QUALITY CONTROL OBSERVATIONS

Report No. 9 07/06/2023


S.No Observations Photographs
.
1. Academic
Block:-
Ceiling on
reception
corridor is
damaged due
to falling
debris

Report No. 9 Page 1 of 39


2. Academic
Block:-
ground floor
right side of
student
entrance ,
Improper
finish work on
wall near door

Report No. 9 Page 2 of 39


3. Academic
Block:-
Reception
right side
corridor
outside ,
plaster work
improperly
done

Report No. 9 Page 3 of 39


4. Academic
Block:-
Stairs above
reception,
improper wall
alignment

Report No. 9 Page 4 of 39


5. Academic
Block:-
Positioning
and fixing
door fixtures
like handles
and catcher

Report No. 9 Page 5 of 39


6. Academic
Block:-
1st floor
corridor above
auditorium,
pipe laid
outside the
ceiling and 1st
floor corridor
near library

Report No. 9 Page 6 of 39


7. Academic
Block:- 1st
floor above
students
entrance, 90
seater
classroom
adjacent to
140 seater
classroom-
The crack is
going all
along the
length of the
wall till the
ground floor
classroom
beneath.

Report No. 9 Page 7 of 39


8. Academic
Block:- The
sockets were
moved near
door but
earlier sockets
have not been
filled back
and board
panels have
been installed

Report No. 9 Page 8 of 39


9. Academic
Block:- The
blocks
beneath the
beam in 140
seater
classroom
have been
damaged

Report No. 9 Page 9 of 39


10. Staff C:-
Ground floor-
Block work
not done
properly,
misalignment
and gaps
present,

Report No. 9 Page 10 of 39


11. Shopping
Block:-
Plaster from
the outside
wall has worn
out

Report No. 9 Page 11 of 39


12. Shopping
Block:-
Sidewalk/
plinth
protection
outside is not
straight

Report No. 9 Page 12 of 39


13. Medical
Centre:-
Behind the
medical block
the window
sill is not
straight

Report No. 9 Page 13 of 39


14. Medical
Centre:-
Behind the
medical block
the chambers
are unevenly
levelled

Report No. 9 Page 14 of 39


15. Medical
Centre:-
Granite stone
on the sill of
the window is
not finished
with moulding

Report No. 9 Page 15 of 39


16. Hostel 2:-
Porch skirting
2nd floor is
uneven

Report No. 9 Page 16 of 39


17. Hostel 2:-
2nd floor
washroom
deck slab has
not been
finished
properly

Report No. 9 Page 17 of 39


18. Hostel 2:-
3rd floor left
wing room-
Rubber of
window is not
fixed properly

Report No. 9 Page 18 of 39


19. Hostel 2:-
3rd floor left
wing room-
Plaster work
poorly done

Report No. 9 Page 19 of 39


20. Hostel 2:-
3rd floor left
wing corridor-
Unevenly
done tiling
work

Report No. 9 Page 20 of 39


21. Hostel 2:-
3rd floor left
wing room-
Improper
fitting of
cupboard

Report No. 9 Page 21 of 39


22. Hostel 2:-
Improper
width of
skirting

Report No. 9 Page 22 of 39


23. Hostel 2:-
4th floor
washroom-
Gap between
Deck slab and
wall at ,ark 1
and at mark 2
there is
improper joint
of slab and
vertical tile

Report No. 9 Page 23 of 39


24. Hostel 2:-
Skirting at
stairs on 5th
floor stairs is
of different
shade

Report No. 9 Page 24 of 39


25. Hostel 2:-
5th floor- wall
cladding of
lift is
improperly
finished

Report No. 9 Page 25 of 39


26. Hostel 2:-
5th floor- Lift
wall cladding
is improper
and require
chipping

Report No. 9 Page 26 of 39


27. Hostel 2:-
6th floor-
Different
construction
in front of lift
area compared
to other floors

Report No. 9 Page 27 of 39


28. Hostel 2:-
External
column not
straight

Report No. 9 Page 28 of 39


29. Hostel 2:-
Top floor
window is not
properly
installed,
getting tilted.

Report No. 9 Page 29 of 39


30. Hostel 2:-
6th floor
corridor wal
has developed
cracks

Report No. 9 Page 30 of 39


31. Hostel 2:-
Leakage from
the water tank

Report No. 9 Page 31 of 39


32. Hostel 2:-
Crack on the
walls of the
stairs

Report No. 9 Page 32 of 39


33. Hostel 2:-
Tapered
ceiling board
near 5th floor
stairs

Report No. 9 Page 33 of 39


34. Hostel 2:-
Slanting
column of 5th
floor in front
of lift

Report No. 9 Page 34 of 39


35. Hostel 2:-
Improper
finishing of
the stairs at
2nd floor

Report No. 9 Page 35 of 39


36. Hostel 2:-
Out of shape
cutting of kota
stone on the
stairs at 1st
floor landing

Report No. 9 Page 36 of 39


37. Hostel 1:-
Ground floor
– Lift wall
cladding of
different
shade

Report No. 9 Page 37 of 39


38. Improper
finishing of
the exterior
wall of the
shopping
block

Report No. 9 Page 38 of 39


Thank You.

Report No. 9 Page 39 of 39