5. Academic Block:- Positioning and fixing door fixtures like handles and catcher
Report No. 9 Page 5 of 39
6. Academic Block:- 1st floor corridor above auditorium, pipe laid outside the ceiling and 1st floor corridor near library
Report No. 9 Page 6 of 39
7. Academic Block:- 1st floor above students entrance, 90 seater classroom adjacent to 140 seater classroom- The crack is going all along the length of the wall till the ground floor classroom beneath.
Report No. 9 Page 7 of 39
8. Academic Block:- The sockets were moved near door but earlier sockets have not been filled back and board panels have been installed
Report No. 9 Page 8 of 39
9. Academic Block:- The blocks beneath the beam in 140 seater classroom have been damaged
Report No. 9 Page 9 of 39
10. Staff C:- Ground floor- Block work not done properly, misalignment and gaps present,
Report No. 9 Page 10 of 39
11. Shopping Block:- Plaster from the outside wall has worn out
Report No. 9 Page 11 of 39
12. Shopping Block:- Sidewalk/ plinth protection outside is not straight
Report No. 9 Page 12 of 39
13. Medical Centre:- Behind the medical block the window sill is not straight
Report No. 9 Page 13 of 39
14. Medical Centre:- Behind the medical block the chambers are unevenly levelled
Report No. 9 Page 14 of 39
15. Medical Centre:- Granite stone on the sill of the window is not finished with moulding
Report No. 9 Page 15 of 39
16. Hostel 2:- Porch skirting 2nd floor is uneven
Report No. 9 Page 16 of 39
17. Hostel 2:- 2nd floor washroom deck slab has not been finished properly
Report No. 9 Page 17 of 39
18. Hostel 2:- 3rd floor left wing room- Rubber of window is not fixed properly
Report No. 9 Page 18 of 39
19. Hostel 2:- 3rd floor left wing room- Plaster work poorly done
Report No. 9 Page 19 of 39
20. Hostel 2:- 3rd floor left wing corridor- Unevenly done tiling work
Report No. 9 Page 20 of 39
21. Hostel 2:- 3rd floor left wing room- Improper fitting of cupboard
Report No. 9 Page 21 of 39
22. Hostel 2:- Improper width of skirting
Report No. 9 Page 22 of 39
23. Hostel 2:- 4th floor washroom- Gap between Deck slab and wall at ,ark 1 and at mark 2 there is improper joint of slab and vertical tile
Report No. 9 Page 23 of 39
24. Hostel 2:- Skirting at stairs on 5th floor stairs is of different shade
Report No. 9 Page 24 of 39
25. Hostel 2:- 5th floor- wall cladding of lift is improperly finished
Report No. 9 Page 25 of 39
26. Hostel 2:- 5th floor- Lift wall cladding is improper and require chipping
Report No. 9 Page 26 of 39
27. Hostel 2:- 6th floor- Different construction in front of lift area compared to other floors
Report No. 9 Page 27 of 39
28. Hostel 2:- External column not straight
Report No. 9 Page 28 of 39
29. Hostel 2:- Top floor window is not properly installed, getting tilted.
Report No. 9 Page 29 of 39
30. Hostel 2:- 6th floor corridor wal has developed cracks
Report No. 9 Page 30 of 39
31. Hostel 2:- Leakage from the water tank
Report No. 9 Page 31 of 39
32. Hostel 2:- Crack on the walls of the stairs
Report No. 9 Page 32 of 39
33. Hostel 2:- Tapered ceiling board near 5th floor stairs
Report No. 9 Page 33 of 39
34. Hostel 2:- Slanting column of 5th floor in front of lift
Report No. 9 Page 34 of 39
35. Hostel 2:- Improper finishing of the stairs at 2nd floor
Report No. 9 Page 35 of 39
36. Hostel 2:- Out of shape cutting of kota stone on the stairs at 1st floor landing
Report No. 9 Page 36 of 39
37. Hostel 1:- Ground floor – Lift wall cladding of different shade
Report No. 9 Page 37 of 39
38. Improper finishing of the exterior wall of the shopping block