1. CHAPTER TWO ; ABOUT THE PROJECT


2. CHAPTER THREE ; OVER ALL INTERN SHIP TECHNICAL EXPERIENCE

CHAPTER TWO ; ABOUT THE PROJECT

1. Reference ; Department of Hydraulic and Water ResourceEngineering


Hosting Company:Gondar small scale Irrigation Company
Final Internship Report

 
 CHAPTER TWO2 Overall internship experience
I had been working in small scale Agricultural and Rural development in ConBased on the new
curriculum, I was doing internship for one full semester at Centeral Gondar SmalScale Irrigation ,Water
Resource and Development Department (CGWRDD). I have gained a lot ofunderstanding and
experiences on practical application of water construction in a well-organized andeffective manner. While
I was staying there, I have got several opportunities to visit project frequentlyto observe the progress and
to see the related activities. Within a fourth month stay in thisorganization, I have spent ample time with
site engineers, office engineers and quantity surveyors withsufficient orientation and practical
involvement on the site and office work. In this report, I have included insights that I have gained during
the internship time both site andoffice work knowledge. Off course it is difficult to report all what I have
seen, though I have tried tohighlight the main points

I had been working in Small Scall irrigation Project in Construction part .


2.1 The work flow of the department looks like;
 Data collection from field by different discipline

 Agronomical data collection


 Geological data collection
 Socio-Economical data collection
 Surveying data collection.
2.2 Procedures and methods

Metrological data collection from metrology station.

Surveying data collection from geologist.

Agronomic data collection from agronomist.2.
3 Challenges

Due to Shortage of cars and disallowance of the head, I was not lucky to visit the project site.

Shortage of computers and internet access in the enterprise.

Supervisors were busy and unfortunately they went to site so, they couldn’t advise properly.

There is no finical support from the computer.

In the site there is uncomfortable weather condition.

Lack of oce and oce maerials.

Lack of consructon safey wears.
2.4
 In order to overcome the challenges I have been using

I was using different materials like softcopy and hard copy

Trying to make the machineries to be maintained as fast as possible.

By asking my supervisors

I tried to use my own materials

Work efficiently to any task given by my supervisor.

To wake up early and used different transportation mechanisms.

Following carefully while the workers do measurement.

2.4 About project


Project name:
Gabikura diversion weir Irrigation Project2.
Name of the stream: Gabi Kura3.
Location of the weir site North:
0312593 East: 1381651 Altitude: 1892Zone: North Gondar Woreda: Dembia4. HydrologyDesign rainfall (Pd): 85.79
mmCatchment area: 43.012km
Project cost

2.4.1 Project Background


2.4.2 Scope of works
2.4.3 Summary of Geometric Design Parameters
2.5 work tasks I have been working
On this section, I was trying to cover all the basic works, which are related to water
supply Project Construction. The activities that I have been working in are listed as
follows:
1. Earth work
2. Construction of 150 m3 Masonry Reservoir work spacaly