be greater urgency to
the amount of waste recycled by
the amount of waste recycled di- shift from a linear to a circular
the domestic sector. Overall, the
vided by the total amount of waste economy which is a key part of
domestic recycling rate remained
recycled and waste disposed of. the Zero Waste Masterplan and
unchanged at 13% in 2021.
the Singapore Green Plan. It will
The recycling rate of the non-do- take a whole-of-nation effort • Through outreach programmes,
mestic sector increased from 68% to achieve the vision of a Zero such as the Recycle Right
in 2020 to 70% in 2021, while that Waste Nation. NEA will continue campaign, NEA will continue to
of the domestic sector remained to encourage businesses and con- encourage households to recycle
unchanged at 13% in 2021. sumers to be more sustainable. more and recycle right. To cul-
tivate good recycling practices,
Key highlights and observations Improvements in plastics, educational and user-friendly
Economic activity picked up in horticultural and wood waste content has been developed to
2021, resulting in more waste gen- recycling rates guide the public on items that
erated and recycled in 2021. can and cannot be recycled.
• The recycling rate of plastics
• 2020 was an anomalous year waste increased from 4% in
with lower waste generation and 2020 to 6% in 2021. There was Encouraging sustainability
recycling rates, due to the impact a 60% increase in the amount practices in businesses and
of COVID-19, particularly during of plastics waste recycled, with consumers
the Circuit Breaker period (April more processed locally and • While the recycling rates of most
to May 2020) when activities exported. More needs to be done waste streams in 2021 were high-
were curtailed. The pick-up in to improve the recycling rate of er than the pre-COVID-19 levels
economic activity, and resump- plastics waste as it remains low of 2019, there remains room for
tion of business and social activi- despite the increase. improvement as Singapore works
towards realising the vision of the reduction of packaging, which will be greater urgency to shift from
being a Zero Waste Nation. includes the use of paper/card- a linear to a circular economy. The
board in e-commerce. national goals are to achieve a 70%
• Apart from implementing a
overall recycling rate by 2030 and
disposable carrier bag charge at • NEA engages the premise oper-
supermarkets, from mid-2023, to reduce the amount of waste
ators of various types regularly
NEA is also working to introduce sent to Semakau Landfill by 20%
to encourage the adoption of
a Beverage Container Return per capita per day by 2026 and 30%
circular economy practices. NEA
Scheme to support plastics per capita per day by 2030. This
has published 3R guidebooks,
recycling and cultivate recycling will help to extend the lifespan of
which can be downloaded from
habits among consumers. the remaining landfill which will
NEA’s website. These include
be filled up by 2035, at the current
• To encourage sustainable packag- guidebooks for food waste
rates of waste disposal.
ing waste management practices minimisation and segregation for
and support companies in ful- recycling, and sustainable packag- It will take a whole-of-nation effort
filling the Mandatory Packaging ing practices. to achieve Singapore’s vision of a
Reporting (MPR) requirement, Zero Waste Nation. Towards achiev-
• Through the Say YES to Waste Less
NEA is partnering the Singapore ing this objective, NEA will continue
and Recycle Right campaigns, NEA
Manufacturing Federation in the to initiate various campaigns and
encourages the public to make en-
Packaging Partnership Pro- engagements as well as encourage
vironment-friendly choices in their
gramme (PPP) to build capability. greater waste reduction efforts.
daily lives and encourage families
Through webinars and resources, This is a long-term process that re-
and friends to do the same.
the PPP facilitates the exchange quires everyone – from the people,
of sustainable packaging best With waste generation growing as private and public sector – to work
practices and trends, to support economic activities ramp up, there together.
Glass 74 9 13% 65
Others (stones,
233 18 8% 214
ceramics, etc.)
An Autonomous Environmental
Service Vehicle has been jointly
developed by Nanyang Techno-
logical University, Singapore (NTU
Singapore); Enway Pte Ltd; Semb-
Waste Pte Ltd; and Wong Fong En-
gineering Pte Ltd. Their efforts are
supported by the National Environ-
ment Agency (NEA) and National
Robotics Programme (NRP).
Principal Investigator, Professor
Wang Danwei, from the School of
Electrical and Electronic Engineer-
ing, NTU, leads the AESV project
which includes the development
of novel technologies for off-site
operations and robot cybersecurity The AESV developed by the NTU-Enway-Sembcorp-Wong Fong Consortium.
solutions for the project.
Enway is a developer of auton- station and waste compactor for • Tested on the NTU Smart Cam-
omous software for heavy duty autonomous dumping. pus: A living testbed for innova-
vehicles, focusing initially on the tive digital and tech-enabled solu-
cleaning industry, with its Blitz class Features of the AESV tions, the NTU Smart Campus is
autonomous industrial sweeper home to the Centre of Excellence
The AESV incorporates the follow-
launched in September 2019. The ing features, to make street sweep- for Testing & Research of Auton-
company combines knowhow in ing sustainable and efficient: omous Vehicles – NTU (CETRAN),
engineering, robotics, machine where public road trials for the
learning, computer vision and • Zero carbon emission, less noise: AESV are conducted in small-
artificial intelligence, with opera- The AESV is fully electric and has scale testbed environments.
tional expertise that is unique in lower ambient noise output com-
the professional cleaning industry. pared to conventional sweepers.
As Co-Principal Investigator, Enway
Specifications of the AESV
• Improves productivity: (i) Op-
is developing the AESV’s naviga- erations can be shifted to late • 8 hours sweeping range and 2.5
tion system and autonomous road nights/early mornings, avoiding hour charge time.
sweeping functionality. rush hours and optimising road • Equipped with 3D LiDAR sensors
SembWaste is the waste manage- usage and (ii) The system allows and cameras for localisation, kerb
ment and recycling arm of Semb- for dynamic route planning and following and traffic navigation.
corp Industries, a focused energy remote operation to ensure the • Sweeping speed of up to 12 km/hr.
and urban development company AESV can handle all situations it
encounters. • Vacuum-based debris collection
offering sustainable solutions. A system.
leading environmental services • Enable job re-design: Deployment
company, SembWaste provides of the AESV will enable job • Autonomous docking and hopper
waste management, public cleaning re-design, to address manpower emptying.
and recycling services, and is the shortage in the cleaning industry • Remote monitoring and control.
operational partner for the public and attract young talents to join. A high-fidelity teleoperation sys-
trials of the AESV. • Precise cleaning: The ability to tem has been developed by NTU,
Wong Fong is a trusted provider autonomously sweep along the that enables drivers to operate
of land transportation engineering kerb facilitates effective cleaning the AESV and other heavy-du-
solutions and systems. For this of heavy debris areas. ty vehicles remotely (from an
project, the company developed • Safety: The AESV is cybersecure, to off-site location) in a simple and
and manufactured the AESV’s field guard against malicious attacks on realistic manner.
infrastructure including the docking its sensors and actuation systems. • Cybersecurity functions.
Veolia Water Technologies, a Compact and suitable for outdoor can be monitored automatically
subsidiary of Veolia Group, and a installation, the Barrel offers a and accessed remotely – helping
leading specialist in water treat- footprint reduction of up to 25% operators to make better decisions
ment, recently announced the Asia and does not require a controlled on whether to shut down, rotate,
Pacific launch of ‘The Barrel’ which environment. The sustainable solu- or replace membranes.
incorporates integrated plug-and- tion also provides a reduction in
play reverse osmosis (RO) tech- electrical consumption in the range Veolia Water Technologies
nology. The Barrel was showcased of 0.05 kWh/m3 of fresh water
at CleanEnviro Summit Singapore produced. Veolia Water Technologies provides
2022 and the OzWater 2022 trade a complete range of services re-
Beyond sustainability, the design of quired to design, deliver, maintain,
exhibition in Brisbane, Australia.
the Barrel also significantly reduces and upgrade water and wastewater
With increasing demand for fresh the number of high-pressure piping treatment facilities and systems,
water and rising concerns over its connections down to just two - the for industrial clients and public
scarcity in the region, the Barrel is seawater inlet and the brine outlet. authorities.
expected to meet the challenges This design feature makes it safer
and expectations of the desalina- for operators and minimises risks The company’s extensive portfolio
tion market while producing fresh on-site during the maintenance and of technologies features everything
water complying with all water operation phases. Corrosion is less from online diagnostic solutions to
quality standards. It is also suitable likely to occur as seawater leakage evaporation and crystallisation, en-
for wastewater reuse and low pres- sources, such as those found on the ergy-producing sludge treatment,
sure RO applications. The Barrel is multiple high-pressure connections desalination, laboratory-grade
expected to empower users with an of traditional RO skids, are reduced. water, and mobile water services.
economically viable and sustainable By optimising both processes and
The Barrel also has a built-in digital- monitoring, Veolia Water Tech-
source of fresh water.
isation system with smart con- nologies helps clients reduce their
It was selected as a key technology nectors providing real-time status water footprint, while generating
for the first experiment in Europe, updates on each membrane’s con- savings in energy and chemical
which involves wastewater treat- dition. In fact, their performance consumption.
ment for the supply of drinking
water, through the Jourdain pro-
gramme, in France’s Vendee region.
The technology has also been in
use at the Oman Sur desalination
plant since 2019.
The Barrel
The Barrel is a multi RO element
vessel that is designed to be a plug-
and-play system. The carbon steel
pressure vessel is manufactured
and tested off-site, and is delivered
as a single unit, so installation on-
site can be fast-tracked and project
schedules shortened.
In addition, the modular design of
the Barrel makes it scalable, offering
varying capacities from 400 m3/day
to 50,000 m3/day per unit. It can
also be used in place of existing RO
membranes and nanofiltration skids,
as a more economically viable, sus-
tainable, and innovative alternative. The Barrel is suitable for outdoor installation.
CPG Consultants (CPG), a subsid- the four-year construction phase, tion, like Singapore, that is particu-
iary of Singapore-based consul- CPG employed skilled expertise to larly susceptible to rising sea levels
tancy services, infrastructure, and ensure that these two measures and extreme weather conditions.
building management firm, CPG safeguard the Orchard Road area
Further, holistic coastal protection
Corporation, has announced that by detaining, delaying and divert-
and sustainability strategies are
it is forming a core team to devise ing storm runoff before it can do
essential in strengthening Singa-
holistic coastal protection and serious harm.
pore’s built environment resilience.
sustainability strategies for the
The SDT temporarily stores storm Last year, PUB announced the
built environment. As a strategic
water from Holland Road’s drains commencement of a site-specific
addition to CPG’s multidisciplinary
and pumps the water into drains study along Singapore’s Southeast
consultancy services, the Coastal
leading to SDC. This integrated Coast - a significant step forward
Protection Strategy Team (Civil and
solution helps relieve the drainage in Singapore’s long-term coastal
Structural Engineering Division) will
of 38,000 m3, or 15 Olympic-sized protection plans.
focus on sustainable solutions to
swimming pools, of storm water
strengthen Singapore’s resilience Speaking on the background of the
during heavy rainfall. The SDT‘s and
against climate change. study, Lee Adam Harryman, Senior
SDC's success also provides a bench-
Vice-President of the Civil and
“Aligning our strength in engineering mark for future industrial, commer-
Structural Engineering Division and
adaptive approaches with our sus- cial and residential developments to
who leads the Coastal Protection
tainability advocacy, we take own- implement similar solutions that will
Strategy Team, explains that while
ership in driving built environment help slow down storm water flow
climate change impacts all on the
resilience. With the formation of the into the public drainage system.
global scale, it affects different
Coastal Protection Strategy Team,
Sustainable strategies are not just regions differently. More research
we sharpen our focus on defining
for coastal protection. They also contextualising Singapore is es-
innovative solutions and developing
help optimise the environment and sential to create adaptation plans
toolkits to weather through rising
enhance liveability for communi- applicable to the island nation.
sea levels and heavy rainfall”, said Er.
ties. Under the Active, Beautiful
Yeang Hoong Goon, Chief Executive CPG is currently leading the study
and Clean Waters Programme, and
Officer, CPG Consultants. to develop a climate resilience
the Kallang River at Bishan-Ang Mo
masterplan and formulate climate
As a low-lying island city-state, Kio Park project, CPG upgraded
change adaptation measures for
Singapore is particularly vulnerable the drainage for a 1.8 km stretch
integrated coastal protection, to
to climate change. The Centre for along the Kallang River, for flood
keep the population and critical
Climate Research Singapore has control. The river channel itself was
infrastructure safe from flooding.
projected that Singapore could designed based on a flood plain
experience an increase in daily concept and linked to a network In addition to the primary objective
mean temperature of 1.4° C to 4.6° C of drains in the city. In a storm, the of flood protection, the Coastal
towards the end of this century adjacent park area doubles up as a Protection Strategy Team will also
and a mean sea level rise of up to conveyance channel, carrying the work on integrated, multifunctional
1 m by 2100. There have been rainwater downstream gradually, measures and complement land
more intense and frequent heavy to bring about an 80% increase use visions in these areas. Such in-
rainfall events in Singapore, causing in drainage capacity. CPG also tegrated measures will create new
major flooding around the island. deployed soil bio-engineering, a recreational spaces to enhance the
technique for bank stabilisation, liveability of the areas. Examples
As part of the holistic storm water
that incorporates vegetation and of potential measures include sea
management strategy formulat-
engineering structures to increase walls, earthen bunds, empoldering
ed by PUB, Singapore’s National
slope stability. This technique helps and nature-based enhancements
Water Agency, CPG designed and
prevent soil erosion and gives the such as mangroves.
constructed the Stamford De-
area a natural appearance, drawing
tention Tank (SDT) and Stamford CPG is also working on plans to
wildlife to the riverbank and adding
Diversion Canal (SDC). These major nurture a local talent pool of
to the park’s biodiversity.
drainage projects improve storm experienced coastal protection
water flow and reduce flood risk These ongoing efforts highlight professionals, through the Coastal
for the Orchard Road area. During what can be done by an island na- Protection Strategy Team.
SUEZ, a major player in environ- insights provided by the AssetAd- addition to reducing environmen-
mental services, showcased Asse- vanced planning solution. tal impact, and ensuring continui-
tAdvanced, the company’s latest ty and service quality for users.
innovative solution, at Singapore The AssetAdvanced process “Now more than ever, the deploy-
International Water Week 2022. ment of effective asset manage-
By deploying this decision-support • AssetAdvanced collates available
asset data from sources such as ment is a cornerstone issue for
platform, water service and sanita- local communities against the
tion managers are able not only to sensors, inspections, operational
data from geographic information background of ageing infrastructure
expand their knowledge of current and increased pressure on water
assets, but also reduce risks and system (GIS) etc, into a single
analysis, simulation, and visuali- resources. To address this chal-
cost overruns from infrastructure lenge, we are pleased to launch our
failures, as well as make informed sation platform.
all-new offering – AssetAdvanced.
decisions on future investments. • Next, AssetAdvanced implements
AssetAdvanced is the product of
a multi-purpose and multi-crite-
AssetAdvanced is compatible with our group’s longstanding exper-
ria solution to develop scenarios tise in water network and plant
all types of urban services includ- reviewing the current and future
ing public lighting, light signalling, management, which we have
state of assets which, in turn, leveraged and integrated with our
urban development, and urban identify failure risks, and poten-
heating and cooling networks. know-how in data processing and
tial impacts on service. digital solutions. The AssetAd-
A key component in the deci- • Based on data interpretation, As- vanced offering will bolster our
sion-making process, the mainte- setAdvanced then recommends range of smart solutions designed
nance and replacement of assets inspection and replacement plans to improve regional environmen-
within local communities often that are repurposed to meet the tal performance”, said Mr Charles
represents as much as one third of relevant priorities. As such, the Chami, Senior Vice-President, SUEZ
investments. Expected investments solution aims to make assets last Smart & Environmental Solutions
may be reduced by 30%, based on longer (networks and plants), in Business Line.
The two new TRs are: Mr Francis Yap Mr Chow Wai Yein
The Singapore Engineer (TSE): authoritative texts, as a guideline. safety, may not have been clearly
What is the scope of each of the However, using these references defined by international organisa-
TRs? may not adequately serve the tions. This limitation encourages
needs of the local railway ecosys- collaboration and benchmarking for
Co-Convenors (CC): TR 97 covers
tem. To ensure that procedures, comparison of performance. Op-
the requirements of safety manage-
processes and systems adopted erators in different countries have
ment in the rapid transit system,
from these references fit into the varying regulations on the constitu-
spanning leadership and commit-
context of local needs and regula- tion of reportable railway accidents
ment, occupational health and
tions, additional validation process- and near misses. This invariably
safety policies, organisational roles
es are required. One such initiative changes the way railway companies
and responsibilities, hazard iden-
is the project safety review (PSR) benchmark against one another,
tification and assessment of risks,
process which is maintained by the when comparing such statistics
resources, competence, awareness,
regulator, Land Transport Authority globally. Hence, a technical refer-
communications, operations con-
(LTA). The PSR process oversees all ence can augment the Singapore
trol, management of change, emer-
safety-related submissions for all regulator’s efforts to holistically and
gency preparedness and response,
rail projects and through all phases, proactively identify all potential
management review and continual
from conceptualisation to oper- types of incidents in safety perfor-
improvement, within the context of
ations, to ensure all foreseeable mance management.
the Singapore railway industry.
hazards and risks are mitigated,
TR 89 covers the leading and lag- thereby enabling a safe-to-use Railway industry operators and
ging indicators for safety perfor- and safe-to-operate rapid transit the regulator holistically agreed on
mance, defined across the broad system. A safety management the need to have common safety
categories of employee safety, system is therefore needed, that performance indicators for the
contractor safety and passenger demonstrates the ability to meet rail industry, to allow objective,
safety, in the Singapore railway the certification requirements of effective and efficient evaluation
industry. This reference aids Singa- the PSR process. of safety performance, across the
pore railway operators to effective- board. This has led to the creation
The standardisation of the safety
ly establish common ground for of TR 89.
management system aims to
conducting evaluations for interna-
develop a more comprehensive TSE: What are the objectives of
tional benchmarking.
and robust system tailored to the the TRs?
TSE: What are the challenges faced local context. The best practices at
a national level will enhance the CC: TR 97 is intended to be used as
by the railway industry that led to
the creation of the TRs? safety performance of the rapid a technical reference for the railway
transit system for its workforce and safety management system. The
CC: Singapore’s railway operators commuters. Accordingly, TR 97 was key objective is to integrate lead-
had developed individual safety created. ership commitment into the safety
management systems, using management of an organisation’s
foreign, established railway safety We also observed that several business processes, by leading and
management standards and benchmarking indicators, such as promoting a positive safety culture.
For example, parties seeking a ‘safe TSE: Which sectors of the industry With both these technical refer-
to operate’ certification, under the are the TRs relevant to and who ences, the Singapore rail system
authority’s project safety review can benefit from them? will be held in high esteem as a
(PSR) process, will need to submit professional network – not just
CC: With TR 97, rail industry part-
the details of the safety man- the operators, but the industry,
ners can benefit from the standard, as a whole, including the regula-
agement system that meets the through the clarity and transparen-
requirements of the standard. This tor and suppliers, as well. These
cy of the requirements for safety technical references will also create
will eventually lead to the delivery submissions, allowing them to
of compliance and competence a conducive environment for the
demonstrate compliance with the development of skill sets and better
assurance of safe operation and requirements. With the current
maintenance within the railway collaboration among stakeholders
New Rail Financing Framework and to further improve the capability of
industry. associated licensing model, new the industry. This will bring great-
TR 89 aims to improve environ- operators from overseas, may par- er benefits to new operators and
mental health and safety levels at ticipate in the tenders for new rapid eventually to the commuters and
the workplace, across the Singa- transit system operating licences. railway partners.
pore rail industry, by owning a This reference aims to support new
clear safety performance standard operators in meeting the operating
and striving towards compliance safety submission requirements,
The Working Group for
with the standard. The setting of in a manner that is consistent with
TR 89: 2021 and TR: 97:2021
clear performance goals, through regulator expectations.
would like to thank former
established indicators, enables With TR 89, local railway operators co-convenor, Mr Anson
operators to better interpret safety can unveil and elevate their level Lim Chwee Kuong, for his
tolerance levels, in the interest of safety which serves as a core contributions to the development
of identifying and addressing key component in bidding for projects of these technical references.
areas of concern. internationally.
The challenge idea that all parties involved should Zublin is using iTWO technology as
German company, Ed. Züblin AG compile the contractual, commer- the backbone for core processes,
(Zublin), is a leader in building cial, and technical aspects of a which enables BIM models man-
construction and civil engineering, project, as well as the deadlines agement, and forms the basis for
with a history that spans more than and goals, together, and as equal quotation, awarding and billing of
120 years. partners. It establishes a binding subcontractor works, as well as es-
partnership that generates trust timation and construction manage-
Zublin is actively involved in all and guarantees continuous opti- ment within the group.
areas of construction, including misation of costs, schedules and iTWO technology is an integrated
turn-key construction as well as quality. Zublin believes that only solution for collaboration among all
civil engineering work such as if all parties involved in a project stakeholders and project lifecycle
underground, bridge and tunnel collaborate in a constructive part- management. iTWO is the core
construction. nership, in an open and trusting solution of RIB Software’s MTWO
The company’s main market is way, will the project goals of high construction cloud.
turn-key construction. However, quality, customer satisfaction and
efficiency be fully achieved. Within the scope of the team con-
the conventional contractual forms cept, Zublin works with specialised
for turn-key projects often lead to Based on the team concept, Zublin tools, following clear guidelines on
conflict-laden project execution, for has developed guidelines for how to handle all the important
the following reasons: project initiation and execution. aspects of construction projects suc-
• Inefficient and insufficient plan- The company has created common cessfully. The company has a clear
ning processes. project standards which include idea, when approaching a project,
• Inconsistent definition of the structured processes and cross- on how it will carry out the tasks
contractual scope of works. group standards and tools. and the tools it will use.
• Increasing numbers of parties
involved.
• Undefined risk handling.
• Budget conflicts.
At the same time, price competi-
tion in the construction industry
has not brought about the expect-
ed good price/value ratio for the
parties involved. On the contrary;
product quality, confidence in the
performance, customer satisfaction,
as well as the cost-efficient perfor-
mance of the companies involved in
the contract, have all suffered.
Zublin has deployed iTWO as the backbone for core processes.
The solution
To tackle the challenges brought
by traditional forms to turn-key
projects and the competition in
the construction market, Zublin
has been changing its approach to
project initiation.
Over the last few years, the com-
pany has been adopting the ‘team
concept’ in turn-key projects.
The team concept is based on the By adopting iTWO, Zublin is able to perform several tasks accurately.
Cost management
In cost management, Zublin has
defined its goal clearly, with regard
to its workers and customers. The
goal is cost certainty and risk mini-
misation. The company achieves its
goals through transparent depiction
of construction costs, continuous
planned/actual comparisons,
effective control mechanisms and
regular extrapolation of costs with
the support of iTWO.
The adidas World of Sports Arena building is reminiscent of a football stadium.
Procurement management
In procurement management, Zublin
aims to promise customers the best
and most economical supplier or
subcontractor, at the right time. The
company has used iTWO procure-
ment modules for the procurement
processes, plus its in-house procure-
ment solution developed through
cross-regional and regional market
exploration, team-oriented network-
ing for procurement processes, early
awarding of contracts and adoption
of a fair code of ethics to achieve it.
iTWO was used in the cost estimation for the complete shell construction in the World of Sports
Arena building project. The steel work consisting of 9,500 tons of steel was completely modelled
BIM and estimated in iTWO.
With regard to BIM, Zublin’s goal is
model-based confirmation of build- 2019, the building houses more than improvement of their processes.
ability and optimised management 2,000 employees over an area of
of construction processes. With 52,000 m2. Inside the building, the MTWO construction cloud
iTWO, the company is able to do sporting goods manufacturer has im-
model-based visualisation, model- plemented a new, flexible workplace RIB Software’s MTWO construc-
based quantity takeoff and estima- concept that combines the advan- tion cloud is an integrated 5D
tion, and model-based collabora- tages of open, communicative areas BIM enterprise cloud platform for
tion. With BIM models exported with private areas for meetings. contractors, asset owners and de-
from Revit to iTWO, Zublin can use velopers to accelerate their digital
formulas created on the platform The adidas World of Sports campus transformation journey. It helps
to carry out automatic quantity accommodates several modern AEC companies move away from
takeoff and estimation. This results buildings, rich greenery, sports digitalisation with the ‘tool thinking
in the following benefits: grounds and a lake. mindset’ into a ‘platform thinking’
one. It enables all teams on con-
• The 3D-Objects are linked in struction projects to perform their
iTWO with the formulas, so that Long-term partnership for
improved results day-to-day work and collaborate
one can see which object belongs throughout the project lifecycle, on
to which quantity or set of costs. Zublin started to use iTWO 5D tech-
the same platform.
• The bill of quantities can be auto- nologies since 2009, and sees RIB
matically generated. as a long-term partner and iTWO as RIB Software is headquartered in
the core of its ‘process interfusion’. Stuttgart, Germany.
• One can easily make comparisons Within the Zublin Group, more than
between different constructions RIB Software has partnered Soft-
6,000 users are using iTWO tech-
and related prices. wareONE to help construction
nologies in hundreds of projects.
businesses adopt MTWO construc-
For their internal processes, with
The adidas World of Sports tion cloud as part of their digital
iTWO technology, they have high
Arena building transformation journey, so that
control of the software they use,
they can better manage risks, avoid
One of Zublin’s flagship projects the methods they apply and the te-
rework and reduce waste.
implemented using the BIM method nets they want to implement. This
is the adidas World of Sports Arena means they can create lean struc- Headquartered in Switzerland,
building located within the adidas tures with integrated processes, SoftwareONE is a leading global
World of Sports campus in Herzo- and consistent data management. provider of end-to-end software
genaurach, in Germany. Opened in In turn, this leads to significant and cloud technology solutions.
example [3], [4], wind turbine layout, but we will consider only site-assembled. Site-assembly is
spacing is set at 3850 ft. This OWF infield bridges installation-re- not cost-effective and is imprac-
separation will be sub-divided into lated issues. In shallow water tical for building infield bridges.
six segments of about 600 ft each. offshore construction, derrick barge To house a few thousand workers
For a wind farm with 100 turbines, relocation is time-consuming and offshore, for years, to carryout
there will be a few hundred infield non-productive. In a typical oil field site construction, is not a feasible
bridges and a few hundred internal development project, platforms solution. Offshore hourly labour
bridge-support structures. To are usually not far apart. Hence, rates are much higher than onshore
execute this huge construction barge relocation is not a big issue, rates. Therefore, the contracts call
project, we have to invite many requiring just extra hours of barge for all bridges to be fabricated in
qualified fabricators to bid for the time. For a long duration wind farm the yards prior to loadout.
jobs. A bridge length of 600 ft is installation project, as in our exam-
ple, the accumulated barge reloca- A robust design is needed to enable
chosen to suit many yards in the
tion time for all the wind turbines transportation and installation to
region. By having a large pool of
could be more than 100 days. be done without many temporary
bidders, the offered prices should
bracing supports. It is a time-con-
be competitive. For the multi-purpose offshore suming operation to remove
However, bidders submitting al- wind farm, the total relocation time tie-down braces and restore the
ternative proposals should also be is much longer. The unproductive bridge to the original condition, as
allowed. In engineering, there are cost is huge and must be reduced. is usually dictated by the owners.
many ways to do the same job, and In offshore pipe-lay operations, to Maintenance, repair and decom-
some bidders may offer cheaper achieve high lay-rates, the lay-barge missioning activities must be made
alternatives. The work scope calls must move forward on an almost easy and without relying on expen-
for complete fabrication of all the continuous basis, in order to match sive jack-up vessels. These require-
structures in the yards prior to the speed of welding of the pipe- ments call for a different thinking in
loadout. Transportation, installation joints. A higher lay-rate implies the design.
and commissioning will be under higher profit. For the multi-purpose
separate contracts. Installing a 600 OWF project, the installation speed DESIGN OF BRIDGE-SUPPORT
ft long bridge is still within the ca- is a major cost component. STRUCTURES
pability of many qualified installa- One should make sure that the
tion contractors, without the need Design considerations
layout of all the turbine structures The simplest structure is a portal
to build new vessels and/or special is installation-friendly, and the
handling equipment. All installation frame (sway frame) which does not
selected site should not create require frequent underwater in-
bidders will be requested to bid on major problems for pile driving. The
a lump-sum basis. spections. Basically, a portal frame
field layout is site-specific and it is has four piles supporting a deck.
They have to factor in all the risks in not possible to cover this topic at The deck serves as an intermedi-
their proposals. In times of arbitra- length. As a comparison, the time ate landing platform for the infield
tion, it is better to have a lump- needed to relocate a jack-up in- bridges. However, a portal frame is
sum contract. The selected project stallation vessel is much longer, as not buildable offshore, and there
derrick barges should each have a there are many safety procedures are major installation and decom-
lift capacity greater than 2000 tons. to go through before the jack-up
missioning problems with regard to
This bidding strategy is both realis- rig can be set up onsite. The use of
the structure.
tic and cost-effective but requires jack-up vessels is excluded in these
a large project management team articles on multi-purpose wind Pile driving is a routine offshore
(PMT) to coordinate the activities farms. operation, but keeping all four piles
of all the suppliers, contractors and in the correct positions and orienta-
inspectors, from a few countries. Bridge-support structures tions, after driving, is problematic,
The PMT cost could be in the range In the oil & gas industry, a tradition- especially if the piles are set 40 ft to
of millions of dollars. al bridge-support structure is usu- 70 ft apart. To pre-install the piles
ally a tripod or a simple four-pile using a subsea template will change
It is obvious that the infield bridges jacket. In the example of the wind the whole installation concept and
and the internal bridge-support farm, this traditional design is still possibly double the cost due to
structures will be a major cost com- applicable. But the design concept doubling of derrick-barge-days in
ponent of a wind farm project. To must be modified to cut cost. the project.
reduce project cost, three high-cost
impact areas must be studied. Long span bridges To build the whole portal frame
A 600 ft long infield bridge is con- onshore and install it in one piece
Wind farm site selection and field sidered a long span bridge. There is a difficult operation, without lots
layout for the multi-purpose wind are many outstanding long span of bracing members. The leg length
farm bridges in the world, and the com- is 170 ft, and it will be difficult
There are many important factors mon features are their low weight to stab the pile into the leg for
related to site selection and field and the fact that they are usually driving using a small derrick barge.
For safety and/or based on other installation contractor will usually expensive due to difficulties in
process requirements, in few large mobilise one derrick barge to per- moving a big crane on the roads.
oil field developments, the bridge form all the lifts and the campaign It must be dismantled, reassem-
can be as long as 400 ft, if it goes duration is usually less than 30 days bled on-site and load-tested be-
from a production platform to a for a multi-platform field. For an fore using. For a simple, not-too-
flare tower jacket or to a living offshore wind farm, the whole de- heavy lifting job in Singapore, the
quarters platform or to another velopment can last for a few years, rental cost could be few hundred
process platform. In Southeast Asia, and we have to optimise every op- thousand dollars. Big crane rental
the usual bridge design fulfils the eration to cut costs. Therefore, the from Europe will cost a lot more.
following requirements: design requirements for the infield • The bridge must be almost fully
• The bridge is designed for the bridges must be expanded to cover fabricated in the yard prior to load-
simply supported condition. The more conditions. out. Offshore assembly must be
relative displacements, at both • The bridge design must be simple restricted to commissioning items.
ends, can be large, due to inde- enough to encourage more • The bridge design must be ro-
pendent excursions of the two qualified local fabricators to bid. bust, so temporary bracing struc-
supporting structures. The intention is to solicit more tures are seldom needed during
• The bridge design is robust, to competitive prices. A complicated loadout, transportation and
handle loadout, transportation design will cost more to fabricate lifting. However, a large weather
and lifting forces. and with no real advantages. window must be maintained.
Simple, direct load-path design
• The bridge design is suitable for will always be the cheapest. • The bridge must be designed for
single-lift installation using one easy repair, maintenance and de-
derrick barge, for economic rea- • The bridge length must be select- commissioning, and the deploy-
sons. If the bridge is too heavy or ed to suit many local fabrication ment of jack-up rigs and heavy-lift
too long, intermediate bridge sup- yards. vessels should be avoided.
port platforms are introduced and • The bridge rise should be limited From our previous discussions, the
the bridge is cut into two pieces.
to about 100 ft, as large cranes bridge length of 600 ft is selected
For a typical offshore installation are not common in local yards. to suit local conditions, and the lift
campaign in Southeast Asia, the Big crane rental is prohibitively weight is about 2000 tons.
For offshore installation, we will go tenance cost will be high. Cable loads consist of dead loads (solar
for a dual-barge lift, using two small replacement is out of the question. panels, array cables and the weight
size derrick barges. The day-rate A modified version is a bowstring of steel for main and secondary
should be less than USD 100,000 truss bridge which offers a similar structures) and a small traffic load
per day. A single-barge lift will likely load-path as a tied-arch bridge, but (the weight of small inspection
cause overstressing. is stiffer. All the web members will vehicles). There is no heavy traffic
be designed for towing and lifting on the bridge.
For the infield bridge design, the conditions. A better description
usual concept of a structure that is of the design is a tied-arch bridge Based on the above assumptions,
both light weight and long span is supporting six pyramids on deck we estimated the lift weight of
not suitable, as it usually involves with an arch chord (Figure 5). A the bridge to be about 2000 tons,
site-assembly using special equip- truly bowstring truss has a curved which included a large contingency
ment. Hence, both suspension and arch which is not beneficial for the factor. In the design example, one
cable-stayed bridges can be ruled project. arch bend is sufficient instead of
out. The other possible choices two inclined arches, but a spread
could be a truss bridge, a tied-arch Large diameter curved tubulars footing is needed at each end to
bridge or a network arch bridge [6], have to be ordered directly from provide more stability (Figure 5).
[7]. They are all self-equilibrated the mills around the world. Each This means that the arch chord
structures and can be fully fabricat- mill has a different rolling sched- should bifurcate near the supports.
ed at a yard. However, they have ule and shipping timetable. Every To prevent lateral buckling of the
shortcomings. Since we imposed a fabrication yard must take this into compression arch chord, if needed,
height limit of 100 ft, a 600 ft long careful consideration in the fabrica- the arch chord walkway can be
uniform depth truss bridge will be tion schedule. In fact, delay is un- designed to work as a strong-back
heavy and costs more to fabricate. avoidable in a big project for many structure to provide the required
unforeseeable reasons, especially lateral restraint forces.
Alternatively, the tied-arch bridge since the suppliers are from many
and the network arch bridge are countries. It would be better to use Fabrication, loadout and
load-path efficient. But cable hang- locally produced straight chords transportation
ers will have corrosion problems in instead of curved ones. For the Fabricating a straight chord bow-
an ocean environment and main- bridge design, the primary design string truss bridge is not a difficult
task except at the joint intersec- situation is when the bridge goes Installation and decommissioning
tions. One possible joint detail is across the loadout bulkhead onto From the load-path consideration,
shown in Figure 5. In general, the the barge. The usual overstress is the cheapest way to install an infield
eccentricity moment will have caused by differential settlements bridge is to use two derrick barges,
little effect on a fully triangulated of the barge and the bulkhead, due one at each end. The bridge will be
offshore structure, if the amount to imposed loads, ballast/de-bal- lifted in the same way as it will be
of eccentricity is within the D/4 lasted water and tidal variation. In positioned in the final in-place condi-
limit. If necessary, we can perform the design example, the supports tion. Therefore, structural strength-
Finite Element Analysis (FEA) to have been arranged to ensure the ening is not necessary during lifting.
confirm the proposed detail, if it is bridge will always behave in a ‘sim- A proposed lifting arrangement is
not covered in the codes. However, ply-supported condition’, so that shown in Figure 6. Dual-barge lift is
FEA should not be over-used as a the support reactions do not vary. not a new concept. In a past proj-
standard design procedure. Since This will eliminate all the problems. ect, a 1600 ton production deck,
the bridge height is limited to 100 Otherwise, the loadout process will the heaviest deck in Asia at the
ft, the whole bend can be fabri- be more complicated and costly to time, was lift-installed in Indonesia,
cated on the ground, then rolled co-ordinate. Local structural fail- more than 35 years ago. Since the
up to the vertical position to mate ures have been observed in a few eight-leg production deck was less
with the bridge deck and the web loadout cases before, and on-site than 200 ft long, the two barges
members, using yard cranes. repairs and urgent re-certification were tied together to perform the
caused project delays. To reverse lift. The dual-barge system was able
In loadout operation, failures may
the loadout operation is not possi- to inch forward in unison using an-
occur in the bridge structure, the
ble in all cases. chor lines and support from a fleet
transportation barge, the loadout
skidways and the loadout bulk- For transportation, the barge-bridge of anchor handling tugs (AHTs).
head. Usually the last three items system will experience towing forces In the present situation, the two
have been conservatively designed such as heave, roll and pitch. Some barges are 470 ft apart and there
by the barge owner and the yard. restraints may be needed. But, this is not enough space to run all the
The biggest uncertainty is the is a project-specific issue and cannot anchor lines independently within a
bridge structure. The most critical be covered in this article. small separation. Spacer-barges may
be needed to tie them together to industry is more than 100 years Farms’, The Singapore Engineer, March
form a single unit for lifting. Alterna- old and it has accumulated a huge 2021, 22-28, Institution of Engineers,
tively, we can lift from other points, amount of experiences in all areas. Singapore.
but additional strengthening will be It also has a huge inventory of [4] Cheung Bob L Y (2021): ‘Design
needed. However, the final lifting equipment. Huge savings can be Economics of Trimaran Wind Turbine
arrangement will usually be decided realised if one can make use of Installation cum Decommissioning
by the barge superintendent who is this asset. Wind energy is free and Vessels’, The Singapore Engineer,
the commander for the whole op- September 2021, 28-33. Institution of
abundant, and it must be possible
eration. He is always supported by a Engineers, Singapore.
to extract it with the least cost.
team of engineers to double-check [5] Chen X, Li C F & Tang J (2016):
every step. For a two-point lift, the ‘Structural Integrity of Wind Turbine
REFERENCES Impacted by Tropical Cyclones: A Case
hook loads will not change. From
[1] International Energy Agency (2021): Study from China’, Journal of Physics:
experience, we believe that this is
‘Net Zero by 2050, a Roadmap for the Conference Series 753(2016) 042003.
an economical solution.
Global Energy Sector – Special Report’, [6] ‘Tied-arch bridges’, SCI Publication
IEA Publication, May 2021 (https:// UK (https://www.steelconstruction.
CONCLUSION www.iea.org). info/index.php?title=Tied-arch_bridg-
In the three articles on the design [2] Alsubal S el al (2021): ‘Life Cycle es&oldid=11417).
economics of offshore wind farms, Cost Assessment of Offshore Wind [7] Tveit P (2014): ‘The Network Arch.
the feasibility of the alternative Farm: Kudat Malaysia Case’, Sustainabil- Bits of manuscript in March 2014 after
approach is presented with a few ity 2021, 13, 7943, MDPI. lectures in 50+ countries’.
design sketches to support the [3] Cheung Bob L Y (2021): ‘Design Eco- (More information may be obtained
argument. The offshore oil & gas nomics of Multi-Purpose Offshore Wind from bob.cheung@rocketmail.com)
The building housing the offices of that acts as mediator between draw references from Frank Lloyd
Enel (an Italian multinational manu- public space and private space, Wright to Ludwig Mies van Der
facturer and distributor of electricity and is open on one side along the Rohe and from Giuseppe Terragni
and gas), in Palermo, was built in main thoroughfare, Via Marchese to Le Corbusier.
1963 according to a design by the Di Villabianca. The decision to
architect Alberto Samonà in collabo- avoid having a closed-off block is a By assembling the elements over
ration with his son, Alberto, and Gi- reminder of Palermo’s approach to multiple vertical floors, and creat-
useppina Marcialis. It was welcomed town planning in the 19th century ing windows with an eccentric axis
by critics as an architectural example and results in the provision of two of rotation, the design creates truly
of exceptional formality and is one splendid gardens. dynamic architecture.
of the most prominent buildings of
Various influences and linguistic FIGHTING AGAINST
post-war Palermo.
overlaps can be found in the four DETERIORATION
The volume of the structure is buildings that host the Enel offices.
arranged into four buildings of In fact, according to the architec- Before the restoration work was
different heights, grouped around tural historian, Manfredo Tafuri, carried out, the structure of the
a courtyard garden, an element there is a mixture of styles that complex was in an advanced state
RESTORATION WORK
The aim of the refurbishment and
conservative restoration work was
to conserve the front of the build-
ing and provide effective protection
while, at the same time, safeguard-
ing its historic and architectural
significance by respecting the orig-
inal typology, forms and structural
characteristics of the elements. The deteriorated concrete ledges were repaired with MAPEGROUT 430 preblended, normal-
setting, fibre-reinforced, thixotropic cementitious mortar.
The approach to the project was
based on the concept of ‘minimum with the reference European Stan- After demolishing all the crumbling
intervention’ and on the principle dard (EN 1504), had to be followed. and unstable areas, and any parts
of the ‘mechanical, chemical and With technical support from Mapei, of the concrete that had become
physical compatibility’ of the old the work cycle was defined, along detached, and brushing the rebar
materials used for the original with the materials required to meet by hand and then cleaning all the
structure with the new materials the requirements of the client. After surfaces, the rebar was passivated
used to integrate the old materials the first series of tests with mortars, by applying, by brush, two coats
or to carry out repairs. the next step was to test the wall of MAPEFER 1K one-component,
The most difficult part was choosing coatings and then the complete corrosion-inhibiting cementitious
which materials to use for the resto- cycle proposed for the intervention. mortar. The deteriorated con-
ration work, to ensure the identity The entire system respected the crete structures were then re-
and the memory of the building original aesthetic characteristics and paired by applying, with a trowel,
were respected, and whose symbol, guaranteed a good level of protec- MAPEGROUT 430 pre-blended,
still imprinted on the façade, was tion for the concrete. normal-setting, fibre-reinforced,
represented by the marks left by the thixotropic, cementitious mortar.
wooden formwork originally used to Restoration of the ledges The surfaces were skimmed with
mould the raw concrete. Work was carried out on the de- PLANITOP 210 one-component,
teriorated areas in the protruding water-repellent, normal-setting,
MAPEI’S CONTRIBUTION part of the ledges by reintegrating fine-grained, cementitious skim-
the gaps and missing parts in each ming mortar.
To plan the work and guarantee a element to restore them to their
high level of durability and, at the original shape, consolidating the The product chosen to protect the
same time, overcome the problem existing deteriorated parts and, horizontal surfaces was MAPELAS-
of restoring exposed-finish concrete, lastly, treating the elements with TIC GUARD two-component, flex-
a well-defined procedure, compliant protection and finishing systems. ible, waterproofing cementitious
PROJECT DATA
Project
Enel offices, Palermo, Italy
Year of construction
1963
Period of the intervention
2013 to 2015
Client
Enel Servizi srl
Design
3TI Progetti Italia SpA
Technical consultant
Davide Bugliarelli, Tecnotek srl
Main contractor
Sicci Sud
The concrete surfaces of the ledges were skimmed with PLANITOP 210 water-repellent, normal-
setting, fine-grained cementitious mortar.
INTERVENTION BY MAPEI
Contribution by Mapei
Supply of products for concrete
repair and for the restoration of
façades
Mapei distributor
Saces
Application of Mapei products
Concrete repair – MAPEGROUT
430, MAPEFER 1K
Skimming surfaces –
PLANITOP 210
Waterproofing – MAPELASTIC
Also on the balconies, the rebar was treated with MAPEFER 1K and MAPEGROUT 430 was chosen
GUARD
to repair the deteriorated elements. Painting façades – MALECH,
ELASTOCOLOR PAINT
mortar which forms an effective ing the surfaces, the rebar was Website for further
barrier against the penetration of protected with MAPEFER 1K, and information
sodium chloride and calcium and MAPEGROUT 430 was chosen to www.mapei.com
sulphate salts, and against the repair the deteriorated elements. www.mapei.it
penetration of carbon dioxide into
The surfaces were then treated
concrete substrates.
with MALECH acrylic water-based
primer, before applying ELASTOCO-
Refurbishing balconies and LOR PAINT, an acrylic resin-based This editorial feature is based
exposed-finish elements paint in water dispersion. on an article from Realtà MAPEI
The balconies, made up of three INTERNATIONAL Issue 91.
The same type of work was carried Images by Mapei.
different elements, were restored
out to restore the structural integ-
by repairing the deteriorated areas,
rity of exposed-finish, load-bearing
while maintaining the original look
elements, such as beams, pillars ensure that the old parts and the
and consistency of the architec-
and partition walls. rebuilt parts would have the same
tural features. This part of the
work included the repair of the old texture, absorption and colour. The
concrete and rebar, followed by the Painting the façades coloured finish of the surfaces was
application of a protective coating The aim of this part of the work again created by applying MALECH
and finish. As in the previous case, on the façades was to even out primer followed by ELASTOCOLOR
after brushing the rebar and clean- and protect all the surfaces, and to PAINT elastomeric paint.
Benefits of digitalisation
As the solution provider, Doka
demonstrated that slopes of almost
30° and slab thicknesses of 4 m
can be achieved. The Töging am
Inlet structure: The water of the Inn river is guided from the inlet structure through the pressure
Inn project involved expanding and
pipeline to the turbine. Around 1,400 frames of the Load-bearing tower Staxo 100 were used for the
modernising an old power plant as inlet structure. In order to compensate for the longitudinal incline of 26.5°, the shoring system was
well as building a new one. In this installed on a special construction of the Large-area formwork Top 50. The top of the inlet structure
project, the geometry of the turbines was formed with pre-assembled and largely reusable Top 50 elements. Image: Doka.
and inlet slabs was so complicated in
several areas that formwork planning With custom-built modules de- basis for the high level of safety in
would not have been possible with- livered, already pre-assembled, what is currently Germany's largest
out a comprehensive 3D model. the construction company could hydroelectricity construction site.
The aim was to understand which concentrate on reinforcing and con- Everything was running seamlessly
negative forms were needed to en- creting. Even six-level structures, until the COVID-19 pandemic period,
sure flawless concreting later on. Ac- such as stair towers, were simple to when there were scarcely any border
cordingly, PORR GmbH & Co KGaA, handle and could be moved easily crossings or on-site support possible,
the construction company, received with one of the five cranes. All this and almost everything had to be
the freeform formwork to cope with gave the construction crew a feel- done remotely, via video calls. How-
the demanding geometry. ing of security at work – another ever, it was still possible to obtain a
Impressive achievement
Compared to the historic power
plant, built 100 years ago by up to
7,000 workers on what was then
Europe’s largest construction site,
the new and modern construction
architecturally blends modestly into
its surroundings. However, its perfor-
mance, with three vertically an-
chored turbines, has been enhanced.
All parameters, from the increased
flow rate, to the storage level and
rise, to the bottleneck capacity and Pressure pipe area: The water plunges down through three pressure pipelines, each with a 10.4 m x
controlled output, are designed to 12.75 m cross-section and a gradient of 26.5°. Then the water is directed towards the three Kaplan
supply an extra 50,000 households turbines. Framed formwork Framax Xlife was used to build the steeply inclined walls. Image: Doka.
with electricity. Bavarian operator
Verbund Innkraftwerke has spent
a quarter of a billion euros on the
project between Jettenbach and
Töging.
PROJECT DATA
Project
Töging Power Plant
Location
Töging am Inn, Germany
Client
Verbund Innkraftwerke GmbH Powerhouse: The main challenges when constructing the powerhouse with its three truncated
cones for the turbines, including spiral covers, were the complexity of the cone geometry
Architect and turbine slabs, and the ambitious schedule. On top of that, the activities of the numerous
Format Elf Architekten/Robert participants had to be coordinated. The comprehensive 3D models were extremely helpful for
Maier Architekten coordination and approval. Image: Kasjan Choroba.
Construction
PORR GmbH & Co KGaA
Construction period
2019–2021
Doka products in use
Framed formwork Framax Xlife
Load-bearing tower Staxo 100
Top 50 special elements
Moulded timber boxing
Working scaffold Modul
Stair towers
Dokamatic tables
Circular formwork H20
Folding platform KL
Special platforms
Doka services provided
Concremote
Outlet structure: The outlet structure guides the water back into the Inn river. In addition to the
Formwork planning Framed formwork Framax Xlife and Load-bearing tower Staxo 100, Dokamatic tables were used as
slab formwork. Image: Doka.
The zero-emissions, near-silent ECR25 Electric excavator, from Volvo Construction Equipment, has now entered the Asian market.
ADVERTISERS’ INDEX
IES Chartered Engineer ––––––––––––– Inside Front Cover Mitsubishi Electric Asia Pte Ltd –––––––––––––– Page 01
IES Membership –––––––––––––––––– Inside Back Cover Who’s Who In Engineering, ––––––– Outside Back Cover
Glasstech & Fenestration Asia 2022 –––––––––– Page 19 Singapore (3rd Edition)
WHO’S WHO
IN ENGINEERING,
SINGAPORE
(THIRD EDITION)