You are on page 1of 5

Bucal Bypass Road Brgy La Mesa Calamba City, Laguna

Email: novconph@gmail.com
Mobile No.: +639950123337

NOVCON BETA TEAM


MONTHLY MEETING
Date: April 07, 2022
Time: 10:00 am
Presider: Engr. Justine Lanuncia

I. Call to Order
The monthly meeting of NovCon BETA team was called to order by the
General Manager, Engr. Justine Lanuncia at 10:00 AM on April 07,2022.

II. Attendance Roll Call


A. Members present 20. Clarisse Anne Rocabo
1. Engr. Justine Lanuncia
2. Rey Bautista B. Members excused
3. Elmer C. Bautista 1. Mr. Rabbi Novillos
4. Rosemarie M. Javier
5. Noemi Malabrigo
6. Kenneth L. Casintahan
7. Ace Gabriel Jose
8. Federico Luis M. Platino
9. Marianne Joy Santiago
10. Rafael Burgos
11. Tatiana Kim S. Lubong
12. Lexter Collen T. Navarro
13. Dan Gabriel V. Nemis
14. Martin Villa Jr.
15. Engr. Ruled Jhosia Novillos
16. Ar. Reign Novillos
17. Mrs. Myra Novillos
18. Kim Alyssa Denosta
19. Kenneth Seguin

III. Agenda
A. Site Reports to be given by Project Managers (PM):
1. Dan Gabriel V. Nemis 5. Rafael C. Burgos
2. Ace Gabriel Jose 6. Tatiana Kim S. Lubong
3. Luis Federico M. Platino 7. Lexter Collen T. Navarro
4. Marianne Joy Q. Santiago

Page | 1
B. Marketing report to be given by
Marketing Head:
1. Ms. Rosemarie Javier
Site Reports

1. Ace Gabriel Jose


 Client De Guzman
o Roof Beam
o Truss Fabrication & Primer
o Concerns:
 Damaged Meralco Meter
 Stairs prep
 Truss Installation
 Land Fill
 Parapet Wall
 Client Arciaga
o Septic Vault
o Stair Fromworks
o 2f Column Rebars
o Roof Beam Rebar
o Gf Electrical
o Concerns
 Stair Layout (2 times revisions)
 Sako sa beam
 Misaligned Column
 Honeycombs on columns and beams
 Downspout
 Client Balina
o Beam and Slab formworks
o Slab Curing
o CHB Laying
o Excavation of Powder Room
 Client Pating
o CHB Laying
o Wall Plastering
o Septic vault excavation
o Concern:
 Waiting for Roofing Delivery

Engr. Justine:

 Requires Stiffener Column on Parapet Wall

Page | 2
2. Luis Federico M. Platino

 Client Morales
o Interior Plastering
o Gf CHB Laying
o Exterior Plastering
o Door Jamb Installation
o Electrical Works
o Metal Furring Installation
 Client Bahena-Diaz
o Exterior & Interior Plastering
o ACU Installation
o Electrical Works
o Metal Furring Installation
o Door Jamb Installation

Marketing Report

Rosemarie Javier

 Silver stage---20 projects


 Planning stage---7-On-going
o For TCP---5on-going
 Contract Signing
o Adriel Chung
 Bldg. Permit Processing
o Gladdy Patawaran
o John Marie Petilla
 For Groundbreaking
o Luya (Lot Survey)
o Acohon (Lot Survey)

3. Marianne Joy Santiago

 Client Gain
o CHB Laying
o Electrical & Plumbing
o Polyethylene Sheet Installation
 Client Abarentos
o Polyethylene Sheet Installation
o Soil Posioning
o Concrete Puring on Gf Slab
o Concerns:

Page | 3
 Leakage On Beam
 Client Morota
o Electrical & Plumbing Works
o AAC Block Installation
o Soil Poisoning and Compaction
 Client Macayana
o Slab Rebars & Concrete Pouring
o Electrical & Plumbing Works
o Concern:
 Blocked & Cut Some of Electrical

Engr. Ruled

 125 cm Clearance from GF Slab to 2F Slab


 Ideclare kay client na Pool lang ang additional walang equipment with
different brand
 Pool lang ang additional client na bahala sa equipments

4. Dan Gabriel V. Nemis

 Client Alcaraz
o Painting Works
o Installation of Window Frames
o Concerns:
 Walang Drop sa Laundry
 Cerujo ng wall tiles
 Client Mendoza
 Client Raguindin
o Exterior &n Interior Plastering
o Electrical
o Trusses
 Turnovers:
 Amamangpang
 Mahiya

Engr. Ruled

 Corner Beads sa kantuhan

5. Tatiana Kim S. Lubong

 Client Manalo
o Soil Poisoning

Page | 4
o Footing Tie Beam
o AAC Block Orientation

6. Lexter Collen T. Navarro

 Client Atibagos
o Wall footing
o Soil Poisoning
o Additional Wood slats
 Client Acohon
o Still Waiting foe Lot Survey

Tito rey:

 No Workers should work on the road

6. Rafael Burgos

 Client Malabo
 Client Cantor
 Client Sioson

IV. Adjournment
The meeting was adjourned by the presider at 11:31 AM.

Prepared by:

Lexter Collen T. Navarro

Transcriber of Minutes

Noted by:

Engr. Justine Lanuncia

General Manager, BETA team

Page | 5