Floor: Basement
1. In between grid 4-5 and Covering portion above glass door with cement Light Fixtures: 2-18 Watt
C-D board Led panel 300*300mm in
between grid B-C and C-D
2. In between grid 1-2 and Plaster work on brick masonry on upper ramp Painting work: Wall Surface
B-C inside basement on west side
in between grid 2-5 is not even
and seems single coated.
5. In between grid 1-2 and Painting work on brick masonry on upper ramp
B-C
3. Verification of okay
Documents
8. Library, Record & Mosquito net on windows is Door is too hard to push
Documentation to be placed Drooping of light fixtures and small
gaps
White patched on walls on south side
11. Reference Sample Mosquito net is yet to be Ac Wire without insulation on certain
Room(Plant Samples) placed. portion.
Cleaning of paints on
AC wires
SPS/ PLANT QUARANTINE AND REGIONAL PLANT PROTECTION LAB BUILDING, HARIHAR BHAWAN, LALITPUR
2. M & B Media Room Mosquito net on windows is yet to Drooping of light fixtures Glass door is good.
be placed Small gaps on walls of along
Cleaning of paint marks on AC AC outer boundary
wires
6. Entomology X-Ray sample Mosquito net on windows is yet to AC wire has no insulation on
preparation & Reference be placed certain portion
material Patch on false ceiling
10. Virology General Laboratory Mosquito net on windows is yet to White patch on wall on side of Water leakage problem is being
And Reference Specimens be placed AC rectified
Water leakage to basement
false ceiling through AC pipes
from Floor trap
13. Entomology Sample Mosquito net on windows is yet to Small gaps around light
Preparation & Glass be placed fixtures.
ware Small hole on wall above AC
fitting
15. Gents Toilet Fitting of urinal is not done yet Ceiling exhaust fan above Commode flush suction is not
shower is not that good in good
condition
Plumbing line for urinal was
not left before
11. Reference Sample Mosquito net on windows is yet Patches on walls around
Aug 17, 2020
2. Office Incharge Room Mosquito net on windows is yet Drooping of light fixtures
to be placed
Cleaning of paints on AC wires
3. Toilet Mirror light portion into Position of mirror and mirror light will
the windows be changed and aligned but they cannot
Mirror and basin is not change the position of basin.
aligned
5. Officer Room Second Mosquito net on windows is yet Drooping of light fixtures
to be placed
6. Admin & Account Room Mosquito net on windows is yet Hole on wall above AC
to be placed fitting.
7. Non Officers Room Mosquito net on windows is yet Hole on brick wall above
to be placed AC
8. Lobby okay
9. Pantry okay
11. Terrace Tile works infront of water tap in Cracks infront on Fitting of handrail on top of glass
between grid 3-4 projected paraphet wall railing is being carried out
Concrete has been set on the infront of Office in charge
terrace in between grid 5-6 and room and officer 2nd room
should be removed
12. Gents toilet Urinal partition is yet to be Commode Flush suction is not good.
placed
Floor: Roof
S.No. Rooms Remaining Works Defects Remarks
Others
others
Facade of building
Others