Machinary Rent 187,220.

00
material supply and
trip 850,000.00
summary
Boulder Selected Material Cart Away
Date Number Of Trips Date Number Of Trips
25-05-23 4 28-05-23 3
26-05-23 1 29-05-23 3
27-05-23 0 30-05-23 0
28-05-23 8 31-05-23 0
29-05-23 7 1/6/2023 0
30-05-23 5 2/6/2023 0
31/6/2023 0 3/6/2023 0
1/6/2023 1 4/6/2023 10
2/6/2023 1 5/6/2023 0
3/6/2023 0 6/6/2023 0
4/6/2023 0 Total 16
5/6/2023 3
Total 30
Trip Excavator Grader

Number Of Trips
from cccc quarry
Date site Date Total worked time Total worked tim
6/6/2023 10 29/05/2023 10.5 3
7/6/2023 16 30/05/2023 9.5 2
8/6/2023 7 31/05/2023 8
9/6/2023 14 1/5/2023 0
10/6/2023 13 2/5/2023 2
11/6/2023 4 3/5/2023 0
12/6/2023 10 4/5/2023 2
13/6/2023 10 5/5/2023 3.1
14/6/2023 10 6/5/2023 8
15/6/2023 11 7/5/2023 4
Total 105 8/5/2023 6
9/5/2023 4
10/5/2023 7
11/5/2023 8
12/5/2023 8
Total hour 20 65.1

Checked By

Prepared By
Grader

Total worked time


3
2
8
0
2
0
2
3.1
8
4
6
4
7
8
8
65.1
Mobilization
Excavator from debre brhane to addis (chacka project) 150,000.00
Excavator from chacka project to addis 20,000.00
total 170,000.00

Checked By

Prepared By
Description Qantity unit price Amount
Boulder
Number Of Trips Material
Selected from cccc 30 13,000.00 390,000.00
quarry site 105 4,000.00 420,000.00
Cart Away 16 2,500.00 40,000.00
Total 850,000.00

machinary rent Grider 65.1 2,200.00 143,220.00


machinary rent excvator 20 2,200.00 44,000.00
Total 187,220.00