QUALITY CONTROL OBSERVATIONS

PR Sample House: 1st-floor left wing

PR & APR Housing 09.06.2023


- Report No. 12

S.No. Observations Photographs

1. Need 180°
view with
bigger size
magic eyes.

2. Curtain rods
need to
change.

Page | 1
3. More
samples need
to be
provided

4. No support
was
provided for
the
washbasin.

Page | 2
5. Ex. Fan
location in
the top right
corner

6. False ceiling
joints should
be in a single
stretch.

Page | 3
7. Approved
lights need to
be installed
in the sample
house.

8. There should
be a service
point in
GRC Jali.

Page | 4
9. The
Chinmay
outlet point
was given
inside the
GRC Jali
and should
come
outside.

10. The Kitchen


Jali latch is
not working.

Page | 5
11. The gap in
the kitchen
balcony door

12. The tube


light was not
installed in
the way.

Page | 6
13. There is no
soft close in
the master
bedroom
drawers.

14. Not closing


properly –
Bed number
2

Page | 7
15. The master
Bedroom
Door closer
is damaging
the wall and
needs to be
relocated to
the main
entrance.

16. The gap


needs to be
fixed.

Page | 8
17. The kitchen
upper side
and pipe
need to be
covered.

18. A corner
carousel
needs to be
provided

Page | 9
19. The double
barrel sink
should be
there.

20. The
dishwashers
need to be
fixed.

Page | 10
21. Two spoon
trays should
be there in
the first two
trays.

22. Dustin tray


and any
other as per
NIT

Page | 11
23. The inside
cupboard
also should
be glossy, as
suggested by
the Sikka
team.

24. Machine-
finished edge
band

Page | 12
25. Three
Masala
bottle trays
should be
there.

26. There is a
cupboard
above the
working
space.

Page | 13
27. Two cabinets
🗄️with
separate
doors on
both the
sides

Page | 14