Introduction
• joint is a term generally applied when more than one cables are
• الوصله هو مصطلح يتم تطبيقه بشكل عام عند توصيل أكثر من كابل واحد من خالل جهاز
.ميكانيكي
cable.
2
Introduction
• Terminations: Terminations are used to terminate electrical cable
cables.
. إنهاء كبالت الجهد المتوسط/ • تُستخدم مجموعات مسبقة الصنع و ُمصنَّعة لربط
3
Requirements of Joints متطلبات الوصالت
Insulation عزل
4
Requirements of Terminations
Conductor connection وسيلة توصيل الموصل
Outdoor)
5
Jointing & Termination Systems أنظمة التوصيل والنهايات
6
Type of Joints أنواع الوصالت
Straight-through joints 3- to 1-core فاز1 كبالت3 فاز مع3 وصتة مستقيمة كبل
Transition joints 3- to 1-core فاز1 كبالت3 فاز مع3 وصلة انتقالية كبل
12
MV JOINTS
&
TERMINATIONS
13
Cold Shrink
14
• Joint body manufactured like a cable by extrusion. Hence void-free
bonding between the different layers of the joint body.
ومن ثم فإن الترابط الخالي من الفراغ بين الطبقات.• يتم تصنيع الجسم مثل الكابل عن طريق البثق
.المختلفة لجسم الوصلة
.• يقلل بشكل كبير من االعتماد على المهارات اليدوية ومن ثم يمكن االعتماد عليه بدرجة عالية
15
Installation Procedure- Joint طريقة التركيب – الوصلة
• Cleaning تنظيف
16
Installation Procedure- Joint
17
Installation Procedure- Joint
18
Installation Procedure- Joint
19
Installation Procedure- Joint
20
Installation Procedure- Joint
21
Installation Procedure- Joint
22
Installation Procedure- Joint
23
Installation Procedure- Joint
24
Installation Procedure- Joint
Apply C spanners and slowly apply pressure to split the carrier. Wait until the
short side carrier has ejected.
Reposition Elaspeed joint as necessary.
25
Installation Procedure- Joint
Remove blue straps and wait until the long side carrier has ejected.
26
Installation Procedure- Joint
Gently tap self-eject carrier with hammer along the weak longitudinal lines
(coloured black)
27
Installation Procedure- Joint
28
Installation Procedure- Joint
Remove excess grease and apply 2 half lapped layers of EPR tape over
the ends of the joint.
29
Installation Procedure- Joint
Fold back stocking braid and secure over copper wires using constant
force spring.
30
Installation Procedure- Joint
31
Installation Procedure- Joint
32
Installation Procedure- Joint
33
Installation Procedure- Joint
34
Installation Procedure- Joint
COMPLETED JOINT
38
39
40
41
Screened Elbow
Termination