ATTENDEES
1. 1. Jeannie Gan Eliwork
2. Alvin Cornejo Eliwork
3. Camilo Caluban Eliwork
Summary:
1. General Remarks
a. Change all bathroom fittings – faucet, shower host (recommended)
b. Add water heater for all T&B (needed)
c. Change P Trap of all lavatories
d. Need professional cleaning for ACU/Change the whole unit (recommended)
e. Cabinet hinges should be changed to soft closed (recommended)
f. Threshold needs repair
g. Buy all necessary furniture, fixtures and equipment
h. Hide all exposed electrical plastic molding
i. Ceiling not properly installed. The terminations are visible.
2. Architectural
a. Repainting (optional)
3. Toilet near entrance
a. Door is hard to close. (needed)
b. The bidet has a very low water pressure
c. Lavatory for repair due to leak
4. Den T&B
a. Water closet for repair due to leak
b. Change tiling because of visible rust stains
5. Living Room
a. Some switches are not functioning
b. Cove lights are not functioning
c. Floor light under the stairs not functioning
6. Dining Room
a. The 4.5M (13.5sqm) exterior wall needs to be demolished due to large cracks.
(needed)
b. One screen door has no screen
c. Cove lighting not working
7. Kitchen and Dirty Kitchen
Minutes of Interior Design Department Meeting. 03/03/2023 Page 1 | 2
a. Cabinets are not aligned. Some cannot be closed properly.
b. Adjust/Replace Island Countertop due to misalignment on installation
(recommended)
8. Pool
a. Change water pump due to rust
9. Family Hall
a. Ceiling has hole that needs to be covered.
10. Masters Bedroom T&B
a. Clogged lavatory for repair
11. Masters Bedroom Walk-in Closet
a. Remove wallpaper installed on closet shelves and repaint